Industrial closed cooling tower УИГ-20Т (100 000 kcal/h)
- Delivery: within Kazakhstan — 1-3 dayin Kazakhstan 3–10 days
- Possible departure of the engineer to your facility
- Warranty of 18 months on equipment of our own production
Description
Two-circuit cooling tower УИГ-20Т is used for cooling the induction furnace capacity of 150 kg and power up to 160 kW as the initial size for the preliminary calculation. The nominal cooling capacity of the model is 100 000 kcal/h. Before incorporating УИГ-20Т into the project, engineers check how much heat actually enters the water and whether the system will be able to hold the specified temperatures in the summer.
Induction furnace cooling 150 kg
In the cooling system of the smelting unit, heat is diverted not only from the inductor. The total balance includes a converter, a capacitor battery and water-cooled currents. The set of nodes, the scheme of their connection and permissible temperatures differ, so it is wrong to choose a cooling tower only by the power of the furnace.
УИГ-20Т can also be calculated for water-cooled compressor, vacuum unit, hydraulic station, machine group or chiller condenser circuit. These applications do not change the order of selection: first determine the maximum heat dissipation, then the required flow and pressure loss in the network.
Basic parameters of УИГ-20Т
| Model | УИГ-20Т |
|---|---|
| Nominal cooling capacity | 100 000 kcal/h |
| Thermal power, kW (equivalent) | 116,3 |
| Power consumption: standard mode / maximum for the calculation of the feed input | 5,5 / 7,7 kW |
| Dimensions of the heat exchange unit (LWH) | 1875×1160×2120 mm |
| Mass of heat exchange unit without coolant and water irrigation system | 500 kg |
| Pump and control unit dimensions (LWH) | 1300×750×1800 mm |
| Mass of pump unit and control without coolant and water irrigation system | 200 kg |
| Indicative closed loop volume | 360 l; specified by performance |
| The volume of the irrigation system tank | 850 l |
| Supply of one circulating pump | 12,5 m³/h |
| Circuit Pump Scheme | 1 working + 1 backup; manual switching on a regular basis, automation — by technical specification |
| Irrigation Pump Feed | 10 m³/h |
| Passport Fan Group | 1 pcs. × 14 500–18 000 m³/h |
| Electric motor power of one main pump | 2,2 kW |
| Power of electric motor of irrigation pump | 2,2 kW |
| Power of electric motor of one fan | 1,1 kW |
| Heat exchanger connection | G2 |
| Attachment of irrigation system | G½ |
| Main Pump Pressure Tube | G2 |
| Power supply | 380 V, 3 phase, N and PE; 50 Hz |
| Working hours | Continual |
| Ambient temperature for standard design | From +5 up to +30 °C |
| Housing material | Galvanized steel, powder coating |
| Material of heat exchanger and wetted parts of own manufacture | Stainless Steel AISI 304 |
| Nominal service life in compliance with operational documentation | 10 years |
| Guarantee of own production equipment | 18 months; terms by contract and specification |
| Manufacturing | UralInduktor, Astana, Kazakhstan |
УИГ-20Т is preliminarily selected by the induction furnace power and confirmed by the total heat release of all liquid-cooled units. The value of 100 000 kcal/h is a characteristic of the size and has been confirmed by operation at existing melting sites. The operating mode of a specific site is checked against flow rate, temperatures, coolant composition, load schedule and installation conditions.
Electric power УИГ-20Т: 5,5 kW in normal mode and 7,7 kW as much as possible for preliminary calculation of the feed input. The standard value includes one circulation pump, irrigation pump and fan group. The maximum takes into account the short-term joint inclusion of the working and backup pumps at the initial filling and removal of air; cables, switching and protection are finally selected according to the electrical scheme of a particular execution.
In the standard scheme, one circulation pump works, the second is in reserve. Switching is performed by the operator with the translation of the corresponding shut-off valves. Automatic reserve input with sensors, executive fittings and locks is available according to the specifications.
УИГ-20Т retains a small area with a cooling capacity doubled relative to УИГ-10Т: the two main units occupy the dimensions of 3,15 m². The calculation of the installation zone additionally includes passages, connections, drains, ducts and access to the pumping group.
