UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Smelting equipment

Induction furnaces for metal melting

UralInduktor designs and manufactures thyristor crucible smelting complexes for ferrous and non-ferrous metals in Kazakhstan; transistor plants are officially supplied from a proven partner plant. Frequency, inductor, lining, drive and cooling are calculated for metal, melting mass and filling requirements.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

Catalogue

Catalog of induction melting furnaces

Choose the furnace type and the metal. Each section contains models, loads, and the conditions for selecting the configuration.

Smelting furnaces for steel and cast iron

Specialized complexes for the processing of carbon, structural, alloy and special steels, as well as gray (RF) and high-strength (HF) cast iron. The single capacity of the crucible varies from 100 kg to several tons, and the power of the power converters from 100 kW to 1,5+ MW.

Furnaces for melting non-ferrous metals and alloys

Furnaces for melting copper, bronze, brass, aluminum, and jewelry alloys. The crucible, heating mode, and cooling are selected according to the metal grade, tapping temperature, and production program.

Induction smelting furnaces are energy-efficient and technological equipment designed for rapid melting, heating and finishing of the chemical composition of ferrous and non-ferrous metals. The UralInduktor plant designs and manufactures an industrial smelting complex of medium frequency type, which provides a minimum cost of a ton of suitable casting and withstands round-the-clock loads (24 / 7 mode).

Due to the high electrical efficiency (up to 95%) and the direct effect of the electromagnetic field on the furnace charge, induction heating eliminates intermediate heat losses, guaranteeing a pure melt with uniform alloy structuring.

Express selection

Select a melting system
for your task.

Standard configurations from laboratory-scale capacities up to 15 t. Custom solutions — to your technical specification.

ModelMetal and loadPowerGenerator
УИ-15ПSteel 3 kg, copper 10 kg20,01 kW (calculated)IGBTTransistor
УИ-35ПSteel 10 kg, copper 30 kg32,51 kW (calculated)IGBTTransistor
УИ-90ПSteel 40 kg, copper 120 kg87,54 kW (calculated)IGBTTransistor
УИ-0.1Т-100Steel, cast iron 100 kg100 kWТПЧThyristor
УИ-0.25Т-250Steel, cast iron 250 kg250 kWТПЧThyristor
УИ-0.5Т-400Steel, cast iron 500 kg400 kWТПЧThyristor
УИ-1Т-800Steel, cast iron 1 t800 kWТПЧThyristor
УИ-5Т-3000Steel, cast iron 5 t3 000 kWТПЧThyristor
УИ-15Т-8500Steel, cast iron 15 t8 500 kWТПЧThyristor
УИ-0.5Т-350МCopper, brass, bronze 500 kg350 kWТПЧThyristor
УИ-0.5Т-250АAluminum, silumin 500 kg250 kWТПЧThyristor

Can't find the configuration you need?

We will design a system for your metal, capacity, and melting mode.

Select based on the technical specification
s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Automation

Additional equipment for workshop automation

To meet the standards of modern digital production, furnaces can be equipped with:

PLC controllers with Touch-panel

Archiving melting charts, uploading data to ERP/MES and storing technological maps.

Lining Wear Control System

Automatic continuous leakage current monitoring to prevent liquid metal breakdown to the inductor.

Control-measuring complexes

Introduction of submersible thermocouples and contactless optical IR pyrometers.

Auxiliary mechanization

Pneumatic vibrothrowers lining, mechanisms of ejection of sintered crucible and system of bottom blowing with inert gas.

What is included in the supply of a melting system

The basic configuration is the same for all capacities; only the design of the units differs. Options — weight control, pyrometer, automatic lid, smoke removal system, and spare crucible — are agreed separately per the technical specification.

  • Power frequency converter. TFC cabinet with Techsem thyristors for medium and large furnaces, or a transistor IGBT generator for small capacities. Microprocessor control with automatic resonant frequency tuning and a set of electronic protections. Separate section: power section spare parts.
  • Capacitor bank in a cabinet. Electrothermal water-cooled capacitors in a protective metal cabinet, with water pressure and flow sensors and a busbar of increased cross-section for reactive power compensation.
  • Melting unit with inductor. Crucible of the specified capacity in a welded steel or silumin housing — per the project. Inductor made of profiled copper tube with inter-turn insulation of increased heat resistance.
  • Flexible water-cooled cables. Power cables of our own production for transmitting current from the bank to the inductor: they operate during furnace tilting without kinks or mechanical stress.
  • Furnace tilting mechanism. Hydraulic pump station with double-acting cylinders and manual emergency backup, or an electromechanical gearbox — depending on the capacity and the layout of the site.
  • Documentation, passports, and starting spare parts kit. Electrical and hydraulic diagrams, operator manual, crucible lining and sintering procedure, equipment passport, and starting set of spare parts.

