Turnover water supply

Industrial cooling systems: УИГ cooling towers and УИЧ chillers

UralInduktor designs circulating cooling systems based on two-circuit UIG cooling units, UIC chillers and combined circuits. The solution is selected not only by the power of the equipment: first determine the actual heat load, the required temperature of the coolant, flow rate, hydraulic resistance and climatic conditions of the site.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

Catalogue

Model range

01 Production and service

Cooling towers — our own
manufacture

UIG UralInduktor cooling towers are manufactured in Astana, Kazakhstan own production, ZIP and service from the warehouse. Chillers are selected and supplied under your cooling circuit. For all systems - supervision, service support and delivery in Kazakhstan and the CIS.

02 Closed loop

Cooling tower + chiller —
for any task

We produce UIG cooling tower for circulating water supply of induction furnaces and hydraulics (50 000–900 000 kcal/h) and Chillers Uich for precise cooling of lasers, casting machines and molds (1 316–85 303 kcal/h). Water in the technological circuit No contact with the atmosphere. — the circuit gets less contaminated and fouled; the coolant quality requirements still apply.

03 Term and guarantee

Warranty of 18 months,
rated service life of 10 years

We design a cooling system for your heat load, we manufacture, deliver to Kazakhstan and the CIS, we install our team and carry out commissioning. Guarantee for own production equipment 18 monthsNominal service life in compliance with operational documentation - 10 years. Actual availability, completeness and term are confirmed in the offer on the date of the request.

model range
35 models
Coolers and chillers
UIG Series
10 cooling towers
50 000–900 000 kcal/h
UIC Series
25 Chillers
1 316–85 303 kcal/h
Refrigeration capacity
900 000 kcal/h
top bar УИГ-200Т

For preliminary calculation, send the passport of the cooled equipment, the required feed and return coolant temperatures, the consumption of the coolant and the city of installation. If parts of the data are not available, engineers will indicate what needs to be clarified for thermal and hydraulic calculation.

Get a calculation and a commercial offer →

UIG, UIC or combined system: what to choose

TaskPreliminary decisionWhat needs to be checked
Heat removal with the preservation of a closed technological circuit, when the required temperature is achievable due to outdoor air and irrigationUIG two-circuit cooling towerSummer calculated air parameters, temperature by wet thermometer, heat load, flow rate and pressure loss
Low or especially stable temperature, narrow allowable range or minimum mode dependence on outdoor airChiller UichRequired cooling capacity at the working point, temperature chart, hydraulics and electrical power
The cooling tower can remove the main available load, but in some modes a cooling stage is neededCombined UIG + UIC schemeLoad shares, work boundaries of each stage, redundancy and algorithm of joint management
It is necessary to remove heat from the water-cooled chiller capacitorUIG in condenser circuitFull heat load of the condenser, temperature, flow rate, pressure and working schedule of refrigeration machines

The table is designed to select the direction of calculation. The final composition of the system is fixed after checking the estimated summer mode, hydraulics and winter operation conditions.

A detailed comparison of the solutions is made on a separate page: “Gradirnya or chiller: what to choose for industrial cooling”.

How does the UIG double-circuit cooling tower work

The coolant of the cooled equipment circulates along the closed technological circuit and passes inside the sealed heat exchanger. It does not mix with the water of the external irrigation circuit. Heat is transferred through the wall of the heat exchanger and is discharged by air flow, and in the prescribed mode - with irrigation of the outer surface.

When working with irrigation, the result depends primarily on the temperature of the outside air using a wet thermometer. The possibility and limits of the regime without irrigation are confirmed for a specific execution. Therefore, the cooling capacity and achievable temperature cannot be determined only by the model name: they are checked for the design parameters of a particular site.

UIG is chosen when it is important to separate the working coolant from external water and air. This is especially important for the inductor, converter, capacitor battery, flexible current supply and other equipment with quality requirements of the working coolant.

See serial performances: closed double-circuit cooling towers of UIG.

