Transistor melting furnace УИ-8П
- Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
- Melting of gold — 6–8 kg, of steel — 3 kg with a magnesite crucible per cycle
- Transistor IGBT modules, 18-month warranty — official supply from the partner plant
Description
УИ-8П is a transistor melting furnace for small batches of metal. In the gold version, the charge is 6–8 kg. For copper and aluminum, a crucible matched to the inductor and the heating mode is selected. Calculated power consumption — 31,91 kW, supply — 380 V, operating frequency — 30–80 kHz.
- charge — gold 6–8 kg; copper up to 5,90 kg and aluminum up to 1,75 kg (calculated); steel 3 kg with a magnesite crucible
- power supply — 380 V; calculated power consumption — 31,91 kW
- pouring version — no tilting
- purpose — small-batch gold melting; versions for copper and aluminum are selected according to the crucible and mode;
- УИ-8П is officially supplied by the partner factory; warranty of 18 months.
What is УИ-8П furnace suitable for
The УИ-8П is selected according to the required metal and the mass of a single melt. Gold charge — 6–8 kg. For copper, brass, bronze and aluminum alloys, the crucible material, usable volume, matching with the inductor and the full cycle are checked. The model index does not represent a single charge for all metals. For steel, a separate version with a 3 kg magnesite crucible is provided.
Technical specifications
| Model | УИ-8П |
|---|---|
| Capacity by metal | gold 6–8 kg; copper up to 5,90 kg and aluminum up to 1,75 kg (calculated); steel 3 kg with a magnesite crucible |
| Gold load, kg | 6–8 |
| Crucible material for gold | High-density graphite |
| Dimensions of the graphite crucible for gold | Per the drawing of the agreed version |
| Estimated power consumption, kW | 31,91 |
| Power supply voltage, V | 380 |
| Operating frequency, kHz | 30–80 |
| Current consumption, A | 52 |
| Cooling water flow rate, L/min | 9 |
| Cooling water pressure, MPa | 0,15–0,25 |
| Maximum coolant temperature, °C | 40 |
| Overall dimensions, mm | 840 × 750 × 850 |
| Weight, kg | 150 |
| Converter | transistor, water-cooled |
| Drainage mechanism | No tilting |
| Standard configuration | 1 transistor converter + 1 melting unit |
| Warranty | 18 months |
| Calculated copper capacity at 95%, kg | up to 5,90 |
| Calculated aluminum capacity at 95%, kg | up to 1,75 |
| Steel load, kg | 3 |
| Crucible for steel | Magnesite (MgO), separate version |
Crucible for melting gold
To melt 6–8 kg of gold, a high-density graphite crucible is used, selected according to the usable volume, alloy composition and pouring temperature. For steel, copper and other metals, the crucible material, geometry and permissible charge are selected separately; the mass of gold cannot be transferred to another metal without checking the version.
The dimensions and fit of the replacement crucible are checked against the drawing of the agreed melting unit. During selection, the inner profile, wall thickness, height and margin to the rim at the working melt level are checked.
Overall dimensions — 840 × 750 × 850 mm; weight — 150 kg. The positioning at the workplace and the pouring method are specified from the dimensional drawing of the selected version.
УИ-8П model differences
With a calculated power consumption of 31,91 kW, the model occupies an intermediate position between the УИ-5П and the УИ-10П. The gold charge is 6–8 kg. The index «8» is not a universal capacity for all metals; another alloy requires a separate selection of the crucible and mode.
Below it in the range is the УИ-5П (5–6 kg of gold; calculated consumption 26,39 kW), above it — the УИ-10П (8–10 kg of gold; calculated consumption 42,96 kW). The comparison is made by the mass of a single tap, the full cycle time, the available power and the cost of the infrastructure.
Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.
Melting of copper and aluminum
Calculation for a crucible of 110 × 79 × 174 mm (outer Ø × inner Ø × height): copper up to 5,90 kg, aluminum up to 1,75 kg. The cavity is assumed to be cylindrical, and the bottom thickness is equal to the wall thickness. Fill level — 95%; rounded down in steps of 0,05 kg. Densities of pure liquid metals at melting temperature: 8,0 and 2,385 kg/L, respectively. Corner radii, taper and thermal expansion are not taken into account. This is a capacity guideline; the working load, melt level and crucible compatibility are confirmed for the selected alloy and version.
