UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 3

УИ-15П transistor melting furnace

Price on request
3 kg
Steel and cast iron
10 kg
Copper
3 kg
Aluminium
20,01 kW
Estimated power consumption
  • Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
  • Melting steel and cast iron up to 3 kg, copper up to 10 kg, aluminum up to 3 kg per cycle
  • Transistor IGBT modules, 18-month warranty — official supply from the partner plant

Description

УИ-15П is a transistor melting furnace for small production batches. The load depends on the selected version: steel and cast iron 3 kg; copper 10 kg; aluminum 3 kg. The operating frequency is 1–20 kHz, the power supply is 380 V; the calculated power consumption is 20,01 kW.

  • load — steel and cast iron 3 kg; copper 10 kg; aluminum 3 kg
  • power supply — 380 V; calculated power consumption — 20,01 kW
  • metal drain - by performance
  • purpose — for small medium-frequency melts of 3 kg of steel or 10 kg of copper with one compact melting unit
  • УИ-15П is officially supplied by the partner factory; warranty 18 months.

What is УИ-15П furnace suitable for

The УИ-15П is designed for melts of up to 3 kg of steel or 10 kg of copper and is used when an operating frequency in the range of 1–20 kHz is required for melting in a small crucible. The choice is based on the metal and the inductor geometry, not on the fact that the index is higher than that of the УИ-10П.

Technical specifications

ModelУИ-15П
Capacity by metalsteel and cast iron 3 kg; copper 10 kg; aluminum 3 kg
Crucible for copper: materialSilicon carbide (SiC)
Copper crucible dimensions, mm142(110) × 90 × 180
Crucible for steel: materialMagnesium oxide (MgO)
Steel crucible dimensions, mm91(65) × 180(165)
Inner diameter d for calculation, mm65
Inner depth h for calculation, mm165
Calculated volume to the brim, L0,548
Theoretical capacity for liquid steel to the brim, kg≈ 3,8
Estimated power consumption, kW20,01
Power supply voltage, V380
Operating frequency, kHz1–20
Current consumption, A32
Cooling water flow rate, L/min9–29
Cooling water pressure, MPa0,15–0,25
Maximum coolant temperature, °C40
Overall dimensions, mm470 × 280 × 460 / 480 × 240 × 510
Weight, kg28 / 26
Convertertransistor, water-cooled
Drainage mechanismfor execution
Standard configuration1 transistor converter + 1 melting unit
Warranty18 months

Crucibles for melting copper and steel

For copper, a silicon carbide crucible 142(110) × 90 × 180 mm is provided; for steel, a magnesite crucible based on magnesium oxide (MgO), 91(65) × 180(165) mm. For bronze, cast iron, and other alloys, crucible compatibility is specified according to the composition and melting mode.

The calculation up to the upper edge was made for a cylindrical cavity: V = πd²h/4, m = ρV. In the notation D(d) × H(h), the numbers in parentheses are taken as the inner diameter and depth. The density of liquid steel is taken as 7,0 kg/L. Taper, fillets and thermal expansion of the crucible are not taken into account.

Capacity to the brim is a theoretical estimate under the stated assumptions. The working melt level is set below the rim; the nominal furnace load is given separately.

Overall dimensions — 470 × 280 × 460 / 480 × 240 × 510 mm; weight — 28 / 26 kg. The paired dimensions and weights refer to the two equipment units in the order given in the original specification. The layout plan and connection dimensions are specified from the dimensional drawing.

УИ-15П model differences

The calculated power consumption is 20,01 kW at a current of 32 A. The operating frequency of 1–20 kHz and loads of 3 kg of steel or 10 kg of copper refer to a different melting unit than that of the УИ-10П. The designations of adjacent models do not define a continuous capacity series for a single metal.

