UI series with index A is designed for aluminum and aluminum alloys. The choice takes into account the low density of the furnace charge, the requirements for dry loading, degassing and limiting overheating, as well as the actual volume of the crucible.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

Induction smelting furnaces of own production from 100 kg to 15 tons of loading. Choose a model by weight of melting and power.

11 models

Standard working diagram of the thyristor complex: frequency converter - capacitor battery - one connected smelting unit. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used - two for each connection. For large and multi-pulse systems, the number determines the calculation. The second melting node is offered as a recommended reserve and a separate option; at the same time, only one node works from a single frequency converter.

11 standard models in the line;

power range — 100–1500 kW;

loading range on the main table metal 100–3000 kg;

cost and time - after the coordination of metal, production, power supply and equipment;

18 months warranty, after-launch service and spare parts.

Model series

ModelLoading, kgFrequency converter, kWNetwork, V/HzTypical frequency, kHzTilt
УИ-0.1Т-100А100100380 / 501gearbox or hydraulic drive
УИ-0.15Т-100А150100380 / 501gearbox or hydraulic drive
УИ-0.25Т-160А250160380 / 501gearbox or hydraulic drive
УИ-0.35Т-200А350200380 / 501gearbox or hydraulic drive
УИ-0.5Т-250А500250380 / 501gearbox or hydraulic drive
УИ-0.75Т-350А750350380 / 501gearbox or hydraulic drive
УИ-1Т-500А1 000500380 / 500,5gearbox or hydraulic drive
УИ-1.5Т-750А1 500750380 / 500,5gearbox or hydraulic drive
УИ-2Т-900А2 000900660 / 500,5Hydraulic
УИ-2.5Т-1200А2 5001 200660 / 500,5Hydraulic
УИ-3Т-1500А3 0001 500660 / 500,2Hydraulic

The table on furnaces for aluminum and silumin is intended for primary selection. Inductor voltage, transformer, cooling, housing, lining and actual performance are confirmed by engineering calculation and specification. The table shows the typical operating frequency. As agreed, UralInduktor can manufacture a thyristor furnace with a different design value. For pre-250 kg furnaces, one possible and often preferred performance is the 2,5 kHz. When choosing, the high electrical conductivity and low density of aluminum, the size of the furnace charge, the geometry of the crucible, the oxide film and the necessary melt mixing intensity are taken into account.

Specific consumption and productivity

The lower benchmark for aluminum and silumin is from 500 kW·h/t with dry furnace charge, limited overheating and no long bath exposure.

The variable performance of the aluminum and silumin section is obtained from the full stroke, rather than from the division of power by mass. The stroke includes loading, melting, metallurgical operations, overheating, draining and preparing the next melting.

Nominal load means the mass of one calculated melting in the design geometry of lining, and not release per hour. As the lining wears naturally, the working cavity increases, so the actual load can become higher than the nominal one; in some cases, the gain relative to the nominal reaches 30 %. This is not a permit to overload: the allowable load is determined by the actual condition and safe thickness of the lining, the bath level and the stock to the board.

How to choose neighboring models

If the two models for aluminum and silumin have the same load, but different power, the more powerful is not always automatically more profitable. It requires more attached power and cooling system, but can reduce the electrical part of the cycle. The choice is made according to the full stroke, the schedule of bottling and the cost of infrastructure.

For aluminum and silumin, the stock in terms of the volume of the crucible is needed for a safe bath level and a specific furnace charge, but constant work with too little loading is also undesirable. The engineer checks the electrical alignment, the depth of the bath, the mixing and the possibility of the technological residue.

Technological features

For aluminum and silymins, the main technological risks are humidified furnace charge, hydrogen saturation, oxide film formation and iron contamination. Dry materials are loaded into the furnace; moisture in the melt is unacceptable. The temperature is carried out without unreasonable overheating, and flushing and degassing is prescribed according to the alloy brand and casting requirements.

Due to the lower density of aluminum, the same mass takes up more volume than steel or copper. Therefore, the actual capacity, the geometry of the crucible and the method of loading are checked by aluminum furnace charge, including the size of the scrap, the share of chips and the return.

Lining for Aluminum Alloys

For aluminum, a preliminary choice is a high-clay dry ramming mass with an anti-wetting additive that reduces metal adhesion and penetration. The specific composition depends on the brand of aluminum alloy, fluxes, temperature and duration of aging, cleaning method and cyclicality of work. Material without confirmed resistance to aluminum can not be assigned.

UralInduktor can pick up and supply a working mass and a full set of related materials, calculate the amount according to the geometry of the node and prepare requirements for sealing, drying and first heating according to the passport of the selected refractor. From the customer you need accurate brands of alloys, fluxes, temperatures and a description of the cleaning of the furnace.

