UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Service Repair and diagnostics of smelting furnaces

Repair and diagnostics of melting furnaces

A melting induction furnace is the heart of foundry production. We restore the performance of the melting unit, frequency converter, capacitor battery and cooling system based on an understanding of the real technical picture.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

diagnostics
4 unit
diagnostics of melting point, frequency converter, capacitors, cooling towers
approach
Reason
find the root, not repair by symptom
documents
Report
technical report + defective statement
support
Binding
with ZIP delivery, service and modernization
Heart of Foundry

The induction melting furnace — the heart of foundry production

From the correct operation of the smelting furnace directly depends on the quality of the metal smelted and the service life of the entire complex. To help our customers, we provide a service Diagnostics and technical inspection of induction furnaces with two melting points — with address verification of each critical node of the system.

What Happens With Deviations

Even small deviations during installation or configuration can lead to serious consequences: Smoothing Node, oil leakage in the hydraulic system, increased wear of gearboxes, Violation of the cooling system or failure of the power part of the installation. All this affects the stability of swimming and the safety of personnel.

What we check

4 units of the melting furnace — detailed inspection of each

The diagnosis is based on specific checklists for each critical node. This gives a complete technical picture of the state of the system - not a "general inspection", but an address check.

01

Melting units

  • Checking the absence of distortion during installation
  • Hydrosystem tightness control (no oil leaks)
  • Checking the correct connection of the tilt control panel
  • Smoothing unit tilt test (no interference)
  • Hydraulic testing and wear inspection of the gearbox
02

Frequency converter (thyristor frequency converter)

  • Connecting to the power supply and checking its serviceability
  • Control of the earthing of the installation body
  • Performance of the cooling system (hydraulic tests)
  • Test of protection response (temperature, water pressure, e.g. parameters)
  • Checking the power part and connections: automatic machines, cables, transformers
03

Capacitor battery

  • Control of tightening of bolt connections of the power circuit
  • Verification of the integrity of electrical connections
  • Hydraulic testing of the cooling system
  • Visual inspection of the elements
  • Checking the insulation and heating level during operation
04

Cooling tower (cooling system)

  • Checking the correct connection of the control panel
  • Control of the direction of rotation of pumps
  • Control of the direction of rotation of fans
  • Filling the inner contour with distilled water
  • Hydraulic testing of the cooling system
Result of Techaudit

What a technical audit of a melting furnace delivers

After the audit, you get not a “general impression”, but a specific technical report with recommendations and a defective statement for ordering spare parts.

Find it.
Hidden Problems

Identify hidden problems

Deterioration of components of the melting unit, frequency converter, capacitors and cooling towers. Installation and configuration errors. Non-compliance with technological standards until they went into an accident.

+CPD
optimization of the site

Optimizing productivity

Increase the speed of metal processing, reduce energy consumption, minimize downtime - due to the correct operation of the power part, cooling and smelting units.

−Failures
Risks of breakdown

Prevent accidents

Assess the risks of breakdowns of critical nodes and predict the timing of replacement — hydraulic systems, gearboxes, thyristor modules, capacitors, cooling towers pumps.

Application for diagnosis

Get a calculation for diagnostics and repair of a melting furnace

The engineer will contact you during the working day, clarify the model of the furnace, the nature of the malfunction and the expected timing - will offer a format of work for your case.

  • Initial assessment by symptoms and context
  • Calculation of the time of departure and cost of work
  • Response within one working day

Application for audit

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Technical assessment

How the technical audit of a melting furnace is carried out

6 successive stages - from the departure of the engineer to the defective list with parts and nodes for replacement.

01Departure to your company of our technical specialist
02Communicating with the engineering services of the enterprise to identify problems
03Inspection of equipment: smelting units, frequency converter, capacitors, cooling towers
04Identification of the causes of malfunctions for each node
05Preparation of a technical report with recommendations for elimination
06Development of a defective statement - parts and assemblies for replacement
Our Process

How the work on repairing the furnace is organized

4 stage - from clarifying the symptoms to monitoring the completed recovery.

Stage 1

Clarify the symptoms and production context

How exactly the problem manifests itself, at what stage of melting, what model of the furnace, the history of previous repairs.