The next model in the same 1–20 kHz series is the УИ-25П (5 kg of steel or 20 kg of copper; calculated consumption 25,64 kW). The УИ-10П belongs to the high-frequency series for gold and is not a smaller version of this furnace. The comparison is made by the selected metal, the mass of a single tap, the full cycle time, and the infrastructure cost.

Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.

Melting of aluminum and aluminum alloys

For the УИ-15П, the aluminum load is 3 kg in the version with a matched crucible and inductor. The crucible is selected by alloy, temperature, and fluxes; a steel crucible is not automatically carried over to aluminum.

For silumin, the working weight is specified by grade. With bulky returns or chips, batch loading may be required. The full cycle is calculated taking into account the charge, melting loss, holding and pouring.

Melting of cast iron and copper alloys

The cast iron load is 3 kg, the same as for steel. Crucible compatibility and mode are checked against the cast iron grade. For copper, the load is 10 kg; for brass, bronze, and other copper alloys, the permissible mass is specified according to the melt density, the usable volume of the crucible, and the tapping temperature.

Power supply and cooling

Power supply — 380 V; current consumption — 32 A. The converter provides an operating frequency of 1–20 kHz and requires continuous liquid cooling. The calculated power consumption of 20,01 kW serves as a guideline for a preliminary assessment of the network and is not the rated output power. The cable, protection, transformer, and allocated power are checked against the passport of the version, including auxiliary consumers. Cooling water flow rate — 9–29 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The thermal load of the entire unit and the distribution of flow among the circuits are calculated when designing the cooling system.

Switching on the heating of the УИ-15П is permitted only when the flow, pressure, and temperature of the coolant are confirmed. Protective grounding, emergency shutdown, and a switching device with a visible break are included in the connection design.

Metallurgical constraints

For each group of metals, a compatible crucible is used; one crucible should not be considered universal. The remnants of the previous alloy can contaminate the next smelter.

For УИ-15П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.

Supply scope and boundaries

The standard configuration of the УИ-15П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor or matching unit, liquid-cooled current leads (power leads), controls, and documentation are assigned according to the model and the metal. A second melting unit can be supplied only as an additional version per the technical specification; one converter is not designed to power two units simultaneously. Cooling, transformer, fume extraction, foundation, installation, and commissioning are listed in separate lines unless included in the specification.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

  • define the set of functions of the PLC, archiving, energy metering, and exchange with the process control system for the УИ-15П;
  • confirm the metal and the actual mass of issue for УИ-15П;
  • calculate the full cycle of УИ-15П: loading, melting, delivery of the composition, release and preparation;
  • check the 380 V network and the power reserve, taking auxiliary systems into account;
  • assign for УИ-15П a reverse cooling scheme, flow control and emergency stock;

Manufacturing, commissioning and service

Before delivery, the УИ-15П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.

Popular versions of the УИ-15П are kept in stock under the warehouse program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, which is listed as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service, and repair.

Information to include in your request

To calculate the УИ-15П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V network, the existing cooling, the required crucible, and the pouring method.

Questions on selection and configuration

Which loads apply to the selected version

For the УИ-15П, separate loads are specified: steel and cast iron — 3 kg, copper — 10 kg, aluminum — 3 kg. These are application options of the model with a matched crucible and melting unit. For brass, bronze, silumin, gold, and silver, the permissible mass is specified according to the alloy and version; the same figure for different metals does not mean the crucibles are interchangeable.

How to match a furnace to the production program

First, specify the mass of usable metal required by the time of pouring and the number of taps per shift. Then compare the full cycle, whether the charge fits in the crucible, the pouring method and the available infrastructure. The chiller and the power supply input are checked for the whole installation. A higher model index by itself does not confirm a lower cost or a shorter cycle.

Which parameters to specify when ordering

For the УИ-15П, the specification records the metal grade, the working load and melt level, the crucible material and drawing, the pouring method, the cooling, and the controls. The calculated consumption of 20,01 kW is used for a preliminary assessment of the network; the final power supply requirements are taken from the passport of the version, taking auxiliary systems into account.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.