Power supply

The characteristics of the thyristor furnace indicate the nominal power of the frequency converter. The total attached power of the site is calculated separately taking into account the cooling system, hydraulics, actuators and other auxiliary consumers.

For a separate 3-phase line L1, L2, L3 from the customer's distribution device or secondary wrapping of the transformer to frequency converter in the cards, the calculated reference point of the total copper section per phase at a distance of not more than 30 m is given. Methodology: P / (1,732 × U × 0,93), stock 10 per cent by current and calculated density not exceeding 3 A/mm². The number of parallel cables and the nominal section of each housing shall be determined by the designer of the customer. The public orientation does not replace the verification of the permissible current of the selected cable mark, temperature and manner of laying, grouping, harmonica, voltage drop, protection and short circuit current; the actual section may be increased. PE is calculated separately, N is calculated by passport if necessary.

Cooling, extraction and placement

For aluminum and silumin furnaces, the flow rate, head, and thermal power of the cooling are calculated after the TFC, the number of units, the length of the pipe runs, and the coolant have been selected. Furnaces up to 1,5 t and УИГ cooling towers are often in stock or included in the production program, but cooling is always listed as a separate item. Standard thyristor systems are in continuous production; the manufacturing time is from 30 calendar days, and the exact readiness date is fixed in the contract.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

  • clean inner circuit power electronics and furnace inductor for aluminum and silumin;
  • the main and backup pump of the aluminum and silumin section - according to the reliability category;
  • control of pressure, flow and temperature with automatic blocking of power supply in case of violation of cooling parameters of the furnace for aluminum and silumin;
  • Emergency cooling and safe discharge of aluminum and silumin melt;
  • local extraction for melting aluminum and silumin, fluxes and loading method.

Equipment and options

In a proposal for aluminum and silumin furnaces, the base supply, options, and on-site work are shown separately. The specification lists the converter, capacitor bank, melting units, current leads (power leads), controls, and templates. Cooling, transformer, lining materials, fume extraction, foundation, installation, and commissioning are not considered included unless expressly stated.

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

For the aluminum and silymine melting line, PLCs and touchscreens are used for recipes, archiving and integration; they are not considered mandatory without specification. Lining control, weighing, pyrometry, vibration tamping and cooling reserve are also issued as separate options.

Production and launch

Before delivery, the own complex is checked under load at power from 30 %. Liquid cooling components and then the assembled circuit are tested for tightness at 6 atm; the customer participation format is agreed separately.

Thyristor units are in constant production; the lead time for the standard version is from 30 calendar days. Furnaces of up to 1,5 t are often in stock or included in the production program. The exact readiness depends on the power, housing, automation and scope of supply and is fixed in the contract.

In the direction of induction melting, 223 supply furnaces have been confirmed. For aluminum and silumin projects, Gross Metal Engineering LLP independently assembles in Kazakhstan a frequency converter, capacitor batteries and water-cooled cables, performs installation, commissioning and subsequent service. Standard warranty for own equipment is 18 months.

Free engineering selection

Free comparison of metal, mass of the garden, replacement output, available power and layout with the parameters of equipment for aluminum and silumin. Preliminary calculation of furnace, cooling and basic communications and commercial offer will be prepared from 1 working day; non-standard project is evaluated after technical specification analysis.

Cost and contractual terms

The cost depends on the power, number of units, drive, cooling, automation and the composition of the work and is indicated only in the current commercial offer. For running warehouse positions, prepayment from 10 % is possible, for large and individual projects - from 30 %. The order of payment and fixation of the price is agreed individually. Equipment and services of "Gross Metal Engineering" LLP are supplied with VAT at the current rate; leasing up to 5 years is available through partner companies.

Diagnostics and modernization

With insufficient performance, we estimate frequency converter, inductor, cooling, volume and dryness of furnace charge, overheating, degassing and throttle handling. Based on the results, we issue a written conclusion with the reasons, priority of work and components. An audit can be ordered separately, without mandatory repair; a guarantee is provided for the work performed under the contract.

Baseline for KP

  • aluminum and silymine grades and composition of furnace charge;
  • mass of one smelting of aluminum and silumin and required release per shift;
  • the temperature of aluminum and silumin release and the duration of exposure;
  • Network voltage for the aluminum and silumin section, dedicated power and transformer;
  • layout of the aluminum and silumin section, loading method, bottling ladles and heights;
  • cooling, heat transfer, extraction and automation of the aluminum and silumin section.

After obtaining data on aluminum and silumin, the engineer offers a model or several comparative options, shows the composition of the supply and separately calculates the installation, commissioning and infrastructure.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.