Industrial closed dual-circuit cooling towers УИГ from the manufacturer

UIG series cooling towers divert heat from induction units, power electronics, water-cooled cables and other industrial consumers. The working heat carrier circulates inside the closed heat exchanger and does not mix with water of the external irrigation circuit.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

in the model range
10 models
from УИГ-10Т to УИГ-200Т
Cooling
50 000 900 000 kcal/h
Range by model range
Power consumption
5,5 – 29,2 kW
standard mode across the range; maximum for sizing the power supply input — up to 44,2 kW
Resource of the Corps
10 years
galvanized steel, powder coating; heat exchanger AISI 304
Catalogue

Model range

10 models of own production - from УИГ-10Т (50 000 kcal/h, compact systems) to УИГ-200Т (900 000 kcal/h, for large foundries). Choose a model under the heat load of the equipment.

The range includes 10 sizes with a nominal cooling capacity from 50 000 to 900 000 kcal/h (from 58,2 to 1 046,7 kW of thermal power). УИГ-10Т–УИГ-120Т are produced in series; УИГ-160Т and УИГ-200Т, sectional and more powerful systems are designed to a technical specification.

For pre-selection, inform the mass of the garden and the power of the furnace. To confirm the model, attach the installation passport, temperature, coolant consumption and operating location data.

Get a calculation and a commercial offer →

When to choose a closed double-circuit cooling tower

UIG is used when heat is required to be withdrawn in the circulating system without contact of the working coolant with irrigation water and external air. Heat is transmitted through the wall of the heat exchanger and is discharged by air flow, and in the prescribed mode - with irrigation of its outer surface.

This separation of the contours reduces the direct flow of external dust and other contaminants into the working coolant. It does not cancel the requirements of the equipment manufacturer for the quality, composition and electrical conductivity of water, flow control and protection against overheating.

UIG is also used for condenser circuits of water-cooled chillers, compressors, hydraulic stations and other industrial consumers. However, the main task of this page is to select a cooling tower for an induction furnace. To choose between different cooling principles, use the page “Gradirnya or chiller”.

Preliminary selection by mass and power of the furnace

The mass of the nozzle and the installed electrical power of the induction furnace allow us to determine the initial size of the UIG. This is a working scale for pre-suggestion, not a replacement for heat calculation.

Finally, the model is chosen according to the total heat dissipation of all water-cooled units, the temperature of the supply and return water, the calculated flow rate, pressure requirements and the schedule of simultaneous work of consumers. For several furnaces, the total heat balance is made up.

Model range of UIG cooling towers

ModelNominal cooling capacity, kcal/hPower consumption, standard / maximum for input, kWPre-conformity of one induction furnace
УИГ-10Т50 0005,5 / 7,750–100 kg, up to 100 kW
УИГ-20Т100 0005,5 / 7,7150 kg, up to 160 kW
УИГ-30Т150 00010,7 / 16,2250–350 kg, up to 300 kW
УИГ-40Т200 00010,7 / 16,2500 kg, 400 kW
УИГ-60Т250 00015,7 / 23,2750 kg, up to 500 kW
УИГ-80Т400 00015,7 / 23,21000 kg, up to 800 kW
УИГ-100Т450 00023,2 / 38,2Up to 1500 kg at power up to 900 kW
УИГ-120Т500 00029,2 / 44,2Up to 2000 kg at power up to 1000 kW
УИГ-160Т800 00029,2 / 44,21500 kg / 1200 kW or up to 2000 kg / 1500 kW
УИГ-200Т900 00029,2 / 44,22000 kg, up to 1600 kW

For 3000 kg furnaces with a capacity of 2000–2400 kW and more preliminarily consider a sectional system or individual cooling tower of increased power.

For each model, two values of electrical power are shown. The first corresponds to the regular operation of one circulation pump, irrigation pump and fans. The second takes into account the short-term co-inclusion of the working and backup pumps when filling and removing air and is used to pre-calculate the feed input. Final cables, switching and protection devices are selected according to the electrical scheme of the supplied execution.

As confirmed by cooling capacity and model

The size of the UIG is pre-selected by the power of the induction furnace. Table characteristics of the line are confirmed by the operation of cooling towers with induction melting furnaces at existing enterprises. The mode of a specific object is confirmed by thermal and hydraulic calculation of the actual load, flow rate, temperatures, composition of the coolant and site conditions.