transistor models: steel and cast iron 3–100 kg, copper 10–200 kg, aluminum 3–66 kg; small models for gold — from 1–2 to 8–10 kg;

- thyristor models of the catalog: from 100 kg to 15 t; larger or smaller garden, different power and automation are performed according to the technical task;

gear or hydraulic slope - by mass and mode of plums;

for thyristor complexes, the working circuit includes a frequency converter, a capacitor battery and one connected melting unit; for small and medium capacities, a typical execution with water-cooled cables 2 + 2, and for powerful complexes, the number of parallel cables increases; to reduce downtime, a second, backup node is recommended;

own assembly of frequency converter, capacitor batteries and water-cooled cables in Kazakhstan; official supply of transistor installations; warranty from 18 months.

Which technology to choose

TaskRecommended SeriesWhy
Laboratory, jewelry area, small partiesУИ-1П...УИ-10П, 30-80 kHzGold melting in batches from 1–2 to 8–10 kg; a high-density graphite crucible is selected to suit the version
Copper up to 200 kg, steel up to 100 kgУИ-15П...УИ-160П, 1-20 kHzTransistor source and a wide selection of smelters
Steel & Iron 100 kg15 tThyristor UIIndustrial frequency converter, gear or hydraulic drain
Copper, brass, bronze 100 kg10 tUI Series...MPower and frequency are designed for copper alloys
Aluminum & Silamine 100 kg3 tUI Series...AGeometry and power take into account the density of aluminum furnace charge

Transistor furnaces by metal

In the section transistor furnaces reference calculations of the capacity of magnesite crucibles up to the top edge are given for versions with sufficient initial data. The calculation for a cylindrical cavity at a liquid steel density of 7,0 kg/L does not replace the working load: the melt level must be below the edge.

Electricity consumption per ton of melt

MetalLower reference point, kWh/tUnder what conditions
Cast ironfrom 550Prepared dense furnace charge, short exposure, steady series cycle
Steelfrom 620Dry furnace charge of suitable size, without excessive overheating and idleness of the liquid bath
Copper and Bronzefrom 300Pure furnace charge, limited overheating; for brass mode is considered separately
Aluminum and Silminfrom 500Dry furnace charge, minimum exposure, no unreasonable overheating

This is not guaranteed consumption and is not the same norm for all furnaces. The flow rate at a particular melting point records the active energy meter. It is affected by loading, hot or cold start, share of shavings, moisture and pollution, slag, overheating, aging and operator skills.

Induction, arc, gas or resistance furnace

CriterionInductionDugovayaGas / Resistance
Optimal taskPeriodic melting of pure furnace charge, flexible change of brandsLarge-scale melting of steel and developed refining operationsSmelting or exposure of non-ferrous metals to a specific energy economy
Impact on MeltContactless energy input and electrodynamic mixingArc, slag and electrodes; higher refining capabilityHeating through crucible wall or heaters
Dust, gases and noise in the shopNo combustion products and electrodes; hood still neededHigher noise, dust and gas loadThere are combustion products at the gas furnace; resistance works without them
Expendable itemsLining, crucible, coolant and contour elementsElectrodes, lining, slag formingBurners or heaters, crucible and lining
Main limitationDoes not replace full-fledged refining; requires a prepared furnace chargeLarge infrastructure and less flexibility in small batchesSlower power maneuver; flow and burn depend on design

The induction furnace usually wins where compactness is needed, frequent brand changes, precise power management and there is no deep refining task in the furnace itself. For heavy-duty steel with intensive refining, arc technology may be preferable.

What is the melting complex

Standard working diagram of the thyristor complex: frequency converter - capacitor battery - one connected smelting unit. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used two between the frequency converter and the battery and two between the battery and the node. For large and multi-pulse systems, the quantity is determined by calculation. The second node is the recommended reserve and a separate option; at the same time, one frequency converter feeds only one node. Water-cooled cables are not cores of network input 380/660 V.

  • Frequency converter or transistor converter with power protections;
  • inductor from a profiled copper tube with liquid cooling;
  • futered melting unit or replaceable crucible;
  • gearbox drive with manual duplication or hydraulic drive;
  • reversible cooling system, calculated by thermal load;
  • local hood and safe organization of loading and release.

What an engineer checks before choosing a model

Metal and alloy brands: they determine temperature, lining, crucible and slag mode.

Float mass and release: The full cycle and number of floats are considered, not just the melting time.

Furnace charge: size, bulk density, return share, shavings, pollution and moisture.

Power supply: voltage, power, transformer and cable routes.

Cooling: Thermal power, coolant quality, standby pump and emergency stock.