Why technological water remains in a closed circuit
The heated liquid from the furnace enters the heat exchanger УИГ-20Т. Through its wall, heat is transferred outwards and diverted by the flow of air, and under the prescribed regime, additionally by irrigation of the external surface. The technological and irrigation contours are separated, so the liquid passing through the inductor and power nodes does not mix with external water.
The heat exchanger and parts in contact with the process fluid are made of AISI 304 stainless steel. Pumps, sensors, valves, automation and connecting elements are determined by the design scheme. Purchased components and their brands are fixed in the specification of a specific delivery.
When УИГ-20Т comes first, and when - finally
The "150 kg oven, up to 160 kW - УИГ-20Т" link serves as a guide in the first step. From it, you can estimate the dimensions, electrical connection and the expected composition of the system. However, this reference does not take into account the characteristics of the power source, the number of simultaneously operating nodes, cycle duration and ambient temperature.
The final decision is made after heat and hydraulic calculation. The operating temperatures, design flow rate, pressure, track resistance, most severe long-term mode and stock are checked. The result can be confirmation of the УИГ-20Т, a change in its configuration or a transition to a smaller or larger model.
Background data for the technical proposal
So that the calculation is not based on assumptions, attach:
- passport of the furnace and its cooled components;
- known heat dissipation of each water-cooled unit;
- temperature at inlet and outlet, flow rate and working pressure;
- information about water or other used heat carrier;
- drawing or diagram of pipelines with lengths, diameters and high-altitude marks;
- melting schedule, the number of hours of continuous operation and possible simultaneous operation of consumers;
- site address, location УИГ-20Т and reservation requirements.
In the presence of the current contour, actual measurements of flow, temperature and pressure are useful. If this data is not available, the load is specified by passports and power balance. For a water-cooled chiller, heat dissipation of the capacitor is required: one cooling capacity is not enough to choose a cooling tower.
Tightness control, start-up and support
In production, УИГ-20Т collectors are pressed at 10 atm, after assembly, the entire system is at 6 atm. Before delivery, completeness is checked, and when binding, summer and winter modes, the composition of the coolant and network parameters are taken into account. These values refer to factory tests for leakproofness and are not working pressure; the permissible pressure is set according to the passport of a specific execution and project documentation.
The UralInduktor commissioning team goes to the enterprises of Kazakhstan and the CIS countries, carries out the commissioning of the contour and checks its work in the agreed mode. In the future, the necessary pumps, fans, nozzles, filters, valves, seals and electronic modules are supplied. The specific spare part is determined by the specification of the cooling tower.
Arrangement of УИГ-20Т in the existing workshop
For УИГ-20Т, we design not a separate heat exchange unit, but a workable contour of the smelting area with a furnace near 150 kg: check the thermal balance, flow and pressure, the most unfavorable branch, the quality of the coolant, the reservation algorithm, the emergency signals and the place of service.
After the conclusion of the contract at the request of the customer, we place УИГ-20Т free of charge on the provided workshop plan, specify the service areas and parameters of the applicable communications. We also provide recommended sketches of the foundation and site preparation tasks. According to the agreed volume, we can perform survey, construction work, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system; the boundaries of the work are fixed in the specification.
Warehouse program and service УИГ-20Т
УИГ-10Т-УИГ-120Т is produced serially, and a part of the size is usually stored in a warehouse. The actual availability, completeness and duration are confirmed in the proposal at the date of the request. The warranty for own-made equipment is 18 months. Diagnostics, contour audit, repair, upgrading and supply of components are available. Gross Metal Engineering also provides diagnostics, repairs and upgrading of cooling systems for domestic and foreign producers. On the basis of the audit, the applicant receives a written technical opinion; the service can be ordered separately and the work performed is guaranteed under the contract.
Choose УИГ-20Т for furnace power
We will check the source data for free, perform a preliminary selection of УИГ-20Т and prepare a commercial offer - from 1 working day. The cost is calculated individually according to the configuration and scope of work; the duration of the offer, the payment schedule and the procedure for fixing the cost are fixed in the contract.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.
