UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Service · Repair and modernization of furnaces

Repair, start-up and modernization of your melting and foundry equipment

We will put Soviet-era electric arc furnaces (EAF), induction units, and shot blasting machines into operation after mothballing or standstill. We will convert outdated relay logic to modern industrial electronics.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

savings
up to 70%
budget savings compared with buying new equipment
cost
up to 10 times
cheaper than a new equivalent — a modern system with digital control
warranty
18 months
warranty on work, components, and automation systems
experience
s 2014
experience in industrial metallurgy, projects across Kazakhstan and the CIS
Renovation of the Soviet legacy

A second life for your equipment: savings of up to 70% of the budget

Soviet-era melting and foundry equipment was built with a huge safety margin in its steel structures and mechanical parts. However, the electrical equipment, hydraulics, relay automation, and short networks of such units have become obsolete, both technologically and physically.

Buying new equipment of comparable capacity requires substantial capital investment and a long lead time for delivery. The engineering center of Gross Metal Engineering LLP UralInduktor offers an alternative solution — comprehensive de-mothballing, repair, and deep microprocessor-based modernization of the fleet of Soviet-era furnaces and units.

As a result, you get a modern, energy-efficient, and safe melting system with convenient digital control up to 10 times cheaper than buying a new equivalent.

Scope of work

Comprehensive scope of work for equipment renovation

We take on electric arc steelmaking furnaces (ДСП-0.5, ДСП-1.5, ДСП-3, ДСП-6, etc.), induction units, heat-treatment furnaces, and shot blasting machines of any year of manufacture.

01

In-depth technical audit and de-mothballing

  • Inspection and defect assessment of load-bearing steel structures, casings, and mechanical assemblies for tilting and moving the roof.
  • Measurement of the insulation resistance of furnace power transformers, checking of the tap changers (off-circuit and on-load types).
  • Assessment of the condition of the short network, water-cooled lines, and hydraulic systems.
02

Replacing outdated electrical equipment with modern electronics

  • Dismantling the «relay cabinet»: complete replacement of bulky relay-contactor circuits, magnetic amplifiers, and contactors with compact industrial controllers (PLC).
  • Digital electrode movement controllers: installation of microprocessor-based controllers that eliminate arc breaks, short circuits, and excessive electrode consumption.
  • Modern operator panels (HMI): touch-screen control, visualization of melting parameters, archiving of emergency events, and integration into the shop network.
  • Introduction of a variable frequency drive (VFD): soft start and precise drive control, reduced starting currents and mechanical wear.
03

Repair and modernization of related systems

  • Reconstruction of the short network: replacement of current leads, installation of modern flexible cables, and restoration of the contact groups of electrode holders to minimize electrical losses.
  • Hydraulics modernization: installation of modern pump stations, hydraulic directional valves with proportional control, and filtration units.
  • Refractory work: replacement of the lining, installation of modern water-cooled roofs and wall panels.
Comparison

Comparative benefit of modernization

Parameter Soviet-era equipment «as is» After modernization at «UralInduktor»
Management system Relays, contactors (frequent failures) Digital PLC controller (reliability 99.8%)
Arc/current control Manual or analog, with delays Microprocessor-based automation (ms response)
Energy consumption High losses from arc length and in the network Reduction in electricity consumption by 10–15%
Electrode consumption Increased due to frequent breakages Reduction in burn-off of up to 15–20%
Implementation costs — Up to 10 times lower than buying a new system
Why us

Experience and expertise of Gross Metal Engineering LLP UralInduktor

01

13+ years in the metallurgical engineering market

In-house production capacity in Kazakhstan.

02

In-house assembly of process control systems

We design and program the control cabinets ourselves, to suit the specifics of the particular shop and the customer's task.

03

Full «turnkey» cycle

From initial defect assessment and electronics selection to commissioning and bringing the furnace online on the first hot melt.

04

Warranty support

18 months of warranty on the work performed, installed components, and automation systems.

Result for the company

What the enterprise gets as a result

Commissioning by «UralInduktor» is not a formal certificate-signing procedure — it is engineering preparation of the melting unit for real production operation in the conditions of your shop.

Operating mode

Equipment in operation

You get not just an installed automation cabinet but a furnace fully brought up to operating parameters and ready for serial melting.

Under the task

Parameter tuning for your alloy

The electrical modes, currents, and voltages are tuned for the specific process: structural steels, cast irons, or special alloys.

Verification

Correct operation of all units

Identifying and eliminating potential bottlenecks in the hydraulics, cooling systems, and short network before moving to maximum shop loads.

