UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Transistor smelting furnaces

Transistor furnaces for aluminum and aluminum alloys

For small melts of aluminum and aluminum alloys, we select the УИ-1П…УИ-10П versions; the working mass is determined by the usable volume of the crucible and the alloy grade. For aluminum batches of 3–66 kg, the УИ-15П…УИ-160П are offered. For silumin and other aluminum-based alloys, the load is specified separately. The crucible, inductor, cooling, and pouring method are agreed together.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

14 models. Aluminum — 3–66 kg in the УИ-15П…УИ-160П series. For small batches — the small series. We specify the mass of silumin and other alloys according to the grade and the crucible.

Models and loads

The table shows the mass of one melt in the agreed version. This is not productivity in kilograms per hour. The power consumption is given as a calculated guideline for preliminary selection of the network; the output power of the converter is not determined from it.

ModelLoading, kgCalculated consumption, kWFood, in
УИ-15П320,01380
УИ-25П625,64380
УИ-35П1032,51380
УИ-45П1642,52380
УИ-70П3365,65380
УИ-90П4087,54380
УИ-110П50112,55380
УИ-160П66150,06380

Small series for small-batch aluminum melting

ModelAluminum, kg — calculationCalculated consumption, kWFood, in
УИ-1Пup to 0,157,11220
УИ-2Пup to 0,3015,96380
УИ-3Пup to 0,5521,48380
УИ-5Пup to 0,7526,39380
УИ-8Пup to 1,7531,91380
УИ-10Пup to 2,0042,96380

The calculation for the small series was made for a cylindrical cavity: V = π × d² × [H − (D − d) / 2] / 4. D is the outer diameter, d is the inner diameter, H is the overall height; the bottom thickness equals the wall thickness. If the dimensions are given in millimeters, the volume by this formula comes out in cubic millimeters. To convert to liters, it is divided by 1 000 000. For the calculation, a fill of 95% of the volume was assumed; the result is rounded down in steps of 0,05 kg. Densities of pure liquid metals at the melting temperature: copper 8,0 kg/L, aluminum 2,385 kg/L. The «up to…» values are calculated guidelines, not rated loads; the profile, working level, alloy, and crucible compatibility are confirmed in the specification. A crucible for gold or steel is not automatically considered suitable for an aluminum alloy.

Aluminum and Silmin

Loads of 3–66 kg are given for aluminum. For silumin and other aluminum alloys, the mass and tapping temperature are fixed in the specification. The composition of the alloy and fluxes affects the choice of crucible; a magnesite crucible for steel should not be considered a standard solution for aluminum.

Charge and usable volume

Lump returns and chips occupy different volumes before melting. With a low bulk density, the charge is loaded in portions within the agreed process. The dryness and cleanliness of the returns, the preparation of the chips, and the organization of loading affect the cycle and the amount of usable metal.

Choosing between neighboring models

For a tap of up to 6 kg of aluminum, the УИ-25П is considered; up to 16 kg — the УИ-45П; up to 33 kg — the УИ-70П. In the upper part of the range, the УИ-90П is rated for 40 kg of aluminum, the УИ-110П — for 50 kg, and the УИ-160П — for 66 kg. When selecting, the tap mass, the full cycle, and the available power are checked.

Melting loss and melt quality

The heating mode is selected without unjustified overheating and prolonged holding. Melting loss, slag removal, and melt preparation operations are accounted for separately. If refining, degassing, or filtration are needed, their equipment and place in the process are agreed when selecting the site.

Configuration and connection

In the standard configuration, one transistor converter and one agreed melting unit are supplied. The crucible material, pouring method and controls are fixed by the specification. The chiller, extraction, installation and commissioning are listed as separate items unless they are expressly included in the proposal.

The power supply input is checked against the passport of the selected version and the full load of the area. Cooling is selected based on heat removal, flow rate, pressure and coolant quality. The frequency range refers to the operation of the agreed circuit; the operator is not expected to be able to set an arbitrary frequency.

Selection and supply

For the calculation, please provide the metal grade, the tap weight, the type of charge, the tapping temperature, the number of melts per shift, the power supply and the pouring method. UralInduktor will select the furnace, crucible and cooling, and prepare a proposal with the scope of supply and commissioning. The cost and lead time are fixed for the agreed configuration.

Standard warranty — 18 months. The availability of a specific configuration and readiness for shipment are confirmed when ordering.

Questions on selection and configuration

How to compare the small and the main series

In the small series УИ-1П…УИ-10П, the aluminum values are labeled «up to…» and have the status of calculated capacity at a 95% fill. In the УИ-15П…УИ-160П series, aluminum loads of 3–66 kg are given for the agreed version. Compare not only the mass figure but also the crucible type, frequency, pouring conditions, and full cycle. For an aluminum alloy, the working mass is specified by its grade.

How to account for returns and chips

In the inquiry, the required mass of usable melt and the mass of the initial charge are specified separately. The volume of lump returns and chips before melting may exceed the bath volume, so the order and number of portions are agreed separately. Melting loss, slag removal, holding, degassing, and filtration are accounted for in the production cycle if these operations are needed by the process.

How to determine productivity per shift

The calculation requires the mass of usable metal per tap, the full melting cycle and the available working time. The cycle includes loading, heating, composition adjustment, holding, pouring and preparation of the next melting. Melting loss, slag removal and the process residue are taken into account separately. The load mass in kilograms does not mean the same productivity in kilograms per hour.

Can the existing cooling be used

Yes, after checking the temperature, flow rate and pressure of the coolant, its quality and the available cooling capacity. The simultaneous load of the converter and the melting unit, the length of the lines and the operation of interlocks are checked. The presence of a pump or chiller on site does not by itself confirm compatibility with the furnace.

What the supply proposal includes

The proposal lists separately the converter, melting unit, crucible, pouring method, cooling, controls, documentation and on-site work. The standard scheme contains one converter and one agreed melting unit. A second unit, a chiller, extraction, installation and commissioning are included in the supply only according to an agreed specification.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.