UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Green Sand Green Sand Mixture

Equipment for sand mixture preparation and molding in green sand — tailored to your production program

Eight units for a green sand molding section: bowl and vortex mixers, УИФ-14 and УИСМ-3Д806 molding machines, coolers, screens, lump crushing, magnetic separation. A closed sand circulation loop in the shop and stable casting quality from batch to batch.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select the green sand section configuration for your program and send you a calculation.

return mixture
by balance
we determine the share of return mixture from laboratory testing
section configuration
8
nodes on the full plot of green sand - from mixing to separation
molding cycle time
per machine
we calculate the cycle time from the flask, pattern and line configuration
delivery time
on technical specification
we fix the lead time after agreeing on the line composition and the site
Equipment range

8 units for a green sand line

Bowl and vortex mixers, УИФ-14 and УИСМ-3Д806 molding machines, a cooler, a polygonal screen, lump crushing and a magnetic separator — a set of equipment for batch molding in green sand. We record the supply boundaries and the version of each unit in the specification.

Technology

What is green sand casting

Casting in sand-clay mixtures (green sand) is one of the most widespread methods of producing castings from ferrous and non-ferrous alloys. The base of the green mixture is sand, bentonite and water; the formulation may include carbonaceous and special additives. After shakeout, the return mixture is cooled, screened, cleaned of metal and returned to the mixer with its composition adjusted.

Green sand is used in batch and mass production when the product range and program justify the pattern tooling and the return cycle. Suitability for a part is checked by geometry, alloy and surface requirements.

  • Mass and serial casting
    Cast iron (RH/HF), carbon and alloy steel, bronze, brass, aluminum. From medium to large programs - hundreds and thousands of tons per year.
  • Closed Turn of Sand
    Cooling, screening, lump breaking and magnetic separation prepare the mixture for return. The return rate and refreshing are set according to laboratory data.
  • Stable form quality
    Homogeneous humidity, strength and gas permeability of the mixture from cycle to cycle - castings are repeated along the geometry and surface.
  • Low cost of consumables
    The base of the mixture is sand, bentonite and water; the formulation may include carbonaceous and special additives. We calculate the economics for a specific part and program.
Technological solutions

We ensure consistent quality of the mold and casting

4 typical green sand pain points — and how we close them technologically.

by sensors
automatic water dosing

Cup or vortex mixer with moisture control

Dosage of water and bentonite under the PLC program. Uniform humidity and strength of the mixture from cycle to cycle - without "floating" formability from shift to shift.

Solves floating moldability and casting marriage due to non-permanent mixture
by cycle diagram
calculated molding cycle time

Molding machines УИФ-14 and УИСМ-3Д806

УИФ-14 compacts the mixture by micro-jolting, УИСМ-3Д806 uses a segmented upper plate. The calculated cycle time depends on the flask size, pattern, removal method and line configuration.

Solves “loose” zones in shape, the difference of castings and the hidden marriage
by analysis
share of return mixture

Return mixture preparation

An air cooler lowers the temperature, a magnetic separator removes metal, a belt unit breaks up lumps, and a screen separates inclusions. The sequence and composition of operations are set by the design scheme. The return and refreshing rates are determined from moisture, active clay, strength, gas permeability and grain size distribution.

Solves consumption of fresh sand and bentonite, removal of dumps
by measurement
dust extraction efficiency

Closed Dust Extraction with Cooler and Sieve

Dust extraction hoods on the cooler, screen and lump-breaking unit. We calculate efficiency from the emission points and air flow rate; the dust concentration is verified by instrumental measurements.

Solves dust in the shop, fines of Rosprirodnadzor and labor protection claims
Technology by example

What the tooling, mold and casting look like in green sand

The pattern forms the cavity in the green sand mixture, and the cores create the internal channels. After the mold is assembled, the metal is poured, then the mold is shaken out and the return mixture is sent back for preparation.

The photos show the principle of the technology and the type of result. The equipment in the images is not a depiction of a UralInduktor supply.

Pattern, core box, sand cores and metal casting

Pattern and core tooling

The pattern defines the external geometry, and the core box the internal cavities. The tooling is designed taking into account draft angles, shrinkage and allowances.

Two mold halves made of sand mixture with cores

Mold halves with cores

The mixture is compacted around the pattern in the upper and lower half-flasks. Before pouring, the cores are set and the mold is assembled.

Bronze mortar casting after sand casting

Casting after cleaning

After shakeout, the mixture and cores are removed, the gates are separated, the surface is cleaned and the geometry is checked before machining.

Sand mold half with a complex core before assembly of the foundry mold

Mold half with core before assembly

The core forms the internal channel and is secured in the mold by core prints. Before closing, its position, the integrity of the cavity and of the gating channels are checked.

Pouring molten cast iron into a mold made of green sand mixture

Pouring a green sand mold

The melt is fed into the pouring basin of the assembled mold. The condition of the mixture, compaction, venting and the temperature-time regime affect mold filling and casting quality.

Counting on my project

Get an equipment selection and a calculation for your task

The casting engineer will contact you during the working day, specify the alloy, size of the molding flap, production program - will offer a kit for your production.

  • Selection of line configuration and productivity according to the required hourly output and batch weight
  • Calculation of cost, timelines, supply scheme and leasing
  • Response within one working day

Counting on my project

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Equipment

8 units of the molding and mixing section

Everything you need for a full cycle of green sand - from the preparation of the molding mixture to the closed return of the work in the mixer.

Cup mixer (runners)

Round bowl with two vertical rollers. Classic wet mixing of molding and core mixture.