Quick Start

Fewer errors and downtime at start-up

Quality debugging of the algorithms prevents emergency shutdowns and burn-through of roof rings in the first months of operation.

Training

Staff ready to work

Conducting briefings for steelmaker's helpers and shop electricians, and handing over operating procedures and as-built documentation.

Stability

Predictable operation

Establishing clear intervals between repairs and transparent management of the plant's energy consumption.

Production base

Experience and production capacity of «UralInduktor»

Astana
own base

In-house repair base in Kazakhstan

We design, assemble, and program the control cabinets of process control systems ourselves, without reselling third-party solutions.

s 2014
across Kazakhstan and CIS

Experience in industrial metallurgy since 2014

We travel to sites of any complexity across Kazakhstan and the CIS.

18 months
warranty

Warranty obligations

18 months on equipment of our own manufacture and on the installation and commissioning work performed.

Case study

Emergency restoration of the control system and start-up of an arc furnace at a ferroalloy plant

Problem and initial situation

An emergency occurred at a ferroalloy production plant: due to a short circuit in the shop network, the standard control system of the electric arc furnace failed and burned out completely. The equipment lost operability, and there was a threat of a prolonged shutdown of the foundry shop.

The engineering and service department of Gross Metal Engineering LLP UralInduktor was given a task — to restore the electric arc furnace to working order as quickly as possible and to propose a solution for the planned technical re-equipment of the facility.

Project implementation stages

1. On-site defect assessment and preparation of the technical solution. The «UralInduktor» engineering team arrived at the customer's site to assess the scale of the damage. The analysis showed that restoring the burned-out cabinet was not practical. «UralInduktor» specialists proposed a two-stage strategy:

  • Rapid start-up: temporary adaptation and installation of an alternative automation kit that the customer already had, to immediately remove the risk of downtime.
  • Planned modernization: design and assembly of a new specialized «UralInduktor» control cabinet with a digital arc controller.

2. Installation and fitting of the temporary process control system kit.

  • Control cable routes were laid out and installed on the electric arc furnace.
  • The power circuits and hydraulic drives were connected to the temporary control cabinet.
  • Software integration of the electrode movement control logic was carried out.

3. Commissioning and putting the furnace into operation.

  • Tuning of the electrical parameters and testing of the emergency protections.
  • Starting the furnace under load and supporting the first production melts by «UralInduktor» engineers.

Project results and prospects

  • 0 days of prolonged downtime: the plant's foundry area returned to normal operation in the shortest possible time.
  • Reliability: the electric arc furnace operates successfully under the control of the adapted automation system.
  • Design stage: development and assembly of a new full-featured «UralInduktor»-brand control system, designed with the highly aggressive environment of ferroalloy production in mind, are currently under way.
Photo of the electric arc furnace start-up at Ural Ferroalloys — electric arc furnace in the shop Photo of the electric arc furnace start-up at Ural Ferroalloys — process control system cabinet Photo of the electric arc furnace start-up at Ural Ferroalloys — furnace under load
1 / 3
Photo of the electric arc furnace start-up at Ural Ferroalloys
Frequently Asked Questions

Frequently asked questions

Can a furnace be restored if only the mechanical frame and the transformer are left of it?

Yes. This is standard practice. We design a new control system, manufacture the short network, upgrade the hydraulics, and tie the new electronics into the existing mechanical assemblies.

Do you replace imported electronics with domestic equivalents?

Yes, we build control cabinets based on available components and reliable industrial controllers that do not depend on sanctions restrictions.

How long do modernization and start-up take?

Depending on the condition of the mechanics and the scope of automation, the full cycle from audit to putting into operation under load takes from 2 weeks to 2 months.

Request for calculation

Calculate the cost of modernizing your equipment

Send the model of your furnace or unit, photos of its current condition, or a technical specification — «UralInduktor» engineers will prepare a commercial proposal and a technical concept within 1 business day.

  • Commercial proposal and technical concept
  • Assessment of the feasibility of repair or modernization
  • Response within one working day

Request for calculation

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Phone of the repair and service department+7 (775) 853-40-95Commercial proposal and technical concept within 1 business day
  • E-mail for the technical specification and photosstasgross.ru@gmail.comSend the furnace model, photos, or technical specification
  • Main office addressAstana, Saryarka district,
    Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
We will discuss the task

We'll calculate the cost of modernizing your equipment

Send the model of your furnace or unit, photos of its current condition, or a technical specification — we will prepare a commercial proposal and a technical concept within 1 business day.