UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Smelting equipment

Induction melting furnaces for steel and cast iron

Thyristor crucible furnace for open steel smelting and cast iron are presented with typical downloads from 100 kg to 15 t. The 15 model is not a limit: gardening, power frequency converter, number of nodes, automation and infrastructure are calculated by technical task. Up to 1,5 is available for reductive and hydraulic performances; large complexes are designed with steel hull, magnetic lines and hydraulic inclination.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

Induction smelting furnaces of own production from 100 kg to 15 tons of loading. Choose a model by weight of melting and power.

19 models

Standard working diagram of the thyristor complex: frequency converter - capacitor battery - one connected smelting unit. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used - two for each connection. For large and multi-pulse systems, the number determines the calculation. The second melting node is offered as a recommended reserve and a separate option; at the same time, only one node works from a single frequency converter.

18 standard models in the line;

power range — 100–8500 kW;

loading range on the main table metal 100–15000 kg;

cost and time - after the coordination of metal, production, power supply and equipment;

18 months warranty, after-launch service and spare parts.

Model series

ModelLoading, kgFrequency converter, kWNetwork, V/HzTypical frequency, kHzTilt
УИ-0.1Т-100100100380 / 501gearbox or hydraulic drive
УИ-0.15Т-160150160380 / 501gearbox or hydraulic drive
УИ-0.25Т-160250160380 / 501gearbox or hydraulic drive
УИ-0.25Т-250250250380 / 501gearbox or hydraulic drive
УИ-0.35Т-300350300380 / 501gearbox or hydraulic drive
УИ-0.5Т-400500400380 / 501gearbox or hydraulic drive
УИ-0.75Т-500750500380 / 501gearbox or hydraulic drive
УИ-1Т-8001 000800380/660 V; 50 Hz - on execution1gearbox or hydraulic drive
УИ-1.5Т-12001 5001 200380/660 V; 50 Hz - on execution1gearbox or hydraulic drive
УИ-2Т-12002 0001 200voltage according to the project; 50 Hz0,5Hydraulic
УИ-3Т-24003 0002 4002 × 1000 / 500,5Hydraulic
УИ-5Т-30005 0003 000900 / 500,5Hydraulic
УИ-5Т-40005 0004 000950 / 500,5Hydraulic
УИ-6Т-36006 0003 600900 / 500,5Hydraulic
УИ-8Т-48008 0004 800950 / 500,5Hydraulic
УИ-10Т-600010 0006 000950 / 500,3Hydraulic
УИ-12Т-700012 0007 0001000 / 500,3Hydraulic
УИ-15Т-850015 0008 5001000 / 500,25Hydraulic

The table on furnaces for steel and cast iron is intended for primary selection. Inductor voltage, transformer, cooling, housing, lining and actual performance are confirmed by engineering calculation and specification. The table shows the typical operating frequency. As agreed, UralInduktor can manufacture a thyristor furnace with a different design value. For pre-250 kg furnaces, one possible and often preferred performance is the 2,5 kHz: for a compact melting unit, this frequency can provide more suitable electromagnetic matching and a calmer bath. The final choice is made according to the metal brand, size and density of the furnace charge, crucible geometry, power and required mixing intensity.

Specific consumption and productivity

Lower benchmarks are used for primary economic evaluation: from 550 kW·h/t for cast iron and from 620 kW·h/t for steel. These are achievable benchmarks for a prepared furnace charge and a sustainable cycle, rather than a guarantee for any melting.

The replacement performance of the steel and cast iron section is obtained from the full stroke, and not from dividing the power by the mass. The stroke includes loading, melting, metallurgical operations, overheating, draining and preparing the next melting.

Nominal load means the mass of one calculated melting in the design geometry of lining, and not release per hour. As the lining wears naturally, the working cavity increases, so the actual load can become higher than the nominal one; in some cases, the gain relative to the nominal reaches 30 %. This is not a permit to overload: the allowable load is determined by the actual condition and safe thickness of the lining, the bath level and the stock to the board.

How to choose neighboring models

If the two models for steel and cast iron have the same load, but different power, the more powerful is not always automatically more profitable. It requires more attached power and cooling system, but can reduce the electrical part of the cycle. The choice is made according to the full stroke, the schedule of bottling and the cost of infrastructure.

For steel and cast iron, a stock in the volume of the crucible is needed for a safe bath level and a specific furnace charge, but constant work with too little loading is also undesirable. The engineer checks the electrical alignment, the depth of the bath, the mixing and the possibility of the technological residue.

Technological features

For steel, cast iron and stainless steel grades can not be assigned one universal lining. Acid, main or neutral system is selected by chemical composition, temperature of overheating, slag regime and the planned change of grades. Switching to an incompatible alloy without preparing a crucible increases the risk of melt contamination and lining damage.

Electrodynamic mixing equalizes the temperature and composition of the bath, but does not replace metallurgical technology. The composition of the furnace charge, the doping procedure, aging, cinder formation, sampling and release temperature are set by the customer's technologist and fixed in the melting card.

