Transistor melting furnace УИ-90П

Price on request
40 kg
Steel and cast iron
120 kg
Copper
40 kg
Aluminium
87,54 kW
Estimated power consumption
  • Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
  • Melting of steel and cast iron up to 40 kg, copper up to 120 kg, aluminum up to 40 kg per cycle
  • Transistor IGBT modules, 18-month warranty — official supply from the partner plant

Description

УИ-90П is a transistor melting furnace for small production batches. The charge depends on the selected version: steel and cast iron 40 kg; copper 120 kg; aluminum 40 kg. Operating frequency — 1–20 kHz, supply — 380 V; calculated power consumption — 87,54 kW.

  • charge — steel and cast iron 40 kg; copper 120 kg; aluminum 40 kg
  • power supply — 380 V; calculated power consumption — 87,54 kW
  • metal pouring — tilting via a gearbox, per the agreed configuration
  • purpose — for a production section with an output of up to 120 kg of copper or 40 kg of steel
  • УИ-90П is officially supplied by the partner factory; warranty of 18 months.

What is УИ-90П furnace suitable for

The model is designed for serial batches of up to 40 kg of steel or 120 kg of copper and suits a compact foundry section with regular output. The chiller, gear-driven pouring and the working platform are agreed as separate items of the system.

Technical specifications

ModelУИ-90П
Capacity by metalsteel and cast iron 40 kg; copper 120 kg; aluminum 40 kg
Crucible for copper: materialSilicon carbide (SiC)
Copper crucible dimensions, mm340(285) × 170 × 390
Crucible for steel: materialMagnesium oxide (MgO)
Steel crucible dimensions, mmPer the drawing of the agreed version
Inner diameter d for calculation, mmPer the drawing of the agreed version
Inner depth h for calculation, mmPer the drawing of the agreed version
Calculated volume to the brim, LPer the drawing of the agreed version
Theoretical capacity for liquid steel to the brim, kgPer the drawing of the agreed version
Estimated power consumption, kW87,54
Power supply voltage, V380
Operating frequency, kHz1–20
Current consumption, A140
Cooling water flow rate, L/min10–85
Cooling water pressure, MPa0,15–0,25
Maximum coolant temperature, °C40
Overall dimensions, mm720 × 420 × 805 / 550 × 400 × 510
Weight, kg80 / 48
Convertertransistor, water-cooled
Drainage mechanismReducer - complete
Standard configuration1 transistor converter + 1 melting unit
Warranty18 months

Crucibles for melting copper and steel

For copper, a silicon carbide crucible 340(285) × 170 × 390 mm is provided. For steel, a magnesite crucible based on magnesium oxide (MgO) is selected; its dimensions and usable volume are fixed in the drawing of the selected version. For bronze, cast iron and other alloys, crucible compatibility is clarified according to the composition and the melting mode.

The capacity of a magnesite crucible is checked against its inner profile. For a cylindrical cavity, the reference calculation has the form V = πd²h/4, m = ρV; taper and fillets require separate accounting. The numerical estimate is made after the inner dimensions of the selected crucible are confirmed.

Capacity to the brim is a theoretical estimate under the stated assumptions. The working melt level is set below the rim; the nominal furnace load is given separately.

Overall dimensions — 720 × 420 × 805 / 550 × 400 × 510 mm; weight — 80 / 48 kg. The paired dimensions and weights refer to the two equipment units in the order of the original specification. The layout plan and connection dimensions are specified from the dimensional drawing.

УИ-90П model differences

The calculated power consumption is 87,54 kW at a current of 140 A. For the agreed version, a cooling water flow of 10–85 L/min is specified. It does not replace the calculation of heat removal from the converter, the inductor and the other circuits; the list of consumers and the distribution of flow are specified according to the cooling diagram.