Vortex Mixer

High speed vertical rotor. More even mixing, higher gas permeability of the finished mixture.

УИФ-14 Forming Machine

Mixture compaction by micro-jolting. We agree the permissible half-flask size, removal method and level of automation according to the selected model and tooling.

Multi-contact УИСМ-3Д806

Set top plate with individual heels. Uniform density even on complex models with high walls.

Air Cooler

The fluidized layer cools the waste mixture, separates the dust. Return the mixture to the mixer at operating temperature.

Polygonal sieve

Rotating multi-faceted drum-sito. Separates large inclusions and lumps from the reversible mixture.

Comma crushing installation

A belt unit with wear-resistant crushing elements breaks up lumps before further processing of the mixture.

Magnetic Separator

The belt version with a magnetic unit removes metal inclusions from the return mixture.

Engineering, supply and service

Full cycle under single responsibility — from project to servicing

UralInduktor is an engineering company: design, supply, supervision and service under one responsibility. Delivery, installation supervision and service in Astana and Kazakhstan.

01

Designing

The engineering center calculates the nodes for your alloy, size of the molding flask, production program and site conditions. We do not sell a catalog - we collect a solution for the task.

02

We complete and supply

We select and supply equipment and line nodes for the project. Entrance control and acceptance by our engineers. ZIP for critical components - from a warehouse in Kazakhstan.

03

Installation and maintenance

Installation supervision, commissioning, operator training. The term and scope of the warranty are fixed in the contract and in the passport of the specific equipment. We provide service, repair and modernization.

Warranty under the contract
We state the terms for each item and each scope of work
Warehouse ZIP in Kazakhstan
We agree on the product range and the delivery time for the project
Documents for audit
Passports, manuals, certificates and acceptance reports — the contents of the set are fixed in the contract
The Economics of the Turnover Cycle

We calculate the mold cost for your production program

We compare green sand and no-bake sand only for the same part, alloy, program and quality criteria. The calculation includes mixture refreshing, energy, casting yield and investment.

What the green sand calculation includes

Laboratory data of the mixture + production program

ParameterInitial dataWhat we determine
Mixture refreshingSand, active clay, water and additivesMaterial consumption per ton
Return cycleTemperature, lumps, metal and dustScope of mixture preparation
FormingFlask, pattern, cycle time and number of shiftsSection productivity
InvestmentsEquipment, conveying, dust extraction and installationProduction cost and payback
Economic effect
Calculation

based on the mixture recipe, actual yield and the production program

We prepare the comparison with other technologies after checking the manufacturability of the specific product range.
Our Process

From initial data to start-up — on an agreed schedule

The design, manufacturing and commissioning times are determined after the line composition, the technical specification and the site readiness are fixed; the schedule is set in the contract. The leasing terms are confirmed by the selected leasing company.

After the technical specification

Initial data

We clarify the alloy, drawings, program, flasks, pattern tooling, mixture recipe and laboratory data.

After measurements

Project and proposal

We fix the scope of supply, productivity, layout, utility requirements and the acceptance program.

Per contract

Manufacturing and kitting

Node assembly in Kazakhstan. Payment in stages.

When ready

Installation, setup and acceptance

We provide installation supervision, set up mixing, molding and the return-sand loop, train operators and carry out the agreed test program.

Frequently Asked Questions

Answers to the key questions

If you do not find the answer - call, the engineer will deal with your situation personally.

How does green sand casting differ from no-bake and when is the process to choose?

Green sand — a raw mixture based on sand, bentonite and water, usually chosen for serial programs with a return cycle. No-bake sand hardens at room temperature and forms a rigid single-use mold, so it is often suitable for complex, large, one-off and small-batch castings. We check the choice against the part, alloy, program and surface requirements.

Do you make the whole green sand plot turnkey?

Yes. A complete set — a pan or vortex mixer, УИФ-14 or УИСМ-3Д806 molding machines, a return sand mixture cooler, a polygonal sieve, a lump crushing unit, a magnetic separator. Plus design, installation, commissioning, operator training. Melting furnaces, shakeout grids and conveyors we integrate with your existing equipment or select a partner.

Under what alloys and sizes can the molding flask?

We check applicability to cast iron, steel or non-ferrous alloys against the part and the mixture composition. For the УИСМ-3Д806 the published maximum flask size is 800×630×300 mm; the УИФ-14 parameters and line productivity are agreed according to the chosen version, tooling and cycle diagram.

Which mixer to choose - a cup or a vortex?

We choose the mixer type according to productivity, batch weight, recipe, required mixing time and automation scheme. The published range of pan mixers — 1,5–6 t/h, of vortex mixers — 12–25 t/h.

We already have an old molding line. Can you replace one node?

Yes, this is a common task. An engineer will visit the site, take measurements and technical data, after which we will select and integrate a compatible unit: a mixer, cooler, sieve, magnetic separator or molding machine. We agree the installation plan with the production schedule. We also include the supply of spare parts kits and modernization in the project.

How much is the plot?

The cost depends on productivity, line composition, automation, site condition and the scope of supply. We prepare the calculation after receiving the technical specification.

Can it be leased?

We help prepare technical and commercial materials for a leasing application. The availability of the program, the advance payment, the term and the rate are determined by the selected leasing company after review.

What documents do you give for the equipment?

Passports for each unit, certificates, operating manuals, commissioning programs, process charts, acceptance reports. We agree on the requirements of a specific acceptance or audit before the contract is signed.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Compare offers

We'll prepare a technical proposal

Send us your input data or a commercial proposal for a green sand line — we will compare the scope of supply, specifications and service, then calculate the cost for your task.