UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes

УИ-10П transistor melting furnace

Price on request
8–10 kg
Gold
up to 6,80 kg
Copper — calculation at 95%
up to 2,00 kg
Aluminum — calculation at 95%
42,96 kW
Estimated power consumption
  • Shipment from the warehouse — 1-3 dayShipment to Kazakhstan 3–10 days
  • Melting gold — 8–10 kg, steel — 5 kg with a magnesite crucible per cycle
  • Transistor IGBT modules, 18-month warranty — official supply from the partner plant

Description

УИ-10П is a transistor melting furnace for small batches of metal. In the gold version, the load is 8–10 kg. For copper and aluminum, a crucible matched to the inductor and the heating mode is selected. The calculated power consumption is 42,96 kW, the power supply is 380 V, and the operating frequency is 30–80 kHz.

  • load — gold 8–10 kg; copper up to 6,80 kg and aluminum up to 2,00 kg (calculation); steel 5 kg with a magnesite crucible
  • power supply — 380 V; calculated power consumption — 42,96 kW
  • pouring version — no tilting
  • purpose — small-batch gold melting; versions for copper and aluminum are selected according to the crucible and mode;
  • УИ-10П is officially supplied by the partner factory; warranty 18 months.

What is УИ-10П furnace suitable for

The УИ-10П is selected by the required metal and the mass of a single melt. The gold load is 8–10 kg. For copper, brass, bronze, and aluminum alloys, the crucible material, usable volume, matching with the inductor, and the full cycle are checked. The model index is not a single load for all metals. For steel, a separate version with a magnesite crucible for 5 kg is provided.

Technical specifications

ModelУИ-10П
Capacity by metalgold 8–10 kg; copper up to 6,80 kg and aluminum up to 2,00 kg (calculated); steel 5 kg with a magnesite crucible
Gold load, kg8–10
Crucible material for goldHigh-density graphite
Dimensions of the graphite crucible for goldPer the drawing of the agreed version
Estimated power consumption, kW42,96
Power supply voltage, V380
Operating frequency, kHz30–80
Current consumption, A70
Cooling water flow rate, L/min10
Cooling water pressure, MPa0,15–0,25
Maximum coolant temperature, °C40
Overall dimensions, mm840 × 750 × 850
Weight, kg160
Convertertransistor, water-cooled
Drainage mechanismNo tilting
Standard configuration1 transistor converter + 1 melting unit
Warranty18 months
Calculated copper capacity at 95%, kgup to 6,80
Calculated aluminum capacity at 95%, kgup to 2,00
Steel load, kg5
Crucible for steelMagnesite (MgO), separate version

Crucible for melting gold

For melting 8–10 kg of gold, a high-density graphite crucible is used, selected by usable volume, alloy composition, and pouring temperature. For steel, copper, and other metals, the crucible material, geometry, and permissible load are selected separately; the gold mass cannot be carried over to another metal without checking the version.

The dimensions and fit of the replacement crucible are checked against the drawing of the agreed melting unit. During selection, the inner profile, wall thickness, height and margin to the rim at the working melt level are checked.

Overall dimensions — 840 × 750 × 850 mm; weight — 160 kg. The placement at the workstation and the pouring method are specified from the dimensional drawing of the selected version.

Differences of the УИ-10П model

The calculated power consumption of the УИ-10П is 42,96 kW versus 31,91 kW for the УИ-8П; the gold load is 8–10 kg versus 6–8 kg. The next one, УИ-15П, belongs to the 1–20 kHz series, so comparing adjacent indices without taking the metal, frequency, and crucible into account is incorrect.

The nearest smaller model of the same high-frequency series is the УИ-8П (6–8 kg of gold; calculated consumption 31,91 kW). The УИ-15П operates at a frequency of 1–20 kHz and is selected separately for steel or copper. The comparison is made by the selected metal, the mass of a single tap, the full cycle time, and the infrastructure cost.

Load values refer to the agreed combinations of converter, inductor, and crucible. Performance is not derived from a single power: the calculation includes metal, initial temperature, preparation of furnace charge, casting and maintenance time of the crucible.

Melting of copper and aluminum

Calculation for a crucible of 120 × 84 × 180 mm (outer Ø × inner Ø × height): copper up to 6,80 kg, aluminum up to 2,00 kg. The cavity is assumed to be cylindrical; the bottom thickness equals the wall thickness. Fill — 95%; rounding down in steps of 0,05 kg. Densities of pure liquid metals at the melting temperature: 8,0 and 2,385 kg/L, respectively. Fillets, taper, and thermal expansion are not taken into account. This is a capacity guideline; the working load, melt level, and crucible compatibility are confirmed for the selected alloy and version.

Separate crucibles are used for copper and aluminum, selected according to the alloy grade, fluxes, temperature and fit in the inductor. The dimensions of the gold crucible serve as initial data for selection but by themselves do not confirm the working load of another metal.