Below it in the range is the УИ-70П (25 kg of steel or 100 kg of copper; calculated consumption 65,65 kW), above it — the УИ-110П (50 kg of steel or 150 kg of copper; calculated consumption 112,55 kW). The comparison is made by the mass of a single tap, the full cycle time, the available power and the cost of the infrastructure.

Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.

Melting of aluminum and aluminum alloys

For the УИ-90П, the aluminum charge is 40 kg in the version with a matched crucible and inductor. The crucible is selected according to the alloy, temperature and fluxes; a steel crucible is not automatically carried over to aluminum.

For silumin, the working weight is specified by grade. With bulky returns or chips, batch loading may be required. The full cycle is calculated taking into account the charge, melting loss, holding and pouring.

Melting of cast iron and copper alloys

The cast iron charge is 40 kg, the same as for steel. Crucible compatibility and the melting mode are checked against the cast iron grade. For copper, the charge is 120 kg; for brass, bronze and other copper alloys, the permissible mass is determined according to the melt density, the usable crucible volume and the tapping temperature.

Power supply and cooling

Supply — 380 V; current consumption — 140 A. The converter generates an operating frequency of 1–20 kHz and requires continuous liquid cooling. The calculated power consumption of 87,54 kW serves as a guide for a preliminary assessment of the power network and is not the rated output power. The cable, protection, transformer and allocated power are checked against the data sheet of the version, including auxiliary consumers. Cooling water flow — 10–85 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The heat load of the whole unit and the distribution of flow among the circuits are calculated when designing the cooling system.

Switching on the heating of the УИ-90П is permitted only when the coolant flow, pressure and temperature are confirmed. Protective grounding, emergency shutdown and a switching device with a visible break are included in the connection design.

Metallurgical constraints

The result of melting depends on the dryness and purity of the furnace charge, the release temperature and the sequence of operations. The power of the converter itself does not set the ready technological mode.

For УИ-90П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.

Supply scope and boundaries

The standard configuration of the УИ-90П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor or matching unit, liquid-cooled current leads (conductors), controls and documentation are determined by the model and the metal. A second melting unit can be supplied only as an additional version under the technical specification; one converter is not intended to power two units simultaneously. Cooling, transformer, exhaust ventilation, foundation, installation and commissioning are listed as separate lines unless they are included in the specification.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

  • agree for УИ-90П crucible or lining, loading method, ladle and local hood;
  • agree on pouring with tilting via a gearbox and include the mechanism in the configuration;
  • define the set of PLC, archiving, energy metering and process control system data exchange functions for the УИ-90П;
  • confirm the metal and the actual mass of issue for УИ-90П;
  • calculate the full cycle of УИ-90П: loading, melting, delivery of the composition, release and preparation;

Manufacturing, commissioning and service

Before delivery, the УИ-90П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.

Popular versions of the УИ-90П are supported in the warehouse program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, quoted as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service and repair.

Information to include in your request

To perform the calculation for the УИ-90П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V mains, the existing cooling, the required crucible and the pouring method.

Questions on selection and configuration

Which loads apply to the selected version

Separate charges are specified for the УИ-90П: steel and cast iron — 40 kg, copper — 120 kg, aluminum — 40 kg. These are application options of the model with a selected crucible and melting unit. For brass, bronze, silumin, gold and silver, the permissible mass is determined according to the alloy and the version; the same figure for different metals does not mean the crucibles are interchangeable.

How to match a furnace to the production program

First, specify the mass of usable metal required by the time of pouring and the number of taps per shift. Then compare the full cycle, whether the charge fits in the crucible, the pouring method and the available infrastructure. The chiller and the power supply input are checked for the whole installation. A higher model index by itself does not confirm a lower cost or a shorter cycle.

Which parameters to specify when ordering

For the УИ-90П, the specification records the metal grade, the working charge and melt level, the crucible material and drawing, the pouring method, cooling and controls. The calculated consumption of 87,54 kW is used for a preliminary assessment of the power network; the final power supply requirements are taken from the data sheet of the version, taking auxiliary systems into account.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.