By prior agreement with the owner of the object, Gross Metal Engineering LLP can organize a visit to the enterprise where UIG works as part of the smelting complex. For a non-standard temperature chart, a special coolant or other industrial load, an individual heat and hydraulic calculation is performed.

When selecting check:

  • maximum and long-term heat load;
  • temperature of the coolant at the inlet and outlet;
  • consumption and allowable range of its change;
  • hydraulic resistance of equipment, heat exchanger and network;
  • composition and concentration of the coolant;
  • summer and winter conditions of the site;
  • simultaneous operation of consumers and the required reserve.

If the required temperature schedule cannot be achieved by a single serial UIG, an increased, sectional or combined performance shall be calculated.

How the UIG cooling tower works

The heat carrier receives heat from the equipment and enters the sealed heat exchanger UIG along the closed technological circuit. Outside the heat exchanger is blown in by air. When this is provided by the mode, irrigation of its outer surface is turned on; the working coolant at the same time remains inside the pipe circuit.

In a closed technological circuit, prepared water is preferable: compared to water-glycol mixtures, it has a higher heat capacity and lower viscosity. At the risk of negative temperatures, mixtures of water with ethylene glycol or propylene glycol are allowed. The type and concentration of the coolant is selected according to the minimum temperature, material compatibility and requirements of the cooled equipment; the effect of glycol on heat transfer, flow rate, pressure and pump power are taken into account by calculation.

The standard version is designed for ambient temperature from +5 to +30 °C. For year-round outdoor work, winter performance is required: one glycol does not replace thermal insulation, protection of pipelines, cabinets, valves and an agreed automation algorithm. If the entire closed circuit is in the heated room and is protected from the inflow of cold air, you can save the prepared water and its best thermal and physical properties.

A separate two-block layout simplifies the placement of the UIG in the existing workshop. According to the published dimensions, the sum of the areas in terms of the main blocks ranges from 2,91 m² for УИГ-10Т to 9,94 m² for УИГ-200Т; service passages, ducts, pipelines and installation zones are not included in these values. The ability to install is checked by height, openings, base, rigging, communications, and access for maintenance.

At internal placement it is recommended a separate inflow of pure external air to the heat exchanger and organized removal of heated humid air outside the building. This reduces the ingress of metallurgical dust and molding sand on the radiator and reduces the heat load on the workshop. The duct section and fans are checked for aerodynamic resistance; the outside air is often cooler than the air of the melting area.

Air ducts, transitions and insulated shibers with manual, pneumatic or electromechanical drive can be a separate delivery position or performed by the customer according to the requirements provided. Automatic shiber can be connected to the UIG cabinet, equipped with end sensors and blocking the start of fans until the opening is confirmed.

Production and tightness control

The key heat exchange, hydraulic and housing units of UIG are manufactured at the UralInduktor production site in Kazakhstan. The production cycle includes the winding of the pipe heat exchange radiator, the manufacture and welding of manifolds, fittings, adapters and expansion tanks, flexible, welding and painting of body parts, as well as the assembly of the control cabinet. The heat exchanger and wetted parts of its own manufacture are made of corrosion-resistant steel AISI 304; compatibility of purchased pumps, valves, seals and sensors with the coolant is checked separately.

The pump is chosen not by one type of cooling tower, but by the calculated working point of the system. To do this, determine the required supply and pressure, taking into account the resistance of equipment, pipelines and valves. Suitable models of JSC "Katai Pump Plant" or JSC "GMS Livhydromash" can be used in the agreed execution. The manufacturer, model, materials of flow part and seals, engine power and availability of reserve are fixed in the specification. Fans and electrical components are also fixed to a specific configuration.

The standard pump circuit includes one working and one reserve circulation pump. Usually switching is performed by the operator with the translation of the corresponding shut-off valves: it is easier to maintain and reduces the cost. At the first start, short-term joint operation of pumps for intensive contour pumping and air removal is allowed; it is not a constant mode. Automatic input of the reserve is implemented according to the technical task.

The tightness control is carried out in stages: the collectors are pressed to the general assembly at 10 atm, and the finished hydraulic system is pressed at 6 atm before shipment. These values refer to factory tests and are not working pressure; the permissible pressure is set by the passport of a particular execution and the project of the object. By prior agreement, the customer or his representative may be present during the inspection in person or by video link; the program, date and format of participation are determined for a specific order.