Planning: foundation, heights, loading equipment, bottling ladles and fences.

Automation: sensors, recipes, archive, energy accounting, ICS TP and locks.

Operating frequency: for thyristor furnaces, the frequency given in the tables is typical — by agreement, UralInduktor can manufacture a system with a different design value. For furnaces with a capacity of up to 250 kg, one of the possible and often preferred versions is 2,5 kHz, if it suits the metal, the size and density of the charge, the melting unit geometry, and the required bath movement.

Free engineering selection from 1 working day

We analyze the technical task free of charge, select the model and equipment, pre-calculate power, variable performance, cooling and basic communications. The data can be sent in a free form or attached a completed questionnaire.

Why you can not promise one performance for any metal

Kilowatts and crucible mass do not give finished performance. The real stroke is influenced by the heat capacity and melting point of the alloy, the initial temperature of the furnace charge, its largeness, hot or cold start, the duration of metallurgical operations and losses during release. Therefore, the pages indicate the nominal load and power, and the performance is calculated in the technical proposal for a given mode.

The nominal load of a thyristor furnace is the mass of one calculated melting in the design geometry of the lining, and not the hourly performance. As natural operational wear lining useful volume of the working cavity increases, and the actual load can become higher than nominal; in some cases, the increase reaches 30 %. This is not an overload permit: the allowable load is determined by the condition and safe thickness of the lining, the melt level, and the stock to the board.

Such an approach is more useful to the buyer and safer for the project: the main metallurgist receives clear initial assumptions, the main power engineer receives a real attached load, and the operation service receives requirements for cooling, lining and spare parts.

Metallurgy and Lining

The induction furnace provides intensive energy input and electrodynamic melt mixing. It does not fix the contaminated furnace charge and does not cancel the technology of deoxidation, doping, degassing and slag formation. lining or replaceable crucible is selected by chemical compatibility with metal and slag, temperature, fluxes, exposure time and cold start mode; there is no one universal lining for all alloys.

steel and cast iron - for cast iron, an acidic quartzite lining or a neutral aluminosilicate alternative is often used; for steel - a neutral high-glynosemous spinel-forming, and with mainly slag and special brands, a magnesia system is possible;

  • copper, brass and bronze - silicate or high clay/mullet system; for copper-nickel and copper-iron alloys, the spinel high clay-earth mass is preliminarily considered;
  • aluminum - a high clay-earth working mass with an anti-wetting additive, selected for the exact alloy, fluxes and cleaning method;
  • precious, nickel and other special alloys - a separate compatible crucible or specially designed lining with melt pollution control.

UralInduktor can pick up and put the lining set under the agreed metal and mode: working mass, bottom materials, walls, collar and sock, coil protection, separation layer, repair composition, pattern and reserve for perfuming. The amount is calculated by the geometry of the melting point and the bulk density of the particular material; the filling, drying and sintering mode is taken only from the passport of the selected mixture.

Cooling and electrical safety

Continuous circulation of coolant through the inductor and power electronics is a condition of power resolution. In the contour, prepared water or water-ethylene glycol or water-propylene glycol mixture is used. Glycol is used mainly at the risk of negative temperatures; its concentration is taken into account in thermal and hydraulic calculation. For the thyristor complex, a UIG cooling tower is usually calculated, for a compact transistor installation, an industrial chiller. Cooling is always indicated by a separate position.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization. For transistor installations, there are separate passport pressure ranges.

For equipment of this class, separate grounding connections, switching, emergency shutdown, cable protection and work area fencing are designed. Coolant, currents, hot metal and hydraulics are considered together in the risk analysis.

The feeding line up to the frequency converter inlet is a separate three-phase input to L1, L2, L3 with PE. For models with 380 V and power frequency converter up to 500 kW, the cards show the calculated reference point for the total copper section to phase at the track to 30 m. Methodology: P / (1,732 × U × 0,93), stock 10 % by current, calculated density not exceeding 3 A/mm². This is not a finished cable scheme: the number of parallel cables and the nominal section of each housing is chosen by the owner ' s designer; for the permitted current of a particular cable, laying, temperature, harmonics, voltage drop, protection and short circuit current, the actual section may be increased. There is no numerical section on the website for powerful and design entries.

Why furnace has a 500 kg number of different cable orientations: the section determines the electric power and the voltage, not the mass of the float. At 380 V the V9 method УИ-0.5Т-400 for steel and cast iron has frequency converter 400 kW, calculated current around 654 A, current with a reserve of 10% about 719 A and a reference point of total copper about 240 mm² in phase. For УИ-0.5Т-350М for copper at 350 kW, the references are about 572/629 A and 210 mm²; for УИ-0.5Т-250А for aluminium at 250 kW = about 409/450 A and 150 mm². The number of parallel cables and the section of each housing shall be determined by the designer; the actual section may be increased by the conditions of the laying and permissible current of the selected cable.