The working weight is determined from the inner profile of the crucible, the melt level and the density at the tapping temperature. The margin to the rim and the shape and volume of the charge are taken into account. The crucible material and the agreement on the melting unit are fixed in the specification.

Version for steel

For melting steel, the УИ-10П is equipped with a separate magnesite crucible with a load of 5 kg. This version is not the graphite crucible version for gold. The inductor, crucible seating, and mode are agreed for steel; the cast iron load for this small version is determined separately.

Power supply and cooling

Power supply — 380 V; current consumption — 70 A. The converter provides an operating frequency of 30–80 kHz and requires continuous liquid cooling. The calculated power consumption of 42,96 kW serves as a guideline for a preliminary assessment of the network and is not the rated output power. The cable, protection, transformer, and allocated power are checked against the passport of the version, including auxiliary consumers. Cooling water flow rate — 10 L/min at a pressure of 0,15–0,25 MPa; maximum coolant temperature — 40 °C. The thermal load of the entire unit and the distribution of flow among the circuits are calculated when designing the cooling system.

Switching on the heating of the УИ-10П is permitted only when the flow, pressure, and temperature of the coolant are confirmed. Protective grounding, emergency shutdown, and a switching device with a visible break are included in the connection design.

Metallurgical constraints

The gold load applies to the agreed graphite crucible and the selected mode. For steel, copper, aluminum and other metals, the crucible material, frequency and permissible mass are confirmed by a separate selection. Differences in density by themselves do not prove that one version is suitable for another metal.

For УИ-10П, the working crucible and inductor are assigned to the selected boot string. Switching to another metal is possible after checking the frequency, geometry, crucible material and risk of melt contamination. The worker and backup crucibles can pick up and supply UralInduktor.

Supply scope and boundaries

The standard configuration of the УИ-10П includes one transistor frequency converter and one matched melting unit. The inductor, crucible, capacitor or matching unit, liquid-cooled current leads (power leads), controls, and documentation are assigned according to the model and the metal. A second melting unit can be supplied only as an additional version per the technical specification; one converter is not designed to power two units simultaneously. Cooling, transformer, fume extraction, foundation, installation, and commissioning are listed in separate lines unless included in the specification.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

  • fix the pouring version: no tilting;
  • define the set of functions of the PLC, archiving, energy metering, and exchange with the process control system for the УИ-10П;
  • confirm the metal and the actual mass of issue for УИ-10П;
  • calculate the full cycle of УИ-10П: loading, melting, delivery of the composition, release and preparation;
  • check the 380 V network and the power reserve, taking auxiliary systems into account;

Manufacturing, commissioning and service

Before delivery, the УИ-10П is checked according to the agreed program. Place, volume of load and acceptance criteria are fixed in a commercial offer or contract; the customer can participate in person or by video link. When commissioning, electrical and hydraulic connections, power configuration, technological smelting and training are checked.

Popular versions of the УИ-10П are kept in stock under the warehouse program; if the required configuration is not available, the delivery time is from 45 calendar days. Typical compact cooling is a chiller from the same manufacturer, which is listed as a separate item. The standard warranty for the unit and the chiller is 18 months. Gross Metal Engineering LLP performs installation, commissioning, training, service, and repair.

Information to include in your request

To calculate the УИ-10П, the following are needed: the metal and its mass, the type and size of the charge, the tapping temperature, the number of melts per shift, the 380 V network, the existing cooling, the required crucible, and the pouring method.

Questions on selection and configuration

How to read the loads of this model

For the УИ-10П, the gold load range is 8–10 kg and refers to agreed configuration options. Copper up to 6,80 kg and aluminum up to 2,00 kg are calculated guidelines based on the reference crucible geometry at a 95% fill. These data have different statuses: the capacity calculation does not confirm the working load of another version. For a specific batch of gold, the drawing and usable volume of the selected crucible are also checked.

What 95 percent filling means

The calculation assumes 95% of the volume of the cylindrical cavity, and the result is rounded down in steps of 0,05 kg. This filling level serves as a condition for estimating capacity and does not set a universal permitted melt level. The working level is assigned for a specific crucible, metal, loading method and pouring method. Fillets, taper and thermal expansion are not taken into account in this estimate.

How the version for steel differs

For the УИ-10П, a load of 5 kg of steel in a separate magnesite crucible is confirmed. When ordering this version, the crucible seating, inductor, and mode are agreed. The gold range and the calculated values for copper and aluminum do not apply to this magnesite crucible. The cast iron load for this small version has not been separately confirmed.

Which parameters to specify when ordering

For the УИ-10П, the specification records the metal grade, the working load and melt level, the crucible material and drawing, the pouring method, the cooling, and the controls. The calculated consumption of 42,96 kW is used for a preliminary assessment of the network; the final power supply requirements are taken from the passport of the version, taking auxiliary systems into account.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.