Industrial closed cooling tower УИГ-200Т (900 000 kcal/h)
- Delivery: within Kazakhstan — 1-3 dayin Kazakhstan 3–10 days
- Possible departure of the engineer to your facility
- Warranty of 18 months on equipment of our own production
Description
УИГ-200Т is the largest of the UralInduktor two-circuit cooling units. It is considered as a basic pre-selection option for an induction furnace with a capacity of 2000 kg and a capacity of 1600 kW. The final decision is made after checking the heat load, temperatures, coolant consumption, network resistance, climate and the required reserve.
The main task of the page is to select cooling for the 2000 kg/1600 kW bundle. For furnace 1500 kg/1200 kW or up to 2000 kg/1500 kW first consider УИГ-160Т. Such separation helps not to overstate the installed capacity of the system and choose the equipment according to the actual mode, and not only according to the maximum size.
Transfer TS to УИГ-200Т
УИГ-200Т for induction furnace 2000 kg, 1600 kW
The cooling tower removes heat from the closed technological circuit of the furnace. The calculation takes into account the inductor, power supply and other water-cooled nodes connected to the common network. If several furnaces, converters, hydro stations or auxiliary units work at the same time, the engineer draws up an overall heat balance taking into account the schedule of their inclusion.
This bundle of 2000 kg/1600 kW is the starting point of the selection, and not a replacement for the design calculation. It is necessary to check the maximum and long-term modes, allowable feed and return temperatures, flow rate, pressure losses and the conditions of the hottest period. For greater load, UralInduktor can develop a more powerful, sectional or individual system.
Second, УИГ-200Т is used in large centralized circuits of metallurgical and other industrial enterprises - for example, for a group of technological consumers, water-cooled chillers, compressor, energy or enrichment equipment. In each case, the applicability is confirmed by a separate calculation.
Main Features of УИГ-200Т
| Model | УИГ-200Т |
|---|---|
| Nominal cooling capacity | 900 000 kcal/h |
| Thermal power, kW (equivalent) | 1 046,7 |
| Power consumption: standard mode / maximum for the calculation of the feed input | 29,2 / 44,2 kW |
| Dimensions of the heat exchange unit (LWH) | 2900×2420×2980 mm |
| Mass of heat exchange unit without coolant and water irrigation system | 2240 kg |
| Pump and control unit dimensions (LWH) | 2250×1300×2560 mm |
| Mass of pump unit and control without coolant and water irrigation system | 730 kg |
| Indicative closed loop volume | 1900 l; specified by performance |
| The volume of the irrigation system tank | 2300 l |
| Supply of one circulating pump | 100 m³/h |
| Circuit Pump Scheme | 1 working + 1 backup; manual switching on a regular basis, automation — by technical specification |
| Irrigation Pump Feed | 64 m³/h |
| Passport Fan Group | 4 pcs. × 18 700–27 000 m³/h |
| Electric motor power of one main pump | 15 kW |
| Power of electric motor of irrigation pump | 2,2 kW |
| Power of electric motor of one fan | 3 kW |
| Heat exchanger connection | G4 |
| Attachment of irrigation system | G½ |
| Main Pump Pressure Tube | G4 |
| Power supply | 380 V, 3 phase, N and PE; 50 Hz |
| Working hours | Continual |
| Ambient temperature for standard design | From +5 up to +30 °C |
| Housing material | Galvanized steel, powder coating |
| Material of heat exchanger and wetted parts of own manufacture | Stainless Steel AISI 304 |
| Nominal service life in compliance with operational documentation | 10 years |
| Guarantee of own production equipment | 18 months; terms by contract and specification |
| Manufacturing | UralInduktor, Astana, Kazakhstan |
УИГ-200Т is preliminarily selected by the induction furnace power and confirmed by the total heat release of all liquid-cooled units. The value of 900 000 kcal/h is a characteristic of the size and has been confirmed by operation at existing melting sites. The operating mode of a specific site is checked against flow rate, temperatures, coolant composition, load schedule and installation conditions.
Electric power УИГ-200Т: 29,2 kW in normal mode and 44,2 kW as much as possible for preliminary calculation of the feed input. The standard value includes one circulation pump, irrigation pump and fan group. The maximum takes into account the short-term joint inclusion of the working and backup pumps at the initial filling and removal of air; cables, switching and protection are finally selected according to the electrical scheme of a particular execution.