When a UIC chiller is required

Refrigeration stage is considered if the specified temperature is below the possibility of external cooling in the design heat, must be maintained in a narrow range or minimally depend on the outside air. Under these conditions, the chiller can be the main source of cooling or part of the overall system.

If a water-cooled chiller is used, a separate heat dissipation is required for its condenser. The cooling tower in such a circuit is selected not only by cooling capacity: use the full heat load of the capacitor at the selected working point. If it is not given in the passport, the cooling capacity and power of the compressors are taken into account, and the final value is confirmed according to the manufacturer of the refrigeration machine.

For several chillers, the simultaneity of operation, the required reserve, the temperature of the coolant and the calculated flow rate through each capacitor are additionally checked.

Combined UIG and UIC

UIG and SCI are not always mutually exclusive solutions. In the combined system, the cooling tower can take the main available heat load, and the refrigeration stage can provide modes that cannot be achieved only due to external cooling. Another option is the work of the UIG on the side of the water-cooled chiller capacitor.

For such a system, separately calculated:

  • the boundaries of the modes of external and refrigerating cooling, including the admissibility of the operation of the UIG without irrigation;
  • load of each stage in the calculation points;
  • temperature and flow in the associated circuits;
  • reservation and allowable modes when stopping equipment;
  • sequence of inclusion of pumps, fans, irrigation and refrigeration stage;
  • exchange of signals with automation of technological equipment and ICS TP.

The scheme and control algorithm are coordinated before manufacture and fixed in the technical proposal and specification.

Induction furnace cooling system

The thermal balance of the induction unit includes heat that is transferred by the coolant from the inductor, the converter, the capacitor battery, the flexible currents — in production they are also called currents — and other water-cooled units.

The installed electrical power of the furnace is not equal to the thermal load on the cooling system. The mass of the plant and the power of the installation allow you to pre-determine the size, but the final selection is performed on the total heat and the actual parameters of all branches.

For each branch, check:

  • allowable temperatures of supply and return coolant;
  • design flow rate and the required pressure at the entrance to the equipment;
  • hydraulic resistance of the consumer and pipelines;
  • the manufacturer's requirements for the composition, quality and electrical conductivity of the coolant;
  • control of the flow, overheating and other necessary protection;
  • Simultaneous operation of furnaces and auxiliary consumers.

Even with the general contour of the branch of the inductor, converter and other equipment must be hydraulically coordinated.

What is checked in thermal and hydraulic calculation

The heat load, flow rate and temperature difference are considered together: with the same amount of heat output, a smaller difference requires a greater flow rate. For several consumers, the total heat balance is made up, taking into account the duration of cycles and the simultaneity of work.

The pump is selected by the working point "consumption - pressure". The calculation includes the resistance of the cooled equipment, heat exchanger, pipelines, valves and local resistances in the most unfavorable ring. The height difference in the filled closed circuit is taken into account when assigning static pressure and filling conditions.

The sum of the passport capacity of pumps, fans and other consumers is the installed electrical power of the system, not the actual power consumption. The actual power is confirmed by measuring in the specified mode; the electricity consumption is taken into account in kWh for the selected period.

Base data for calculation of the cooling system

To calculate and prepare a technical proposal, you need:

  • The name, model and passport of each chilled consumer.
  • The maximum and long-term heat load or data for which you can make a thermal balance.
  • The required feed and return coolant temperatures, the permissible range of their change.
  • Flow rate for each branch, required inlet pressure and allowable pressure losses.
  • Type, composition and concentration of the coolant, quality requirements and freezing temperature.
  • Scheme of pipelines with lengths, diameters, fittings and local resistances.
  • Load schedule, cycle duration, number of shifts and simultaneous operation of consumers.
  • City and place of installation, summer and winter design conditions, accommodation indoors or outdoors.
  • Restrictions on the heat carrier, electrical power, noise and occupied area.
  • Requirements for redundancy, automation, protection and communication with ICS TP.

If the project is at an early stage, the passport of the main equipment, the required temperature schedule, the city of installation and the description of the operating mode are sufficient for the first consideration. The missing parameters will be listed by the engineers before the final calculation.

