Manufacturer in key product areas
We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.
UralInduktor designs circulating cooling systems based on two-circuit UIG cooling units, UIC chillers and combined circuits. The solution is selected not only by the power of the equipment: first determine the actual heat load, the required temperature of the coolant, flow rate, hydraulic resistance and climatic conditions of the site.
An engineer will select a model for your metal and send a cost estimate.
UIG UralInduktor cooling towers are manufactured in Astana, Kazakhstan own production, ZIP and service from the warehouse. Chillers are selected and supplied under your cooling circuit. For all systems - supervision, service support and delivery in Kazakhstan and the CIS.
We produce UIG cooling tower for circulating water supply of induction furnaces and hydraulics (50 000–900 000 kcal/h) and Chillers Uich for precise cooling of lasers, casting machines and molds (1 316–85 303 kcal/h). Water in the technological circuit No contact with the atmosphere. — the circuit gets less contaminated and fouled; the coolant quality requirements still apply.
We design a cooling system for your heat load, we manufacture, deliver to Kazakhstan and the CIS, we install our team and carry out commissioning. Guarantee for own production equipment 18 monthsNominal service life in compliance with operational documentation - 10 years. Actual availability, completeness and term are confirmed in the offer on the date of the request.

For preliminary calculation, send the passport of the cooled equipment, the required feed and return coolant temperatures, the consumption of the coolant and the city of installation. If parts of the data are not available, engineers will indicate what needs to be clarified for thermal and hydraulic calculation.
| Task | Preliminary decision | What needs to be checked |
|---|---|---|
| Heat removal with the preservation of a closed technological circuit, when the required temperature is achievable due to outdoor air and irrigation | UIG two-circuit cooling tower | Summer calculated air parameters, temperature by wet thermometer, heat load, flow rate and pressure loss |
| Low or especially stable temperature, narrow allowable range or minimum mode dependence on outdoor air | Chiller Uich | Required cooling capacity at the working point, temperature chart, hydraulics and electrical power |
| The cooling tower can remove the main available load, but in some modes a cooling stage is needed | Combined UIG + UIC scheme | Load shares, work boundaries of each stage, redundancy and algorithm of joint management |
| It is necessary to remove heat from the water-cooled chiller capacitor | UIG in condenser circuit | Full heat load of the condenser, temperature, flow rate, pressure and working schedule of refrigeration machines |
The table is designed to select the direction of calculation. The final composition of the system is fixed after checking the estimated summer mode, hydraulics and winter operation conditions.
A detailed comparison of the solutions is made on a separate page: “Gradirnya or chiller: what to choose for industrial cooling”.
The coolant of the cooled equipment circulates along the closed technological circuit and passes inside the sealed heat exchanger. It does not mix with the water of the external irrigation circuit. Heat is transferred through the wall of the heat exchanger and is discharged by air flow, and in the prescribed mode - with irrigation of the outer surface.
When working with irrigation, the result depends primarily on the temperature of the outside air using a wet thermometer. The possibility and limits of the regime without irrigation are confirmed for a specific execution. Therefore, the cooling capacity and achievable temperature cannot be determined only by the model name: they are checked for the design parameters of a particular site.
UIG is chosen when it is important to separate the working coolant from external water and air. This is especially important for the inductor, converter, capacitor battery, flexible current supply and other equipment with quality requirements of the working coolant.
See serial performances: closed double-circuit cooling towers of UIG.
Refrigeration stage is considered if the specified temperature is below the possibility of external cooling in the design heat, must be maintained in a narrow range or minimally depend on the outside air. Under these conditions, the chiller can be the main source of cooling or part of the overall system.
If a water-cooled chiller is used, a separate heat dissipation is required for its condenser. The cooling tower in such a circuit is selected not only by cooling capacity: use the full heat load of the capacitor at the selected working point. If it is not given in the passport, the cooling capacity and power of the compressors are taken into account, and the final value is confirmed according to the manufacturer of the refrigeration machine.
For several chillers, the simultaneity of operation, the required reserve, the temperature of the coolant and the calculated flow rate through each capacitor are additionally checked.
UIG and SCI are not always mutually exclusive solutions. In the combined system, the cooling tower can take the main available heat load, and the refrigeration stage can provide modes that cannot be achieved only due to external cooling. Another option is the work of the UIG on the side of the water-cooled chiller capacitor.
For such a system, separately calculated:
The scheme and control algorithm are coordinated before manufacture and fixed in the technical proposal and specification.
The thermal balance of the induction unit includes heat that is transferred by the coolant from the inductor, the converter, the capacitor battery, the flexible currents — in production they are also called currents — and other water-cooled units.
The installed electrical power of the furnace is not equal to the thermal load on the cooling system. The mass of the plant and the power of the installation allow you to pre-determine the size, but the final selection is performed on the total heat and the actual parameters of all branches.
For each branch, check:
Even with the general contour of the branch of the inductor, converter and other equipment must be hydraulically coordinated.