In the standard scheme, one circulation pump works, the second is in reserve. Switching is performed by the operator with the translation of the corresponding shut-off valves. Automatic reserve input with sensors, executive fittings and locks is available according to the specifications.
УИГ-200Т is a large custom model of the presented line. According to the standard dimensions, two blocks occupy in the 9,94 m² plan without passages and communications; the layout is developed after checking the foundation, openings, rigging, air ducts, coolant lines and the required reserve.
What does the engineer check before choosing УИГ-200Т
First, determine the heat dissipation of all connected nodes and the simultaneity of their work. Then set the temperature of the coolant at the entrance and exit, check the calculated flow rate and the most severe summer mode. Separately assess whether a reserve is required when stopping the pump, fan or the entire installation for maintenance.
The hydraulic calculation shows the required supply and pressure of the pumping group. It needs lengths and diameters of pipelines, fittings, high-altitude marks and equipment resistance. The pump is selected at the working point from suitable models of JSC "Katai Pump Plant" or JSC "GMS Livhydromash". For continuous production, one УИГ-200Т is further compared with two smaller or sectional systems: the solution depends on the allowable downtime and maintenance mode.
How the two-way system works
The process heater moves inside the closed side of the heat exchanger. Outside, heat is released by the air flow and, in the prescribed mode, by the water of the irrigation circuit. The two circuits do not mix, so the water of the outer circuit does not enter the inductor, converter and other cooled nodes.
The heat exchanger and wetted parts are made of AISI 304 stainless steel. UralInduktor independently wraps the radiator, produces collectors, fittings, adapters and an expansion tank, performs welding, manufacturing and painting of the housing, assembles the control cabinet. Manufacturers of electric motors and electrical components are agreed with the customer and fixed in the specification after checking compatibility.
Basic data for calculation and technical proposal
To confirm УИГ-200Т for 2000 kg/1600 kW furnace, please transfer:
- passport of the furnace, power supply and other consumers;
- heat load or data to determine it;
- temperature of supply and return, flow, pressure and composition of the coolant;
- hydraulic circuit with diameters, lengths and elevations;
- schedule of simultaneous operation of the equipment;
- city and place of installation, estimated summer and winter conditions;
- requirements for redundancy, automation, alarm and ICS;
- plan of accommodation, travel and service restrictions.
Unknown parameters can be noted in the questionnaire. Before the release of the technical proposal, the engineer will indicate what data needs to be clarified by documents, calculation or measurement.
Inspection, delivery, commissioning and maintenance
The tightness of УИГ-200Т collectors is checked by pressing at 10 atm. Before shipment, the system in assembly is pressed at 6 atm. The approximate period from order confirmation to shipment is 30–60 days; the final period is fixed after agreeing on the technical solution and completeness. These values refer to factory tests for leakproofness and are not working pressure; the permissible pressure is set according to the passport of a specific execution and project documentation.
UralInduktor’s own team carries out commissioning and commissioning of the system at facilities in Kazakhstan and CIS countries. The main spare parts are supported for the service; the composition of the available positions and the time of dispatch are confirmed by the actual configuration and availability.
Large complex project with УИГ-200Т
For УИГ-200Т we design not a separate heat exchange unit, but a workable circuit of a large smelting complex or a sectional cooling system: check the thermal balance, flow and pressure, the most unfavorable branch, the quality of the coolant, the reservation algorithm, the emergency signals and the place of service.
After the conclusion of the contract at the request of the customer, we place УИГ-200Т free of charge on the provided workshop plan, specify the service areas and parameters of the applicable communications. We also provide recommended sketches of the foundation and site preparation tasks. According to the agreed volume, we can perform survey, construction work, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system; the boundaries of the work are fixed in the specification.
Individual production and life cycle of УИГ-200Т
УИГ-200Т is made to order according to the agreed thermal and hydraulic scheme. The term is confirmed in the commercial offer, taking into account the configuration and loading of production. Warranty for own production equipment - 18 months; diagnostics, repair and modernization are available. “Gross Metal Engineering” LLP also performs diagnostics, repair and modernization of cooling systems of domestic and foreign manufacturers. According to the results of the audit, the customer receives a written technical opinion; the service can be ordered separately, and the work performed is guaranteed under the contract.
Prepare a project proposal for УИГ-200Т
We will check the source data for free, perform a preliminary selection of УИГ-200Т and prepare a commercial offer - from 1 working day. The cost is calculated individually according to the configuration and scope of work; the duration of the offer, the payment schedule and the procedure for fixing the cost are fixed in the contract.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.