UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 17
Own production own production in Kazakhstan

УИ-0.1Т-100 Induction Furnace for Steel and Iron on 100 kg

Availability and lead time — in the proposal as of the date of requestPrice on request
100 kg
Smelting weight, steel/iron
100 kW
Rated power of the thyristor frequency converter
750 V
Inductor voltage
gearbox or hydraulic drive
Tilting mechanism
  • Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
  • Melting of steel and cast iron — 100 kg in 45 minutes
  • 18 months warranty and efficiency up to 95 % own production

Description

УИ-0.1Т-100 is a thyristor crucible furnace for open smelting of steel and cast iron. Nominal output is 100 kg in steel/cast, frequency converter power is 100 kW, and typical operating frequency is 1 kHz. The model is considered for small casting sites, repair production and trial batches.

mass of one melting — 100 kg in steel / iron

Power part 100 kW; 380/50 V/Hz

metal drain - gear or hydraulic

design scenario - repair casting sites, experimental floats and the release of small batches without the accumulation of excess liquid metal

Frequency converter, capacitor battery and water-cooled cables for УИ-0.1Т-100 independently assemble in Kazakhstan; warranty — 18 months.

What is УИ-0.1Т-100 furnace suitable for

The furnace is designed for repair casting, experimental work and production of small steel or cast iron parts, when it is required to issue 100 kg and not to hold excess volume of liquid metal. It is appropriate for frequent brand changes, if the composition of furnace charge, lining and exhaust temperature are agreed for each material.

Technical specifications

ModelУИ-0.1Т-100
Nominal weight of one smelter for steel/iron, kg100
Rated power frequency converter, kW100
Lower specific flow referencefrom 550 kW·h/t for cast iron; from 620 kW·h/t for steel
Network voltage and frequency, V/Hz380 / 50
Calculated current and accepted stock to estimate the supply linecalculated current ≈ 164 A at 380 V; with stock 10 % ≈ 180 A
Estimated total copper cross-section reference point per phase up to 30 mУИ-0.1Т-100; Frequency converter 100 kW; 380 network / 50: calculated reference point for the sum of copper section ER ≈ 60 mm² per phase at an estimated current density of not more than 3 A/mm²; number of parallel cables and section of each individual housing determined by the customer designer
Water-cooled current supply internal HF-circuitNot a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. The number, cross-section and length are determined by calculation and specification; for small and medium capacities, the standard is the execution of a 2 cable on each of the two connections, for large complexes the number of parallel cables increases
Inductor voltage, B750
Operating frequency, kHzstandard 1; 2,5 - by calculation and agreement
Smelting materialssteel, cast iron
The body of the melting unitSilmin or steel weld - according to the project
Tilting mechanismgearbox or hydraulic drive
Configuration of the complexBase: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option
Revolving Cooling Systemcalculated and indicated by a separate position
Warranty18 months

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

For УИ-0.1Т-100, value from 550 kW·h/t for cast iron; from 620 kW·h/t for steel is the lower engineering benchmark for prepared furnace charge and sustainable cycle, not warranty. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.

Engineering sense of the model УИ-0.1Т-100

This is the minimum serial thyristor model of the family: 100 kg at 100 kW and 1 kHz. The transition to УИ-0.15Т-160 is justified not by "stock", but by a larger required issuance or calculation of the full production cycle.

The next model is УИ-0.15Т-160: 150 kg and 160 kW. The transition to it is justified only with a greater required extradition or a confirmed advantage of the full cycle.

The nominal value of 100 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.

As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.

Power supply and cooling

The rated power relative to the rated garden is 1000 kW/t; this is a comparative rather than a guaranteed performance measure. frequency converter 100 kW is powered by 380 / 50 V/Hz; standard operating frequency is 1 kHz, voltage circuit inductor is 750 V. Power input, transformer, switching, and network quality are checked before a connection task is released. For this small garden, the 2,5 kHz or other operating frequency can be calculated by agreement; the choice is made according to the brand of metal, the size and density of the furnace charge, the geometry of the crucible, the power and the required mixing of the bath.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet of УИ-0.1Т-100 with a track length of not more than 30: the calculation current ER ≈ 164 A at 380 V; with a reserve of 10 % E ≈ 180 A; the calculated reference point for the sum of the copper section of EE ≈ 60 mm² per phase at a calculation current density of not more than 3 A/mm²; the number of parallel cables and the section of each individual housing shall be determined by the customer ' s designer. Calculation methodology: P / (1,732 × U × 0,93 ), then stock 10 per cent by current; calculated density of not more than 3 A/mm² is accepted for the referenced sum copper. The 0,93 coefficient is the pre-estimation assumption; the actual RAC and power coefficient frequency converter need to be documented. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing shall be selected by the designer according to the allowable current of the particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.

Power УИ-0.1Т-100 is allowed only at confirmed flow, pressure and temperature of the coolant. Protective grounding, emergency shutdown, and a visible-break switch are part of the connectivity project.

Metallurgical constraints

Acid lining is not suitable for every slag regime; alloyed and special steels may require a basic or neutral system. The decision is made by the metallurgist on the composition of metal and slag.

Work with a reduced garden on the УИ-0.1Т-100 is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.

Lining and consumables

For УИ-0.1Т-100 liner can not be selected only by the model designation or the weight of the seat. For cast iron, an acidic quartzite dry mass or neutral aluminosilicate alternative is often considered; for carbon and low-alloy steel, a neutral high-glue spinel-forming one. High-alloy grades and basic slag may require a magnesia system.

UralInduktor can pick up and put the kit under the agreed steel/cast iron mode: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.

Supply scope and boundaries

The final composition of the УИ-0.1Т-100 is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

confirm the metal and the actual mass of issue for УИ-0.1Т-100;

calculate the full cycle of УИ-0.1Т-100: loading, melting, delivery of the composition, release and preparation;

check the network 380 / 50 V/Hz and power reserve taking into account auxiliary systems;

assign for УИ-0.1Т-100 a reverse cooling scheme, flow control and emergency stock;

agree for УИ-0.1Т-100 crucible or lining, loading method, ladle and local hood;

Manufacturing, commissioning and service

The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.

Thyristor installations are in production at all times; the serial execution of УИ-0.1Т-100 starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.

Information to include in your request

To specify УИ-0.1Т-100, provide the steel and cast iron grades, melt mass of 100 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.