Free preliminary selection

According to the initial data, we will compare the applicable schemes for free, perform a preliminary calculation of cooling power, flow rate, pressure and communications and prepare a commercial offer - from 1 working day. For a complex complex, the period is specified after the analysis of the technical assignment.

Production, assembly and commissioning

UIG cooling towers are manufactured in Kazakhstan at the UralInduktor production site. The company performs winding of the pipe heat exchange radiator, manufacture and welding of manifolds, fittings, transition elements and expansion tanks, bending, welding and painting of body parts, as well as assembly of the control cabinet. The heat exchanger and parts of its own manufacture, directly in contact with the coolant, are made of corrosion-resistant steel AISI 304. Compatibility of seals, flow part of the purchased units and other materials with the composition and temperature of the working fluid is checked when selecting.

The pump group is completed according to the results of hydraulic calculation. The model is chosen according to the working point - the required supply and pressure - taking into account the resistance of the most unfavorable branch, the properties of the coolant and the operating conditions. Depending on the agreed performance, pumps from the nomenclature of JSC "Katai Pump Plant" or JSC "GMS Livhydromash" are used; the specific manufacturer, model, materials of the flow part, the power of the electric motor and the redundancy scheme are fixed in the delivery specification. Fans, protection devices, controllers, contactors and sensors are also selected according to the calculation and the agreed algorithm of work.

Factory tightness control is carried out in two stages. Prior to general assembly, the UIG manifolds are pressed at 10 atm. After final assembly, the hydraulic installation system is re-pressed at 6 atm before shipment. This is the pressure of factory tests for tightness, and not the declared working pressure of the contour; the permissible pressure is determined by the passport of a specific execution and project documentation. By prior agreement, the customer’s representative may be present at the control check in person or observe it by video link.

After confirming the installation readiness, UralInduktor’s own commissioning and commissioning of equipment at facilities in Kazakhstan and CIS countries. Specialists check hydraulic and electrical connections with the agreed scheme, check the filling of circuits, direction of rotation of pumps and fans, tightness of connections, irrigation, protection and alarm work, then conduct a test start and bring the system to the agreed mode. The exact volume of commissioning, limits of responsibility and acceptance parameters are fixed in the contract and the work program.

Responsibility for the entire cooling project

One contractor can perform the survey, calculation, free layout of equipment on the workshop plan after the conclusion of the contract, provide recommended sketches of foundations and data for communications, then carry out construction and installation work, commissioning and commissioning. This reduces the risk of inconsistency of individual nodes and establishes responsibility for the general regime in one contract.

Audit and modernization of cooling systems

We diagnose and modernize cooling systems of domestic and foreign manufacturers. According to the results of the survey, the customer receives a written technical opinion with the causes of deviations, a list of works and components and the priority of activities. Diagnosis can be ordered separately, without mandatory repair in LLP «Gross Metal Engineering».

Initial remote evaluation is possible according to the scheme, photos, videos and operating parameters; conditions are determined individually. A contractual guarantee is provided for the installation, repair and modernization works performed.

How to confirm the experience without disclosing the customer

The implemented solutions are published in impersonal form: city and region, date, model of furnace and cooling system, initial task, composition of works and achieved mode. Business names, exact addresses and cost are not disclosed. Photos of major projects are posted after the removal of logos, faces, numbers and documents.

Commercial conditions

The cost of the system is calculated individually and is not published as a quickly outdated price. The duration of the offer, the payment schedule and the fixing of the cost are determined by the contract. Supplies and services are issued with VAT; leasing up to 5 years is available through partner companies.

Get engineering calculation and offer

To get not an approximate “power by model name”, but a solution applicable to the object, attach the equipment passport and fill in the known parameters from the list above. The proposal fixes the selected UIG circuit, UIC or a combination thereof, design mode, supply composition, installed electrical power and connection requirements.

Get a calculation and a commercial offer →

Hint to form: equipment and quantity; heat load; temperature; flow; coolant; mode of operation; city of installation; telephone and e-mail for clarification.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.