UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 4

Transistor melting furnace УИ-45П

Price on request
18 kg
Steel and cast iron
50 kg
Copper
16 kg
Aluminium
42,52 kW
Estimated power consumption
  • Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
  • Melting of steel and cast iron up to 18 kg, copper up to 50 kg, aluminum up to 16 kg per cycle
  • Transistor IGBT modules, 18-month warranty — official supply from the partner plant

Description

УИ-45П is a transistor melting furnace for small production batches. The charge depends on the selected version: steel and cast iron 18 kg; copper 50 kg; aluminum 16 kg. Operating frequency — 1–20 kHz, supply — 380 V; calculated power consumption — 42,52 kW.

  • charge — steel and cast iron 18 kg; copper 50 kg; aluminum 16 kg
  • power supply — 380 V; calculated power consumption — 42,52 kW
  • metal pouring — tilting via a gearbox, per the agreed configuration
  • purpose — for serial non-ferrous casting of up to 50 kg of copper and small steel melts of up to 18 kg
  • УИ-45П is officially supplied by the partner factory; warranty of 18 months.

What is УИ-45П furnace suitable for

The furnace is designed for batches of up to 18 kg of steel or 50 kg of copper, when manual pouring must be replaced or supplemented by an agreed gear-driven tilt. The layout is chosen together with the height of the working platform and the receiving ladle.

Technical specifications

ModelУИ-45П
Capacity by metalsteel and cast iron 18 kg; copper 50 kg; aluminum 16 kg
Crucible for copper: materialSilicon carbide (SiC)
Copper crucible dimensions, mm295(250) × 170 × 365
Crucible for steel: materialMagnesium oxide (MgO)
Steel crucible dimensions, mm150(120) × 300(285)
Inner diameter d for calculation, mm120
Inner depth h for calculation, mm285
Calculated volume to the brim, L3,223
Theoretical capacity for liquid steel to the brim, kg≈ 22,6
Estimated power consumption, kW42,52
Power supply voltage, V380
Operating frequency, kHz1–20
Current consumption, A68
Cooling water flow rate, L/min10–60
Cooling water pressure, MPa0,15–0,25
Maximum coolant temperature, °C40
Overall dimensions, mm650 × 350 × 550 / 480 × 240 × 510
Weight, kg48 / 26
Convertertransistor, water-cooled
Drainage mechanismReducer - complete
Standard configuration1 transistor converter + 1 melting unit
Warranty18 months

Crucibles for melting copper and steel

For copper, a silicon carbide crucible 295(250) × 170 × 365 mm is provided; for steel — a magnesite crucible based on magnesium oxide (MgO), 150(120) × 300(285) mm. For bronze, cast iron and other alloys, crucible compatibility is clarified according to the composition and the melting mode.

The calculation up to the upper edge was made for a cylindrical cavity: V = πd²h/4, m = ρV. In the notation D(d) × H(h), the numbers in parentheses are taken as the inner diameter and depth. The density of liquid steel is taken as 7,0 kg/L. Taper, fillets and thermal expansion of the crucible are not taken into account.

Capacity to the brim is a theoretical estimate under the stated assumptions. The working melt level is set below the rim; the nominal furnace load is given separately.

Overall dimensions — 650 × 350 × 550 / 480 × 240 × 510 mm; weight — 48 / 26 kg. The paired dimensions and weights refer to the two equipment units in the order of the original specification. The layout plan and connection dimensions are specified from the dimensional drawing.

УИ-45П model differences

The calculated power consumption is 42,52 kW at a current of 68 A. For the selected melting unit, the pouring mechanism, the height of the working platform and the receiving ladle are agreed separately. The possibility of a gear-driven tilt must be fixed in the configuration.

Below it in the range is the УИ-35П (10 kg of steel or 30 kg of copper; calculated consumption 32,51 kW), above it — the УИ-70П (25 kg of steel or 100 kg of copper; calculated consumption 65,65 kW). The comparison is made by the mass of a single tap, the full cycle time, the available power and the cost of the infrastructure.

Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.

Melting of aluminum and aluminum alloys

For the УИ-45П, the aluminum charge is 16 kg in the version with a matched crucible and inductor. The crucible is selected according to the alloy, temperature and fluxes; a steel crucible is not automatically carried over to aluminum.

For silumin, the working weight is specified by grade. With bulky returns or chips, batch loading may be required. The full cycle is calculated taking into account the charge, melting loss, holding and pouring.

Melting of cast iron and copper alloys

The cast iron charge is 18 kg, the same as for steel. Crucible compatibility and the melting mode are checked against the cast iron grade. For copper, the charge is 50 kg; for brass, bronze and other copper alloys, the permissible mass is determined according to the melt density, the usable crucible volume and the tapping temperature.

Power supply and cooling

Supply — 380 V; current consumption — 68 A. The converter generates an operating frequency of 1–20 kHz and requires continuous liquid cooling. The calculated power consumption of 42,52 kW serves as a guide for a preliminary assessment of the power network and is not the rated output power. The cable, protection, transformer and allocated power are checked against the data sheet of the version, including auxiliary consumers. Cooling water flow — 10–60 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The heat load of the whole unit and the distribution of flow among the circuits are calculated when designing the cooling system.

Switching on the heating of the УИ-45П is permitted only when the coolant flow, pressure and temperature are confirmed. Protective grounding, emergency shutdown and a switching device with a visible break are included in the connection design.

Metallurgical constraints

The copper capacity (by mass) is usually higher than the steel capacity due to density and crucible geometry. For aluminum, aluminum alloys and precious metals, the charge is confirmed by a separate selection.

For УИ-45П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.

Supply scope and boundaries

The standard configuration of the УИ-45П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor or matching unit, liquid-cooled current leads (conductors), controls and documentation are determined by the model and the metal. A second melting unit can be supplied only as an additional version under the technical specification; one converter is not intended to power two units simultaneously. Cooling, transformer, exhaust ventilation, foundation, installation and commissioning are listed as separate lines unless they are included in the specification.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

  • check the 380 V network and the power reserve, taking auxiliary systems into account;
  • assign for УИ-45П a reverse cooling scheme, flow control and emergency stock;
  • agree for УИ-45П crucible or lining, loading method, ladle and local hood;
  • agree on pouring with tilting via a gearbox and include the mechanism in the configuration;
  • define the set of PLC, archiving, energy metering and process control system data exchange functions for the УИ-45П;

Manufacturing, commissioning and service

Before delivery, the УИ-45П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.

Popular versions of the УИ-45П are supported in the warehouse program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, quoted as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service and repair.

Information to include in your request

To perform the calculation for the УИ-45П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V mains, the existing cooling, the required crucible and the pouring method.

Questions on selection and configuration

Which loads apply to the selected version

Separate charges are specified for the УИ-45П: steel and cast iron — 18 kg, copper — 50 kg, aluminum — 16 kg. These are application options of the model with a selected crucible and melting unit. For brass, bronze, silumin, gold and silver, the permissible mass is determined according to the alloy and the version; the same figure for different metals does not mean the crucibles are interchangeable.

How to match a furnace to the production program

First, specify the mass of usable metal required by the time of pouring and the number of taps per shift. Then compare the full cycle, whether the charge fits in the crucible, the pouring method and the available infrastructure. The chiller and the power supply input are checked for the whole installation. A higher model index by itself does not confirm a lower cost or a shorter cycle.

Which parameters to specify when ordering

For the УИ-45П, the specification records the metal grade, the working charge and melt level, the crucible material and drawing, the pouring method, cooling and controls. The calculated consumption of 42,52 kW is used for a preliminary assessment of the power network; the final power supply requirements are taken from the data sheet of the version, taking auxiliary systems into account.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.