Separate crucibles are used for copper and aluminum, selected according to the alloy grade, fluxes, temperature and fit in the inductor. The dimensions of the gold crucible serve as initial data for selection but by themselves do not confirm the working load of another metal.
The working weight is determined from the inner profile of the crucible, the melt level and the density at the tapping temperature. The margin to the rim and the shape and volume of the charge are taken into account. The crucible material and the agreement on the melting unit are fixed in the specification.
Version for steel
For steel melting, the УИ-8П is supplied with a separate magnesite crucible with a load capacity of 3 kg. The graphite crucible for gold does not belong to this version. The inductor, crucible fit and operating mode are agreed for steel; the cast iron load for this small version is determined separately.
Power supply and cooling
Power supply — 380 V; current consumption — 52 A. The converter produces an operating frequency of 30–80 kHz and requires continuous liquid cooling. The calculated power consumption of 31,91 kW serves as a guide for a preliminary assessment of the supply network and is not the rated output power. The cable, protection, transformer and allocated power are checked against the data sheet of the version, including auxiliary loads. Cooling water flow rate — 9 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The heat load of the entire unit and the flow distribution among the circuits are calculated when designing the cooling system.
Switching on the heating of the УИ-8П is permitted only with confirmed coolant flow, pressure and temperature. Protective grounding, emergency shutdown and a switching device with a visible break are included in the connection design.
Metallurgical constraints
The operating frequency is related to the size of the inductor and the depth of current penetration. Unauthorized replacement of the crucible or inductor violates the agreement and can overload the converter.
For УИ-8П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.
Supply scope and boundaries
The standard configuration of the УИ-8П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor unit or matching unit, liquid-cooled current leads (conductors), controls and documentation are assigned according to the model and the metal. A second melting unit can be supplied only as an additional version under a technical specification; one converter is not designed to power two units simultaneously. Cooling, transformer, exhaust ventilation, foundation, installation and commissioning are listed as separate line items unless they are included in the specification.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
- agree for УИ-8П crucible or lining, loading method, ladle and local hood;
- fix the pouring version: no tilting;
- determine for the УИ-8П the set of functions for the PLC, archiving, energy metering and data exchange with the process control system;
- confirm the metal and the actual mass of issue for УИ-8П;
- calculate the full cycle of УИ-8П: loading, melting, delivery of the composition, release and preparation;
Manufacturing, commissioning and service
Before delivery, the УИ-8П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.
Common versions of the УИ-8П are included in the warehouse stock program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, which is listed as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service and repair.
Information to include in your request
For the calculation of the УИ-8П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V supply, the existing cooling, the required crucible and the pouring method.
Questions on selection and configuration
How to read the loads of this model
For the УИ-8П, the gold load range is 6–8 kg and refers to the agreed configuration options. Copper up to 5,90 kg and aluminum up to 1,75 kg are calculated guideline values based on the reference crucible geometry at a 95% fill. These data have a different status: the capacity calculation does not confirm the working load of another version. For a specific batch of gold, the drawing and the usable volume of the selected crucible are also checked.
What 95 percent filling means
The calculation assumes 95% of the volume of the cylindrical cavity, and the result is rounded down in steps of 0,05 kg. This filling level serves as a condition for estimating capacity and does not set a universal permitted melt level. The working level is assigned for a specific crucible, metal, loading method and pouring method. Fillets, taper and thermal expansion are not taken into account in this estimate.
How the version for steel differs
For the УИ-8П, a load of 3 kg of steel in a separate magnesite crucible is confirmed. When ordering this version, the crucible fit, inductor and operating mode are agreed. The gold range and the calculated values for copper and aluminum do not apply to this magnesite crucible. The cast iron load for this small version has not been confirmed separately.
Which parameters to specify when ordering
For the УИ-8П, the specification records the metal grade, working load and melt level, crucible material and drawing, pouring method, cooling and controls. The calculated consumption of 31,91 kW is used for a preliminary assessment of the supply network; the final power supply requirements are taken from the data sheet of the version, taking auxiliary systems into account.
Related sections
- Transistor furnaces for steel and cast iron
- Transistor furnaces for copper, copper alloys and gold
- Transistor furnaces for aluminum and aluminum alloys
- All transistor melting furnaces
- Nearby smaller model УИ-5П
- Nearby large model УИ-10П
- Chiller and cooling systems
- Diagnostics and repair of induction furnaces
- Implemented projects
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.