UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Transistor smelting furnaces

Transistor furnaces for steel and cast iron

For small steel melts, the УИ-8П for 3 kg and the УИ-10П for 5 kg with magnesite crucibles are available. For steel and cast iron, the УИ-15П…УИ-160П with loads of 3–100 kg are offered. Models are compared by metal grade, tap mass, full cycle, and pouring method.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

10 models. Steel — 3–100 kg. Cast iron — in the УИ-15П…УИ-160П series; УИ-8П and УИ-10П with replaceable magnesite crucibles — for steel.

Models and loads

The table shows the mass of one melt in the agreed version. This is not productivity in kilograms per hour. The power consumption is given as a calculated guideline for preliminary selection of the network; the output power of the converter is not determined from it.

ModelLoading, kgCalculated consumption, kWFood, in
УИ-15П320,01380
УИ-25П525,64380
УИ-35П1032,51380
УИ-45П1842,52380
УИ-70П2565,65380
УИ-90П4087,54380
УИ-110П50112,55380
УИ-160П100150,06380

Small furnaces with magnesite crucibles for steel

ModelSteel, kgCrucibleCalculated consumption, kW
УИ-8П3Magnesite (MgO)31,91
УИ-10П5Magnesite (MgO)42,96

The УИ-8П and УИ-10П are shown in separate versions for steel. Graphite crucibles for gold are not used in place of magnesite ones. The cast iron load for these two versions is agreed separately.

Steel and cast iron require a separate crucible choice

The same load mass does not mean the same process mode. The metal grade, tapping temperature, slag composition, and number of cold starts determine crucible compatibility. For steel, the catalog lists magnesite crucibles; for cast iron, the material is confirmed separately. The small versions УИ-8П and УИ-10П on this page apply to steel only; cast iron loads are not given for them. When changing between incompatible alloys, a separate crucible is provided.

Working load and volume to the brim

The load is chosen with a freeboard allowance for the specific crucible geometry. The theoretical capacity up to the top edge from the general card is not an approved working mass. For the УИ-90П and УИ-110П, the internal dimensions of the magnesite crucible are agreed from the drawing of the version.

When to consider a thyristor system

The maximum load of the transistor series for steel and cast iron is 100 kg. For regular melts of this mass, the full cycle time, pouring, infrastructure, and cost are compared with a thyristor model for 100 kg. For a larger load, a thyristor system or a separate version per the technical specification is selected.

How to choose a model

For 3 kg of steel, the УИ-8П and УИ-15П are compared; for 5 kg — the УИ-10П and УИ-25П. For 10 kg of steel or cast iron, the УИ-35П is provided; for 25 kg — the УИ-70П. The larger model is chosen when a larger tap is really required or the calculation confirms a cycle advantage. Constant operation with a significantly underloaded crucible is checked for electrical matching and bath depth.

Configuration and connection

In the standard configuration, one transistor converter and one agreed melting unit are supplied. The crucible material, pouring method and controls are fixed by the specification. The chiller, extraction, installation and commissioning are listed as separate items unless they are expressly included in the proposal.

The power supply input is checked against the passport of the selected version and the full load of the area. Cooling is selected based on heat removal, flow rate, pressure and coolant quality. The frequency range refers to the operation of the agreed circuit; the operator is not expected to be able to set an arbitrary frequency.

Selection and supply

For the calculation, please provide the metal grade, the tap weight, the type of charge, the tapping temperature, the number of melts per shift, the power supply and the pouring method. UralInduktor will select the furnace, crucible and cooling, and prepare a proposal with the scope of supply and commissioning. The cost and lead time are fixed for the agreed configuration.

Standard warranty — 18 months. The availability of a specific configuration and readiness for shipment are confirmed when ordering.

Questions on selection and configuration

Where to start when choosing a furnace for steel

For 3 kg of steel, the УИ-8П with a magnesite crucible and the УИ-15П are available; for 5 kg — the УИ-10П with a magnesite crucible and the УИ-25П. The small УИ-8П and УИ-10П operate in the 30–80 kHz series, and the УИ-15П and УИ-25П in the 1–20 kHz series. With the same mass, the selected melting unit, full cycle, pouring, and connection are compared. For cast iron, the small versions for 3 and 5 kg are not confirmed by this data.

What to check for steel and cast iron

The inquiry should specify the metal grade, tap mass, and tapping temperature, the charge type, and the required melt operations. For the crucible, compatibility with the metal, slag, and operating mode is checked. If the project provides for changing alloys, separate crucibles and the replacement procedure are determined in advance to limit contamination of the next melt.

How to determine productivity per shift

The calculation requires the mass of usable metal per tap, the full melting cycle and the available working time. The cycle includes loading, heating, composition adjustment, holding, pouring and preparation of the next melting. Melting loss, slag removal and the process residue are taken into account separately. The load mass in kilograms does not mean the same productivity in kilograms per hour.

Can the existing cooling be used

Yes, after checking the temperature, flow rate and pressure of the coolant, its quality and the available cooling capacity. The simultaneous load of the converter and the melting unit, the length of the lines and the operation of interlocks are checked. The presence of a pump or chiller on site does not by itself confirm compatibility with the furnace.

What the supply proposal includes

The proposal lists separately the converter, melting unit, crucible, pouring method, cooling, controls, documentation and on-site work. The standard scheme contains one converter and one agreed melting unit. A second unit, a chiller, extraction, installation and commissioning are included in the supply only according to an agreed specification.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.