The heat load, flow rate and temperature difference are considered together: with the same amount of heat output, a smaller difference requires a greater flow rate. For several consumers, the total heat balance is made up, taking into account the duration of cycles and the simultaneity of work.
The pump is selected by the working point "consumption - pressure". The calculation includes the resistance of the cooled equipment, heat exchanger, pipelines, valves and local resistances in the most unfavorable ring. The height difference in the filled closed circuit is taken into account when assigning static pressure and filling conditions.
The sum of the passport capacity of pumps, fans and other consumers is the installed electrical power of the system, not the actual power consumption. The actual power is confirmed by measuring in the specified mode; the electricity consumption is taken into account in kWh for the selected period.
To calculate and prepare a technical proposal, you need:
If the project is at an early stage, the passport of the main equipment, the required temperature schedule, the city of installation and the description of the operating mode are sufficient for the first consideration. The missing parameters will be listed by the engineers before the final calculation.
According to the initial data, we will compare the applicable schemes for free, perform a preliminary calculation of cooling power, flow rate, pressure and communications and prepare a commercial offer - from 1 working day. For a complex complex, the period is specified after the analysis of the technical assignment.
UIG cooling towers are manufactured in Kazakhstan at the UralInduktor production site. The company performs winding of the pipe heat exchange radiator, manufacture and welding of manifolds, fittings, transition elements and expansion tanks, bending, welding and painting of body parts, as well as assembly of the control cabinet. The heat exchanger and parts of its own manufacture, directly in contact with the coolant, are made of corrosion-resistant steel AISI 304. Compatibility of seals, flow part of the purchased units and other materials with the composition and temperature of the working fluid is checked when selecting.
The pump group is completed according to the results of hydraulic calculation. The model is chosen according to the working point - the required supply and pressure - taking into account the resistance of the most unfavorable branch, the properties of the coolant and the operating conditions. Depending on the agreed performance, pumps from the nomenclature of JSC "Katai Pump Plant" or JSC "GMS Livhydromash" are used; the specific manufacturer, model, materials of the flow part, the power of the electric motor and the redundancy scheme are fixed in the delivery specification. Fans, protection devices, controllers, contactors and sensors are also selected according to the calculation and the agreed algorithm of work.
Factory tightness control is carried out in two stages. Prior to general assembly, the UIG manifolds are pressed at 10 atm. After final assembly, the hydraulic installation system is re-pressed at 6 atm before shipment. This is the pressure of factory tests for tightness, and not the declared working pressure of the contour; the permissible pressure is determined by the passport of a specific execution and project documentation. By prior agreement, the customer’s representative may be present at the control check in person or observe it by video link.
After confirming the installation readiness, UralInduktor’s own commissioning and commissioning of equipment at facilities in Kazakhstan and CIS countries. Specialists check hydraulic and electrical connections with the agreed scheme, check the filling of circuits, direction of rotation of pumps and fans, tightness of connections, irrigation, protection and alarm work, then conduct a test start and bring the system to the agreed mode. The exact volume of commissioning, limits of responsibility and acceptance parameters are fixed in the contract and the work program.
One contractor can perform the survey, calculation, free layout of equipment on the workshop plan after the conclusion of the contract, provide recommended sketches of foundations and data for communications, then carry out construction and installation work, commissioning and commissioning. This reduces the risk of inconsistency of individual nodes and establishes responsibility for the general regime in one contract.
We diagnose and modernize cooling systems of domestic and foreign manufacturers. According to the results of the survey, the customer receives a written technical opinion with the causes of deviations, a list of works and components and the priority of activities. Diagnosis can be ordered separately, without mandatory repair in LLP «Gross Metal Engineering».
Initial remote evaluation is possible according to the scheme, photos, videos and operating parameters; conditions are determined individually. A contractual guarantee is provided for the installation, repair and modernization works performed.
The implemented solutions are published in impersonal form: city and region, date, model of furnace and cooling system, initial task, composition of works and achieved mode. Business names, exact addresses and cost are not disclosed. Photos of major projects are posted after the removal of logos, faces, numbers and documents.
The cost of the system is calculated individually and is not published as a quickly outdated price. The duration of the offer, the payment schedule and the fixing of the cost are determined by the contract. Supplies and services are issued with VAT; leasing up to 5 years is available through partner companies.
To get not an approximate “power by model name”, but a solution applicable to the object, attach the equipment passport and fill in the known parameters from the list above. The proposal fixes the selected UIG circuit, UIC or a combination thereof, design mode, supply composition, installed electrical power and connection requirements.
Get a calculation and a commercial offer →
Hint to form: equipment and quantity; heat load; temperature; flow; coolant; mode of operation; city of installation; telephone and e-mail for clarification.
An engineer will contact you, clarify the task and suggest a solution for your production process.
A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.
We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.
Selection, design, delivery, installation, commissioning, training and service within one company.
We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.
Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.
Some equipment is available from stock, reducing lead times for urgent requirements.
18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.
Send us another company's proposal — we will compare the equipment list, configuration and cost.