Serial, sectional and individual performance

Models УИГ-10Т, УИГ-20Т, УИГ-30Т, УИГ-40Т, УИГ-60Т, УИГ-80Т, УИГ-100Т and УИГ-120Т are supported in the warehouse program. The presence of a specific configuration is confirmed on the date of the request.

Serial range from 50 000 to 900 000 kcal/h does not limit the possibilities of production. For more load or special conditions, UralInduktor can develop a sectional or individual system, change the connection, pump group, reservation, winter execution and automation algorithms based on the results of the calculation and the agreed technical specifications.

Base data for cooling tower selection

To pre-select the cooling tower for the induction furnace, specify:

  • model, mass of the plant and electric power of the furnace;
  • the number of furnaces and the possibility of their simultaneous operation;
  • list of water-cooled units;
  • city and place of installation of cooling tower;
  • planned mode of operation and number of shifts.

For the final thermal and hydraulic calculation, you additionally need:

  • passport of cooled equipment and actual heat dissipation;
  • temperature of supply and return coolant;
  • flow rate, required pressure and allowable pressure losses for each branch;
  • type, composition, concentration and quality requirements of the coolant;
  • Pipeline scheme with lengths, diameters and fittings;
  • minimum and maximum temperature at the installation site;
  • availability of water, sewerage, power 380 V with N and PE, and for the room - the ability to bring the air ducts out;
  • the route from the УИГ to the furnace, the relative position of the two units and access for maintenance;
  • requirements for redundancy, automation, protection and communication with ICS TP.

If some parameters are not yet available, please send an existing passport and scheme. Engineers will note the missing data, without which it is impossible to confirm the operating mode.

Free engineering selection and commercial offer

An engineer will review your technical specification and existing equipment data sheets free of charge, make a preliminary calculation of the heat load, flow rate, head, electrical power and connection parameters, and select the УИГ model, pump group and redundancy. The lead time for preparing a commercial proposal is from one business day; the time for a complex or non-standard calculation will be agreed after we receive the source data.

After the conclusion of the contract at the request of the customer, we place the equipment free of charge on the provided workshop plan, specify the location of the nodes, the service areas and the characteristics of the supplied communications. We provide recommended sketches of foundations and site preparation tasks; full working construction documentation is included only with separate approval.

Delivery, commissioning and service

After the calculation, the model or execution of the UIG, the pumping group, automation, connection, placement and composition of the delivery will be agreed. According to the passport, the equipment is supplied partially disassembled: the heat exchange part, the expansion tank with the pump group and the control cabinet are separate units. External pipelines, power and signal cables, as well as a protective ground line are within the delivery limits only when directly indicated in the specification. For the object, binding drawings and requirements for installation and rigging are prepared.

After confirming the installation readiness, UralInduktor’s own team performs commissioning and commissioning of UIG at facilities in Kazakhstan and CIS countries. During the commissioning, the strapping and electrical connections are checked with the agreed scheme, the contour filling, the direction of rotation of the pumps and fans, the tightness of the connections, the operation of irrigation, protection, blocking and alarm. Then a test start is carried out and the installation is brought to an agreed mode. The composition of operations, limits of responsibility and acceptance parameters are fixed in the contract and the commission program.

For subsequent maintenance, spare parts are selected according to the factory configuration of a specific UIG. The availability of the position and the deadline are confirmed on the date of treatment.

With an increase in load after repeated heat and hydraulic calculation, you can increase the flow of the pump group, the area of the heat exchanger or both parameters.

One performer for the entire cooling circuit

UralInduktor is not only responsible for the production of cooling towers. According to the agreed volume, the team performs survey and project binding, foundation construction and other construction works, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system under load.

After launch, specialists conduct training and check the mode under load. In the future, diagnostics, audit, repair and modernization are available. For large projects, proven profile specialists are involved, with whom the company has been working for more than 13 years; individual engineers have over 40 years of industry experience.

Diagnostics, technical audit and modernization

“Gross Metal Engineering” LLP inspects cooling towers and industrial liquid cooling systems of domestic and foreign manufacturers. Experts assess not only the state of the heat exchanger, pumps, fans, automation and pipelines, but also the actual mode of the heat consumer. Remote primary diagnosis is possible according to the scheme, photos, video, temperatures, flow, pressure and log of accidents; its volume and conditions are determined individually.

