УИ-110П transistor melting furnace
- Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
- Melting steel and cast iron up to 50 kg, copper up to 150 kg, aluminum up to 50 kg per cycle
- Transistor IGBT modules, 18-month warranty — official supply from the partner plant
Description
УИ-110П is a transistor melting furnace for small production batches. The load depends on the selected version: steel and cast iron 50 kg; copper 150 kg; aluminum 50 kg. The operating frequency is 1–20 kHz, the power supply is 380 V; the calculated power consumption is 112,55 kW.
- load — steel and cast iron 50 kg; copper 150 kg; aluminum 50 kg
- power supply — 380 V; calculated power consumption — 112,55 kW
- metal pouring — tilting via a gearbox, per the agreed configuration
- purpose — for a series-production area of up to 150 kg of copper or 50 kg of steel with a chiller sized by calculation
- УИ-110П is officially supplied by the partner factory; warranty 18 months.
What is УИ-110П furnace suitable for
The УИ-110П is designed for batches of up to 50 kg of steel or 150 kg of copper when a compact industrial-grade transistor system is needed. During selection, the steel grade, tapping temperature, usable crucible volume, and required mode are checked. A larger load cannot be accepted merely because it is close to the stated 50 kg.
Technical specifications
| Model | УИ-110П |
|---|---|
| Capacity by metal | steel and cast iron 50 kg; copper 150 kg; aluminum 50 kg |
| Crucible for copper: material | Silicon carbide (SiC) |
| Copper crucible dimensions, mm | 370(310) × 150 × 452 |
| Crucible for steel: material | Magnesium oxide (MgO) |
| Steel crucible dimensions, mm | Per the drawing of the agreed version |
| Inner diameter d for calculation, mm | Per the drawing of the agreed version |
| Inner depth h for calculation, mm | Per the drawing of the agreed version |
| Calculated volume to the brim, L | Per the drawing of the agreed version |
| Theoretical capacity for liquid steel to the brim, kg | Per the drawing of the agreed version |
| Estimated power consumption, kW | 112,55 |
| Power supply voltage, V | 380 |
| Operating frequency, kHz | 1–20 |
| Current consumption, A | 180 |
| Cooling water flow rate, L/min | 12–100 |
| Cooling water pressure, MPa | 0,15–0,25 |
| Maximum coolant temperature, °C | 40 |
| Overall dimensions, mm | 720 × 420 × 805 / 550 × 400 × 510 |
| Weight, kg | 81 / 48 |
| Converter | transistor, water-cooled |
| Drainage mechanism | Reducer - complete |
| Standard configuration | 1 transistor converter + 1 melting unit |
| Warranty | 18 months |
Crucibles for melting copper and steel
For copper, a silicon carbide crucible 370(310) × 150 × 452 mm is provided. For steel, a magnesite crucible based on magnesium oxide (MgO) is selected; its dimensions and usable volume are fixed in the drawing of the selected version. For bronze, cast iron, and other alloys, crucible compatibility is specified according to the composition and melting mode.
The capacity of a magnesite crucible is checked against its inner profile. For a cylindrical cavity, the reference calculation has the form V = πd²h/4, m = ρV; taper and fillets require separate accounting. The numerical estimate is made after the inner dimensions of the selected crucible are confirmed.
Capacity to the brim is a theoretical estimate under the stated assumptions. The working melt level is set below the rim; the nominal furnace load is given separately.
Overall dimensions — 720 × 420 × 805 / 550 × 400 × 510 mm; weight — 81 / 48 kg. The paired dimensions and weights refer to the two equipment units in the order of the original specification. The layout plan and connection dimensions are specified from the dimensional drawing.
Differences of the УИ-110П model
The calculated power consumption is 112,55 kW at a current of 180 A. The chiller and coolant lines are sized according to the converter, the inductor, and the actual length of the utilities. The flow range of 12–100 L/min is specified for the selected version and the set of cooled units.
Below it in the line is the УИ-90П (40 kg of steel or 120 kg of copper; calculated consumption 87,54 kW), above it — the УИ-160П (100 kg of steel or 200 kg of copper; calculated consumption 150,06 kW). The comparison is made by the mass of a single tap, the full cycle time, the available power, and the infrastructure cost.
Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.
Melting of aluminum and aluminum alloys
For the УИ-110П, the aluminum load is 50 kg in the version with a matched crucible and inductor. The crucible is selected by alloy, temperature, and fluxes; a steel crucible is not automatically carried over to aluminum.
For silumin, the working weight is specified by grade. With bulky returns or chips, batch loading may be required. The full cycle is calculated taking into account the charge, melting loss, holding and pouring.
Melting of cast iron and copper alloys
The cast iron load is 50 kg, the same as for steel. Crucible compatibility and mode are checked against the cast iron grade. For copper, the load is 150 kg; for brass, bronze, and other copper alloys, the permissible mass is specified according to the melt density, the usable volume of the crucible, and the tapping temperature.
Power supply and cooling
Power supply — 380 V; current consumption — 180 A. The converter provides an operating frequency of 1–20 kHz and requires continuous liquid cooling. The calculated power consumption of 112,55 kW serves as a guideline for a preliminary assessment of the network and is not the rated output power. The cable, protection, transformer, and allocated power are checked against the passport of the version, including auxiliary consumers. Cooling water flow rate — 12–100 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The thermal load of the entire unit and the distribution of flow among the circuits are calculated when designing the cooling system.
Switching on the heating of the УИ-110П is permitted only when the flow, pressure, and temperature of the coolant are confirmed. Protective grounding, emergency shutdown, and a switching device with a visible break are included in the connection design.
Metallurgical constraints
The operating frequency is related to the size of the inductor and the depth of current penetration. Unauthorized replacement of the crucible or inductor violates the agreement and can overload the converter.
For УИ-110П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.
Supply scope and boundaries
The standard configuration of the УИ-110П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor or matching unit, liquid-cooled current leads (power leads), controls, and documentation are assigned according to the model and the metal. A second melting unit can be supplied only as an additional version per the technical specification; one converter is not designed to power two units simultaneously. Cooling, transformer, fume extraction, foundation, installation, and commissioning are listed in separate lines unless included in the specification.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
- agree on pouring with tilting via a gearbox and include the mechanism in the configuration;
- define the set of functions of the PLC, archiving, energy metering, and exchange with the process control system for the УИ-110П;
- confirm the metal and the actual mass of issue for УИ-110П;
- calculate the full cycle of УИ-110П: loading, melting, delivery of the composition, release and preparation;
- check the 380 V network and the power reserve, taking auxiliary systems into account;
Manufacturing, commissioning and service
Before delivery, the УИ-110П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.
Popular versions of the УИ-110П are kept in stock under the warehouse program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, which is listed as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service, and repair.
Information to include in your request
To calculate the УИ-110П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V network, the existing cooling, the required crucible, and the pouring method.
Questions on selection and configuration
Which loads apply to the selected version
For the УИ-110П, separate loads are specified: steel and cast iron — 50 kg, copper — 150 kg, aluminum — 50 kg. These are application options of the model with a matched crucible and melting unit. For brass, bronze, silumin, gold, and silver, the permissible mass is specified according to the alloy and version; the same figure for different metals does not mean the crucibles are interchangeable.
How to match a furnace to the production program
First, specify the mass of usable metal required by the time of pouring and the number of taps per shift. Then compare the full cycle, whether the charge fits in the crucible, the pouring method and the available infrastructure. The chiller and the power supply input are checked for the whole installation. A higher model index by itself does not confirm a lower cost or a shorter cycle.
Which parameters to specify when ordering
For the УИ-110П, the specification records the metal grade, the working load and melt level, the crucible material and drawing, the pouring method, the cooling, and the controls. The calculated consumption of 112,55 kW is used for a preliminary assessment of the network; the final power supply requirements are taken from the passport of the version, taking auxiliary systems into account.
Related sections
- Transistor furnaces for steel and cast iron
- Transistor furnaces for copper, copper alloys and gold
- Transistor furnaces for aluminum and aluminum alloys
- All transistor melting furnaces
- Nearby smaller model УИ-90П
- Nearby large model УИ-160П
- Chiller and cooling systems
- Diagnostics and repair of induction furnaces
- Implemented projects
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.