UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 4
Own production own production in Kazakhstan

УИ-0.5Т-250А Induction Furnace for Aluminum and Silamine on 500 kg

Availability and lead time — in the proposal as of the date of requestPrice on request
500 kg
Smelting weight, aluminum
250 kW
Rated power of the thyristor frequency converter
1500 V
Inductor voltage
gearbox or hydraulic drive
Tilting mechanism
  • Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
  • Melting of aluminum and aluminum alloys weight up to 500 kg per cycle
  • 18 months warranty and efficiency up to 95 % own production

Description

УИ-0.5Т-250А is a thyristor crucible furnace for open smelting of aluminum. The nominal rating is 500 kg in aluminum, the frequency converter is 250 kW, and the typical operating frequency is 1 kHz. The model is considered for small and medium serial casting.

weight of one smelter 500 kg for aluminum

Power part 250 kW; 380/50 V/Hz

metal drain - gear or hydraulic

design scenario - serial aluminum casting by 500 kg in the control of dryness and volume of furnace charge

Frequency converter, capacitor battery and water-cooled cables for УИ-0.5Т-250А independently assemble in Kazakhstan; warranty — 18 months.

What is УИ-0.5Т-250А furnace suitable for

The semi-tone version is designed for regular production of aluminum and silymin castings, when 500 kg correspond to the technological batch. It requires organized loading of dry furnace charge, removal of the throttle and coordinated pouring without extra exposure.

Technical specifications

ModelУИ-0.5Т-250А
Nominal weight of one aluminum smelter, kg500
Rated power frequency converter, kW250
Lower specific flow referencefrom 500 kW·h/t for aluminum and silumina
Network voltage and frequency, V/Hz380 / 50
Calculated current and accepted stock to estimate the supply linecalculated current ≈ 409 A at 380 V; with stock 10 % ≈ 450 A
Estimated total copper cross-section reference point per phase up to 30 mУИ-0.5Т-250А; Frequency converter 250 kW; 380 network / 50: calculated reference point for the sum of copper section ER ≈ 150 mm² per phase at an estimated current density of not more than 3 A/mm²; number of parallel cables and section of each individual housing determined by the customer designer
Water-cooled current supply internal HF-circuitNot a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. The number, cross-section and length are determined by calculation and specification; for small and medium capacities, the standard is the execution of a 2 cable on each of the two connections, for large complexes the number of parallel cables increases
Inductor voltage, B1500
Operating frequency, kHzstandard 1; other - by calculation and agreement
Smelting materialsaluminum and aluminum alloys
The body of the melting unitSilmin or steel weld - according to the project
Tilting mechanismgearbox or hydraulic drive
Configuration of the complexBase: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option
Revolving Cooling Systemcalculated and indicated by a separate position
Warranty18 months

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

For УИ-0.5Т-250А, the value from 500 kW·h/t for aluminum and silumin is the lower engineering benchmark for a prepared furnace charge and a sustainable cycle, not a guarantee. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.

Engineering sense of the model УИ-0.5Т-250А

Compared to the УИ-0.35Т-200А, the model increases the garden on the 150 kg and the power on the 50 kW. The choice is made by the useful output of metal and a batch of forms; it is impossible to transfer the indicators of a copper or steel furnace of the same mass to it.

Below in the line is УИ-0.35Т-200А (350 kg, 200 kW), above is УИ-0.75Т-350А (750 kg, 350 kW). The comparison is made by the mass of a single issue, full stroke, available power and the cost of infrastructure.

The nominal value of 500 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.

As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.

Power supply and cooling

Frequency converter 250 kW is powered by 380 / 50 V/Hz; standard operating frequency is 1 kHz, voltage circuit inductor is 1500 V. Power input, transformer, switching, and network quality are checked before a connection task is released. The rated power relative to the rated garden is 500 kW/t; this is a comparative rather than a guaranteed performance measure. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet of УИ-0.5Т-250А with a track length of not more than 30: the calculation current ER ≈ 409 A at 380 V; with a reserve of 10 % E ≈ 450 A; the calculated reference point for the sum of the copper section of EE ≈ 150 mm² per phase at a calculation current density of not more than 3 A/mm²; the number of parallel cables and the section of each individual housing shall be determined by the customer ' s designer. Calculation methodology: P / (1,732 × U × 0,93 ), then stock 10 per cent by current; calculated density of not more than 3 A/mm² is accepted for the referenced sum copper. The 0,93 coefficient is the pre-estimation assumption; the actual RAC and power coefficient frequency converter need to be documented. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing shall be selected by the designer according to the allowable current of the particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.

Power УИ-0.5Т-250А is allowed only at confirmed flow, pressure and temperature of the coolant. Protective grounding, emergency shutdown, and a visible-break switch are part of the connectivity project.

Metallurgical constraints

Wet furnace charge is unacceptable: contact of water with melt creates a risk of ejection. At the site organize drying, storage and visual control of downloaded materials.

Work with a reduced garden on the УИ-0.5Т-250А is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.

Lining and consumables

For УИ-0.5Т-250А liner can not be selected only by the model designation or the weight of the seat. For aluminum alloys, a high clay-earth dry mass with an anti-wetting additive is considered. The composition is specified by the alloy brand, fluxes, temperature, aging and cleaning method.

UralInduktor can pick up and put the kit under the agreed mode of aluminum: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.

Supply scope and boundaries

The final composition of the УИ-0.5Т-250А is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

agree for УИ-0.5Т-250А crucible or lining, loading method, ladle and local hood;

fix the discharge performance: gear or hydraulic;

determine for УИ-0.5Т-250А the amount of PLC, archiving, energy metering and exchange with ICS;

confirm the metal and the actual mass of issue for УИ-0.5Т-250А;

calculate the full cycle of УИ-0.5Т-250А: loading, melting, delivery of the composition, release and preparation;

Manufacturing, commissioning and service

The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.

Thyristor installations are in production at all times; the serial execution of УИ-0.5Т-250А starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.

Information to include in your request

To specify УИ-0.5Т-250А, provide the aluminium grades, melt mass of 500 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.