By agreement, the specialist goes to the site, performs measurements and consultations. The result is drawn up in written technical opinion with identified defects, established or suspected causes, a list of works and components and the separation of measures for urgency. At the same time, you can get a commercial offer for repair or modernization, but the order of subsequent works is not required.

An audit can be ordered as an independent service. The agreed repair, installation and modernization works are guaranteed; the scope of obligations and conditions are fixed in the contract.

Experience of implementing «UralInduktor» cooling towers in figures

Statistics of the plant's deliveries and service start-ups based on 1C data (January 2013 — July 2026).

UIG cooling tower
≥ 177
УИГ cooling towers supplied
Closed dual-circuit cooling towers operating at foundry enterprises in Kazakhstan and the CIS.
Smelting Furnaces
223
Melting furnaces in combination
Conservatively verified induction melting complexes of our own manufacture.
completeness
~90%
Integrated supplies
Melting complexes of the plant are supplied with standard УИГ series cooling towers on a «turnkey» basis.
Service
1 010
Service events
836 equipment commissioning jobs + 174 separate service maintenance contracts.
Geography
60 / 118
Regions and cities
Geography of «UralInduktor» industrial equipment deployment across all of Kazakhstan.

Questions to Ask Before Selecting UIG

Is it possible to choose a cooling tower only by the mass of the furnace?

Mass and power give the original size. Finally check the total heat dissipation of all water-cooled nodes, temperature, flow rate, track resistance, climate and simultaneity of work.

Is the standard UIG suitable for a winter street?

The standard version does not promise winter operation. Street mode, non-freezing coolant, heating, draining and redundancy are calculated and recorded as a special performance.

How is the leakproofness checked before shipment?

The collectors of own manufacture are tested by pressure 10 atm, the assembled system is 6 atm. This is a factory tightness check, not an indication of the working pressure of the object.

How to Read an Index and Compare Models

The UIG index does not indicate the mass of the induction furnace and does not replace the calculation. First, they compare the nominal thermal power of the models, then check the actual heat dissipation of all consumers, temperature, flow rate, pressure, climate, coolant quality, redundancy and expansion prospects.

Cost, payment and leasing

Public prices are not published, because the cost depends on the metal, components, rate, pumping group, automation, winter performance, connections and scope of work. The duration of the commercial offer, the schedule of payments and the procedure for fixing the value are agreed individually and fixed in the contract.

Prepayment from 10% is possible for running warehouse positions, for large and non-standard systems - from 30%; exact conditions are specified in the offer. Leasing up to 5 years is issued through partner leasing companies. “Gross Metal Engineering” LLP operates under the general taxation system; equipment, components and services are supplied with VAT at the current rate and with closing documents.

Get a calculation and an offer for UIG

Attach the passport of the induction furnace or other cooled equipment and specify the known operating parameters. The technical proposal fixes the design mode, the selected model or individual execution, the composition of the delivery, the estimated electrical power and connection requirements.

Get a calculation and a commercial offer →

Hint to the form: model and power of the furnace; mass of the garden; number of installations; temperature; flow rate; coolant; mode of operation; city of installation; contact details to clarify the calculation.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.

Frequently Asked Questions

Questions about УИГ cooling towers

Didn't find an answer? Call us — an engineer will calculate the heat balance.

How does a closed cooling tower differ from an open one?

In a closed dual-circuit cooling tower, the working coolant flows inside a coil and does not mix with the water of the external spray circuit. The furnace circuit stays clean: dust, salts and evaporation products do not get into it.

How do I select a model for my furnace?

By charge weight and unit power: the page has a preliminary selection table and a list of source data for the engineer. The final model is confirmed by a heat calculation.

What is the cooling capacity range?

Ten models from УИГ-10Т to УИГ-200Т cover 50 000 — 900 000 kcal/h. Two-unit versions are available for multi-branch circuits.

How much power does the cooling tower itself consume?

In standard mode, 5,5 — 29,2 kW across the model range. The power supply input is sized for the maximum — up to 44,2 kW — so that it covers start-up modes.

What are the service life and warranty?

Casing service life — 10 years, warranty 18 months. The coils are made of stainless steel; leak-tightness is checked by pressure testing at our production site in Kazakhstan.