УИ-1Т-800 Induction Furnace for Steel and Iron on 1 t
- Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
- Melting of steel and cast iron — weight up to 1000 kg per cycle
- 18 months warranty and efficiency up to 95 % own production
Description
УИ-1Т-800 is a thyristor crucible furnace for open smelting of steel and cast iron. Nominal output is 1 000 kg in steel/cast, frequency converter power is 800 kW, and typical operating frequency is 1 kHz. The model is considered for medium foundries with regular release.
mass of one melting — 1 000 kg in steel / iron
power part - 800 kW; 380 or 660 V; 50 Hz - according to the agreed scheme
metal drain - gear or hydraulic
design scenario - an industrial site with a single issue of 1 t, where you need to coordinate the rate of melting with the transformer and pouring
Frequency converter, capacitor battery and water-cooled cables for УИ-1Т-800 independently assemble in Kazakhstan; warranty — 18 months.
What is УИ-1Т-800 furnace suitable for
The ton kiln is designed for regular industrial production of steel and cast iron, when the mass of the smelting is agreed with the ladle and molding site. It requires a separate inspection of the power supply, the circulation of the coolant, the cooling reserve and service areas.
Technical specifications
| Model | УИ-1Т-800 |
|---|---|
| Nominal weight of one smelter for steel/iron, kg | 1 000 |
| Rated power frequency converter, kW | 800 |
| Lower specific flow reference | from 550 kW·h/t for cast iron; from 620 kW·h/t for steel |
| Voltage and frequency of the supply network | 380 or 660 V; 50 Hz is for execution |
| Calculated current and accepted stock to estimate the supply line | 380 V: current ≈ 1 307 A, 10 % ≈ 1 438 A; 660 V: current ≈ 753 A, 10 % ≈ 828 A |
| Estimated total copper cross-section reference point per phase up to 30 m | УИ-1Т-800; frequency converter 800 kW; network 380 or 660 V; 50 Hz - execution: 380 V and 660 V: no numerical cross-section reference is published; cables or busbars are calculated for the selected execution |
| Water-cooled current supply internal HF-circuit | It is not a network powering cable 380/660 V. These are separate flexible water-cooling currents between frequency converter, capacitor batteries and melting knot. Reference references: to perform 380 V / contour 1500 V - frequency converter battery 2 cable on 240 mm², 2 cable battery on 450 mm²; 660 V / contour 2400 V - 2 on 150 mm² and 2 on 300 mm² respectively. Final - by calculation and specification |
| Inductor voltage, B | 750 or 1500 depending on performance |
| Operating frequency, kHz | standard 1; other - by calculation and agreement |
| Smelting materials | steel, cast iron |
| The body of the melting unit | Silmin or steel weld - according to the project |
| Tilting mechanism | gearbox or hydraulic drive |
| Configuration of the complex | Base: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option |
| Revolving Cooling System | calculated and indicated by a separate position |
| Warranty | 18 months |
The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.
For УИ-1Т-800, value from 550 kW·h/t for cast iron; from 620 kW·h/t for steel is the lower engineering benchmark for prepared furnace charge and sustainable cycle, not warranty. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.
Engineering sense of the model УИ-1Т-800
УИ-1Т-800 combines the 1 t garden and the 800 kW frequency converter. The basic supply includes one smelting unit; the second can be ordered separately as a reserve for the period of repair lining. Simultaneous melting in two nodes from one frequency converter is not provided: the production program is counted by one connected node.
Below in the line is УИ-0.75Т-500 (750 kg, 500 kW), above is УИ-1.5Т-1200 (1 500 kg, 1200 kW). The comparison is made by the mass of a single issue, full stroke, available power and the cost of infrastructure.
The nominal value of 1 000 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.
As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.
Power supply and cooling
Frequency converter 800 kW is powered by network 380 or 660 V, 50 Hz; execution and connection scheme are consistent with the project. The typical operating frequency is 1 kHz, the circuit voltage of the inductor is 750 or 1500 Depending on the performance. Power input, transformer, switching, and network quality are checked before a connection task is released. The rated power relative to the rated garden is 800 kW/t; this is a comparative rather than a guaranteed performance measure. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.
The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.
For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet УИ-1Т-800 at the length of the track not exceeding 30 m: 380 V: Calculating current ≈ 1 307 Ah, with a supply. 10 % ≈ 1 438 A; 660 V: Calculating current ≈ 753 Ah, with a supply. 10 % ≈ 828 A; 380 V and 660 V: The numerical section orientation shall not be published; cables or tyre lines shall be calculated for the selected performance Calculation methodology: P /1,732 × U × 0,93), then stock 10 % by current; for the referenced total copper the calculated density is not more than 3 A/mm². Ratio 0,93 - Prefeasibility; actual IAQ and coefficient power frequency converter It is necessary to confirm its documentation. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. Two options are shown in the card; one agreed entry is actually applied. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.
For the УИ-1Т-800 power project, short circuit currents, a power supply category, a transform transformer circuit, and an acceptable level of harmonics are needed. The total attached load of the site further includes cooling, hydraulics, drawing and mechanization.
Metallurgical constraints
The transition between cast iron, carbon and high alloy steel is checked by lining compatibility and pollution risk. The universality of the power source does not mean the universality of the working crucible.
Work with a reduced garden on the УИ-1Т-800 is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.
Lining and consumables
For УИ-1Т-800 liner can not be selected only by the model designation or the weight of the seat. For cast iron, an acidic quartzite dry mass or neutral aluminosilicate alternative is often considered; for carbon and low-alloy steel, a neutral high-glue spinel-forming one. High-alloy grades and basic slag may require a magnesia system.
UralInduktor can pick up and put the kit under the agreed steel/cast iron mode: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.
Supply scope and boundaries
The final composition of the УИ-1Т-800 is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
confirm the metal and the actual mass of issue for УИ-1Т-800;
calculate the full cycle of УИ-1Т-800: loading, melting, delivery of the composition, release and preparation;
check the network 380 or 660 V; 50 Hz - according to the agreed scheme and power reserve, taking into account auxiliary systems;
assign for УИ-1Т-800 a reverse cooling scheme, flow control and emergency stock;
agree for УИ-1Т-800 crucible or lining, loading method, ladle and local hood;
Manufacturing, commissioning and service
The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.
Thyristor installations are in production at all times; the serial execution of УИ-1Т-800 starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.
Information to include in your request
To specify УИ-1Т-800, provide the steel and cast iron grades, melt mass of 1 000 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.