For small melts of copper, copper alloys, and gold, we select the УИ-1П…УИ-10П versions. The gold load in this series is from 1–2 to 8–10 kg; the copper mass is determined for the selected crucible. In the УИ-15П…УИ-160П series, the copper load is 10–200 kg. For brass and bronze, the alloy grade is taken into account.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

14 models. Copper — 10–200 kg in the УИ-15П…УИ-160П series. The small series — for small copper and gold melts; we specify the alloy load according to the crucible.

Models and loads

The load is given per melt. The calculated power consumption serves as a guideline for the network and is not equal to the output power of the converter.

ModelLoading, kgCalculated consumption, kWFood, in
УИ-15П1020,01380
УИ-25П2025,64380
УИ-35П3032,51380
УИ-45П5042,52380
УИ-70П10065,65380
УИ-90П12087,54380
УИ-110П150112,55380
УИ-160П200150,06380

Small series for copper, copper alloys and gold

ModelGold, kgCopper, kg — calculationFood, in
УИ-1П1–2up to 0,55220
УИ-2П3–4up to 1,10380
УИ-3П4–5up to 1,95380
УИ-5П5–6up to 2,50380
УИ-8П6–8up to 5,90380
УИ-10П8–10up to 6,80380

The calculation for the small series was made for a cylindrical cavity: V = π × d² × [H − (D − d) / 2] / 4. D is the outer diameter, d is the inner diameter, H is the overall height; the bottom thickness equals the wall thickness. If the dimensions are given in millimeters, the volume by this formula comes out in cubic millimeters. To convert to liters, it is divided by 1 000 000. For the calculation, a fill of 95% of the volume was assumed; the result is rounded down in steps of 0,05 kg. Densities of pure liquid metals at the melting temperature: copper 8,0 kg/L, aluminum 2,385 kg/L. The «up to…» values are calculated guidelines, not rated loads; the profile, working level, alloy, and crucible compatibility are confirmed in the specification. These masses are not automatically carried over to brass and bronze.

Copper, brass and bronze

The numbers in the first table refer to copper. For brass and bronze, the working load is specified according to the composition and density of the alloy, the tapping temperature, and the usable volume of the crucible. For brass, zinc evaporation and the operation of local fume extraction are taken into account; the copper mode is not automatically applied to it.

Choosing a crucible for the metal

For copper, the cards of the УИ-15П…УИ-160П list silicon carbide crucibles; for small gold-melting models, graphite ones. Compatibility with the exact alloy, flux, and temperature is checked before ordering. Separate crucibles are provided for different alloy groups to limit contamination of the melt. For gold and silver in the УИ-15П…УИ-160П, the load is agreed separately by version.

Full melting cycle

The cycle includes loading, melting, adjustment of the composition, holding, and pouring. A cold start and a series of melts give different times and energy consumption. Productivity is calculated for the selected metal and the tapping schedule.

Configuration and connection

In the standard configuration, one transistor converter and one agreed melting unit are supplied. The crucible material, pouring method and controls are fixed by the specification. The chiller, extraction, installation and commissioning are listed as separate items unless they are expressly included in the proposal.

The power supply input is checked against the passport of the selected version and the full load of the area. Cooling is selected based on heat removal, flow rate, pressure and coolant quality. The frequency range refers to the operation of the agreed circuit; the operator is not expected to be able to set an arbitrary frequency.

Selection and supply

For the calculation, please provide the metal grade, the tap weight, the type of charge, the tapping temperature, the number of melts per shift, the power supply and the pouring method. UralInduktor will select the furnace, crucible and cooling, and prepare a proposal with the scope of supply and commissioning. The cost and lead time are fixed for the agreed configuration.

Standard warranty — 18 months. The availability of a specific configuration and readiness for shipment are confirmed when ordering.

Questions on selection and configuration

How to choose between copper and gold

For copper in the УИ-15П…УИ-160П series, loads of 10–200 kg are given. For the small УИ-1П…УИ-10П, gold ranges from 1–2 to 8–10 kg and calculated guidelines for copper at a 95% fill are given separately. The gold range refers to the configuration options of the model; the reference size for the geometric calculation of copper does not confirm the entire gold range in a single crucible. Before ordering, the drawing of the selected crucible and the working melt level are checked.

What data is needed for brass and bronze

Provide the exact alloy grade, the mass of usable metal per tap, the type of returns, the pouring temperature, and the fluxes used. This makes it possible to select the crucible material and determine the working mass. For brass, local fume extraction and a mode that accounts for zinc evaporation are also agreed; values for pure copper do not replace process selection.

How to determine productivity per shift

The calculation requires the mass of usable metal per tap, the full melting cycle and the available working time. The cycle includes loading, heating, composition adjustment, holding, pouring and preparation of the next melting. Melting loss, slag removal and the process residue are taken into account separately. The load mass in kilograms does not mean the same productivity in kilograms per hour.

Can the existing cooling be used

Yes, after checking the temperature, flow rate and pressure of the coolant, its quality and the available cooling capacity. The simultaneous load of the converter and the melting unit, the length of the lines and the operation of interlocks are checked. The presence of a pump or chiller on site does not by itself confirm compatibility with the furnace.

What the supply proposal includes

The proposal lists separately the converter, melting unit, crucible, pouring method, cooling, controls, documentation and on-site work. The standard scheme contains one converter and one agreed melting unit. A second unit, a chiller, extraction, installation and commissioning are included in the supply only according to an agreed specification.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.