Own power part and factory inspection

The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Small complexes often use MPU-6. control fees Means of measurement for which metrological verification is mandatory shall be used with valid verification.

performance check under load from 30 %;

element-by-element tightness check at 6 atm: inductors, collectors, reactor coils, connecting pipes, power thyristors liquid coolers and other cooled components; after assembly, the entire circuit is re-checked at 6 atm;

  • two test transformers according to 630 kVA and one 1120 kVA at the production site;
  • comprehensive verification of the power unit, protection, control, cooling and tilt; customer participation is possible in person or by video communication according to the agreed program.

Delivery, commissioning and service

The customer can choose equipment supply, installation supervision, installation, and commissioning, or bringing the melting area fully into operation. The full scope may include a survey, construction work, foundation, utilities, installation, trial melts, training, and handover for operation. The scope and acceptance criteria are fixed in the contract.

The production period of the serial thyristor complex is from 30 calendar days. The exact time depends on the performance and composition of the delivery and is fixed in the contract.

The engineering team has specialists with industry experience of more than 40 years. For large projects, Gross Metal Engineering LLP also attracts proven profile specialists with whom 13 has been cooperating for more than a year.

For selection, direct the metal brand, the weight of one melting, the replacement release, the parameters of the furnace charge, the voltage and the available power. Preliminary engineering selection, cooling calculation and commercial offer are performed free of charge - from 1 working day; the period of non-standard calculation depends on the completeness of the initial data.

How the cost of the smelting complex is formed

The cost is calculated individually by the metal, the mass of the nozzle, the power and frequency of the converter, the number of nodes, the type of tilt, cooling, automation and the volume of work. Quickly outdated prices on the site are not published. The duration of the offer, the schedule of payments and the procedure for fixing the value are fixed in the contract, taking into account the availability and stage of production or delivery.

Transparent structure of the commercial offer

The commercial proposal lists separately: 1) the furnace and the main agreed set; 2) the cooling system — УИГ for a thyristor system, or a chiller for a transistor unit; 3) on-site services — from installation supervision to a full range of construction and engineering work.

Payment, VAT and leasing

For running warehouse positions, prepayment from 10 % is possible, for large and individually designed installations - from 30 %. Leasing up to 5 years is issued through partner leasing companies; the decision, advance and schedule is determined by the leasing company. “Gross Metal Engineering” LLP operates under the general taxation system: equipment and services are supplied with VAT at the current rate and with closing documents.

Site preparation and layout in the shop

After the conclusion of the contract at the request of the customer, we place the complex free of charge on the provided workshop plan, indicate the service areas and characteristics of communications, provide recommended sketches of foundations and preparatory work. This is a layout task; working construction documentation is developed separately if included in the contract. Departure, measurements and consultations are possible by agreement.

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

Passports and documentation for the agreed execution are provided after the conclusion of the contract; the final set of passports and operational documentation is transferred with the equipment.

Diagnostics and modernization of furnaces of different manufacturers

"Gross Metal Engineering" LLP diagnoses, repairs and modernizes thyristor and transistor induction units of domestic and foreign manufacturers. If the furnace does not reach the specified mode, the power part, contour coordination, inductor, cooling, control and smelting technology are checked. The customer receives a written opinion with the reasons, priorities, works and components. Upon request, we attach to the conclusion a separate commercial offer for repair, replacement of nodes or modernization; it is not necessary to order subsequent works from Gross Metal Engineering LLP. A contractual guarantee is provided for the work performed.

Initial remote diagnosis is possible by photo, video, instrument readings and control messages; its volume and conditions are determined individually.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.

Frequently Asked Questions

Questions about ordering and supply

Didn't find an answer — call us, and an engineer will go through your task.

How is the cost of a furnace determined and how quickly is a proposal prepared?

The cost is calculated for the parameters of the site: metal, crucible capacity, power, and melting program. An engineer prepares a proposal with a technical specification and layout — free engineering selection takes from 1 business day.

Are commissioning, installation supervision, and staff training included?

Yes. Engineers' site visit, connection of the power section and cooling, sintering of the crucible lining, test melts on the customer's charge, and operator training. Details — commissioning and Staff training.

What is the warranty and how is the service organized?

Equipment of our own production is covered by a factory warranty from 18 months. Spare parts kit warehouse in Kazakhstan: thyristors, capacitors, water-cooled cables, and boards — induction equipment spare parts.

How and where do you deliver the equipment?

By road transport from our site in Kazakhstan to the customer's workshop across Kazakhstan and the CIS; large systems — in separate packages according to an agreed schedule. Self-pickup is possible.