Lining for Steel and Cast Iron

For gray and high-strength cast iron, acidic quartzite dry stuffing lining is common; a neutral aluminosilicate or mullite-forming system can be used as an alternative. For carbon and low-alloy steel, the initial solution is usually a neutral high-glycose spinel-forming mass. High-alloy grades and basic slag may require a magnesia or magnesia-spinel system. It is a map of primary choice, not a universal destination.

UralInduktor can pick up and supply the working mass and related materials after obtaining the exact grades of metal, chemistry and the amount of slag, fluxes, release temperature, exposure time, number of cold starts and history of premature wear. Separately, the amount of mixture, pattern, coil coating, separation layer, top and sock, repair and backup set are calculated.

Power supply

The characteristics of the thyristor furnace indicate the nominal power of the frequency converter. The total attached power of the site is calculated separately taking into account the cooling system, hydraulics, actuators and other auxiliary consumers.

For a separate 3-phase line L1, L2, L3 from the customer's distribution device or secondary wrapping of the transformer to frequency converter in the cards, the calculated reference point of the total copper section per phase at a distance of not more than 30 m is given. Methodology: P / (1,732 × U × 0,93), stock 10 per cent by current and calculated density not exceeding 3 A/mm². The number of parallel cables and the nominal section of each housing shall be determined by the designer of the customer. The public orientation does not replace the verification of the permissible current of the selected cable mark, temperature and manner of laying, grouping, harmonica, voltage drop, protection and short circuit current; the actual section may be increased. PE is calculated separately, N is calculated by passport if necessary.

Cooling, extraction and placement

For steel and cast iron furnaces, the flow rate, head, and thermal power of the cooling are calculated after the TFC, the number of units, the length of the pipe runs, and the coolant have been selected. Furnaces up to 1,5 t and УИГ cooling towers are often in stock or included in the production program, but cooling is always listed as a separate item. Standard thyristor systems are in continuous production; the manufacturing time is from 30 calendar days, and the exact readiness date is fixed in the contract.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

  • clean inner circuit power electronics and furnace inductor for steel and cast iron;
  • the main and reserve pump of the steel and cast iron section - according to the category of reliability;
  • control of pressure, flow and temperature with automatic blocking of power supply in case of violation of cooling parameters of the furnace for steel and cast iron;
  • emergency cooling and safe discharge of steel and cast iron melt;
  • local drawing for melting steel and cast iron, fluxes and loading method.

Equipment and options

In a proposal for steel and cast iron furnaces, the base supply, options, and on-site work are shown separately. The specification lists the converter, capacitor bank, melting units, current leads (power leads), controls, and templates. Cooling, transformer, lining materials, fume extraction, foundation, installation, and commissioning are not considered included unless expressly stated.

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

For the steel and cast iron melting line, PLCs and touchscreens are used for recipes, archiving and integration; they are not considered mandatory without specification. Lining control, weighing, pyrometry, vibration tamping and cooling reserve are also issued as separate options.

Production and launch

Before shipment, the own thyristor complex is checked under load at power from 30 %. The liquid-cooled components are separately tested for leakproofness at 6 atm, then the circuit assembly is checked at the same pressure. By agreement, the customer participates in person or by video link.

Thyristor units are in constant production; the lead time for the standard version is from 30 calendar days. Furnaces of up to 1,5 t are often in stock or included in the production program. The exact readiness depends on the power, housing, automation and scope of supply and is fixed in the contract.

In the direction of induction melting, 223 supply furnaces have been confirmed. For steel and cast iron projects, Gross Metal Engineering LLP independently assembles a frequency converter, capacitor batteries and water-cooled cables in Kazakhstan, performs installation, commissioning and subsequent service. Standard warranty for own equipment is 18 months.

Free engineering selection

Free comparable metal, mass of the garden, replaceable output, available power and layout with the parameters of equipment for steel and cast iron. Preliminary calculation of furnace, cooling and basic communications and commercial offer will be prepared from 1 working day; non-standard project is evaluated after technical specification analysis.

Cost and contractual terms

The cost depends on the power, number of units, drive, cooling, automation and the composition of the work and is indicated only in the current commercial offer. For running warehouse positions, prepayment from 10 % is possible, for large and individual projects - from 30 %. The order of payment and fixation of the price is agreed individually. Equipment and services of "Gross Metal Engineering" LLP are supplied with VAT at the current rate; leasing up to 5 years is available through partner companies.

Diagnostics and modernization

If the power, temperature or output is not reached, check the frequency converter, vibration contour coordination, inductor, cooling and steel or cast iron smelting technology. Based on the results, we issue a written conclusion with the reasons, priority of work and components. An audit can be ordered separately, without mandatory repair; a guarantee is provided for the work performed under the contract.

Baseline for KP

  • grades of steel and cast iron and composition of furnace charge;
  • mass of one smelting of steel and cast iron and the required output per shift;
  • steel and cast iron release temperature and exposure time;
  • Network voltage for the steel and cast iron section, dedicated power and transformer;
  • layout of the steel and cast iron section, loading method, filling ladles and heights;
  • cooling, heat transfer, drawing and automation of the steel and cast iron section.

After receiving data on steel and cast iron, the engineer offers a model or several comparative options, shows the composition of the supply and separately calculates the installation, commissioning and infrastructure.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.