Stage 2

Conducting a technical audit

Checklists for 4 nodes: melting points, frequency converter, capacitor battery, cooling tower. Report + defective statement.

Stage 3

Forming a recovery scenario

What nodes to restore, what to replace, how much ZIP you need to order, timing and cost. I agree with your engineers.

Stage 4

We carry out repair work

We eliminate defects, restore performance and check the correctness of the same checklists as during the audit.

Why us

Why melting furnace repair is entrusted to UralInduktor

We ourselves produce induction melting furnaces (21 model in the catalog, weight from 100 kg to 15 tons) - so we know their nodes from the inside and know how to diagnose the cause of the failure accurately.

01

Manufacturer of smelting furnaces

We know the design of the nodes from the inside - from the melting point to the thyristor power part. We repair our furnaces and analogues of other manufacturers.

02

Approach from the cause, not from the symptom

First, the audit of 4 nodes then a reasonable recovery. No “quick-hand clasps” that return the problem after six months.

03

Connection with ZIP and service

The defective statement immediately turns into an application for spare parts from a warehouse in Kazakhstan. After the repair, we proceed to the planned service support.

04

Assessment of the feasibility of repair

If the wear is deep and the repair is unprofitable, we will honestly offer an upgrade or replacement of the furnace. Even if it means leaving the repair deal in the supply of new equipment.

Service formats

In what format repairs can be carried out

From the emergency exit to a comprehensive audit of the entire fleet of smelting furnaces.

Format 01

Emergency exit and recovery

The oven stopped in the middle of the swim. Urgent departure of the team, diagnosis, restoration of efficiency in the shortest possible time.

Get calculation →
Format 02

Technical audit without repair

Get a technical report and a defective statement. Repairs can be carried out on your own according to our recommendations.

Get calculation →
Format 03

Scheduled repairs

Replacing worn out nodes before they go into failure. Based on the results of a previous audit or planned maintenance.

Get calculation →
Format 04

Repair + modernization

When the furnace needs to be restored, but it makes sense to simultaneously strengthen weak nodes or update the power part.

Get calculation →
Format 05

Service support

After repair, we take the furnace for planned maintenance: maintenance, ZIP from a warehouse in Kazakhstan, remote consultations, annual audit.

Get calculation →
Frequently Asked Questions

Answers to the most frequently asked questions

From the leading engineer of UralInduktor. If you do not find the answer, call us, we will deal with your situation in person.

We don't have your oven. Will you?

Yeah. We repair induction furnaces of different manufacturers - domestic and imported (including those removed from support). The structural principles of thyristor furnaces are similar: melting point + frequency converter + capacitor battery + cooling tower. We adapt checklists to a specific model.

What happens most often - skew knot, oil leakage or power part?

According to our practice: the most frequent are oil leaks in the hydraulic system of the melting unit (aging of hoses and seals) and failures of protection in the frequency converter (overheating of modules in the degradation of the cooling system). Less often - wear of gearboxes and weakening of bolt connections in the capacitor battery. But it is impossible to say exactly before the audit - you need a check-list check.

Is it possible to conduct an audit without stopping production?

Part of the checks (visual inspection, inspection of connections, condition of the hydraulic system) can be done in between smelters. Hydraulic testing and testing of frequency converter protections require the furnace to stop we will align the “window” with your production schedule, usually stacked in 1–2 working days.

How much does a technical audit cost?

Depends on the number of melting units, the distance to the plant and the scope of work. The cost of a basic audit — on request. We give the exact figure after a phone consultation with an engineer — we need to understand the furnace model and the nature of the symptoms.

When is repair better and when is modernization better?

If the wear is local (one or two nodes) and the furnace is relatively fresh, it is more profitable to repair. If the power part is outdated, the frequency converter is discontinued, the hydraulic system and capacitors have developed a resource - it makes sense to upgrade (replace the frequency converter with a modern, hydraulics update). After the audit, we will show the economics of both options.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
We will discuss the task

We'll discuss your task and propose a workable solution

Furnace selection, repair, upgrades, spare parts kit supply, service, leasing — we will join at whatever stage you are at now.