Industrial closed cooling tower УИГ-120Т (500 000 kcal/h)
- Delivery: within Kazakhstan — 1-3 dayin Kazakhstan 3–10 days
- Possible departure of the engineer to your facility
- Warranty of 18 months on equipment of our own production
Description
УИГ-120Т is a closed two-circuit cooling tower for induction smelting furnace and centralized industrial circuit. For a furnace with a capacity of up to 2000 kg and a capacity of up to 1000 kW, it is considered as the base model at the pre-selection stage. Before ordering, compliance is confirmed by the actual heat dissipation, temperature regime and hydraulics of the object.
The heat carrier of the equipment circulates in a closed part of the system and transfers heat through the heat exchanger. The water of external irrigation does not mix with it. When connecting several consumers, this scheme allows you to combine heat dissipation, but requires the calculation of each branch, balancing and pre-agreed redundancy.
Passport details УИГ-120Т
| Model | УИГ-120Т |
|---|---|
| Nominal cooling capacity | 500 000 kcal/h |
| Thermal power, kW (equivalent) | 581,5 |
| Power consumption: standard mode / maximum for the calculation of the feed input | 29,2 / 44,2 kW |
| Dimensions of the heat exchange unit (LWH) | 2500×2420×2270 mm |
| Mass of heat exchange unit without coolant and water irrigation system | 1500 kg |
| Pump and control unit dimensions (LWH) | 2250×1200×1950 mm |
| Mass of pump unit and control without coolant and water irrigation system | 450 kg |
| Indicative closed loop volume | 1350 l; specified by performance |
| The volume of the irrigation system tank | 2300 l |
| Supply of one circulating pump | 100 m³/h |
| Circuit Pump Scheme | 1 working + 1 backup; manual switching on a regular basis, automation — by technical specification |
| Irrigation Pump Feed | 32 m³/h |
| Passport Fan Group | 4 pcs. × 18 700–27 000 m³/h |
| Electric motor power of one main pump | 15 kW |
| Power of electric motor of irrigation pump | 2,2 kW |
| Power of electric motor of one fan | 3 kW |
| Heat exchanger connection | G3 |
| Attachment of irrigation system | G½ |
| Main Pump Pressure Tube | G3½ |
| Power supply | 380 V, 3 phase, N and PE; 50 Hz |
| Working hours | Continual |
| Ambient temperature for standard design | From +5 up to +30 °C |
| Housing material | Galvanized steel, powder coating |
| Material of heat exchanger and wetted parts of own manufacture | Stainless Steel AISI 304 |
| Nominal service life in compliance with operational documentation | 10 years |
| Guarantee of own production equipment | 18 months; terms by contract and specification |
| Manufacturing | UralInduktor, Astana, Kazakhstan |
УИГ-120Т is preliminarily selected by the induction furnace power and confirmed by the total heat release of all liquid-cooled units. The value of 500 000 kcal/h is a characteristic of the size and has been confirmed by operation at existing melting sites. The operating mode of a specific site is checked against flow rate, temperatures, coolant composition, load schedule and installation conditions.
Electric power УИГ-120Т: 29,2 kW in normal mode and 44,2 kW as much as possible for preliminary calculation of the feed input. The standard value includes one circulation pump, irrigation pump and fan group. The maximum takes into account the short-term joint inclusion of the working and backup pumps at the initial filling and removal of air; cables, switching and protection are finally selected according to the electrical scheme of a particular execution.
In the standard scheme, one circulation pump works, the second is in reserve. Switching is performed by the operator with the translation of the corresponding shut-off valves. Automatic reserve input with sensors, executive fittings and locks is available according to the specifications.
УИГ-120Т is made of wide separate modules: the sum of their overall areas is 8,75 m² without installation and service areas. During the layout, the openings, bearing capacity of the base, rigging, collectors, the balance of branches and the route of supply and exhaust ducts are checked in advance.
Selection for furnace up to 2000 kg and 1000 kW
The furnace parameters are used as a benchmark for quick comparison with the UIG series. The final selection of УИГ-120Т is carried out according to the sum of heat emissions of the inductor, power converter, capacitor battery and auxiliary equipment. Separately, the duration of the peak is estimated, because short-term and long-term regimes have different requirements for the system.
The УИГ-100Т and УИГ-120Т are compared by design load, work point, and required redundancy: the nominal power difference alone does not confirm the stock on the facility. For loading above the capabilities of a single installation, sectioning or an individual system is considered. For less heat dissipation, a more compact model is chosen without an unreasonable increase in equipment.
Work as part of the central circuit
In the inner part of the system, distilled water, recommended by the management, collects heat from consumers. Another coolant is used only after checking compatibility with cooled equipment, seals and UIG materials. Through the wall of the heat exchanger heat is transferred to the outside and is diverted by air flow and provided irrigation. The lines are hydraulically separated.
In addition to the induction furnace, УИГ-120Т can be calculated for generators, turbine oil coolers, power converters and other power equipment. If consumers work with different pressures or requirements to the heat carrier, they are separated by regular or intermediate heat exchangers. The need for such a scheme is determined during design.
What to provide for the final selection
The engineer needs:
- passports of the furnace and all water-cooled units;
- maximum thermal load and duration of the mode;
- simultaneity table of the connected equipment;
- the temperature of supply and return, the consumption of each branch;
- working and allowable pressure, losses in pipelines;
- water quality or composition and compatibility of another coolant;
- scheme of shop network with diameters, fittings and high-altitude marks;
- Place of installation and estimated summer and winter conditions;
- the required reserve of pumps and heat-trapping sections;
- allowable downtime and exchange signals with ICS TP.
Thermal calculation establishes the required ability, and hydraulic - the working point of pumps. Pressure losses are determined by the most unfavorable branch; high-altitude marks are checked when filled, as well as to control static pressure and pressure at the top point.
Equipment and adaptation to the site
The heat exchanger and wetted elements are made of AISI 304 stainless steel. УИГ-120Т body is made of galvanized steel with powder coating. The pump is selected according to the estimated supply and pressure from the model range of JSC “Katai Pump Plant” or JSC “GMS Livhydromash”, the fans are supplied by JSC “NPO “Teplomash”. Specific nodes are fixed in the specification.
When binding, the power supply parameters, hydraulics of the shop network, the base, access to service and the interface of the ICS are taken into account. For external installation, the composition of the coolant and winter protection are agreed. If the customer chooses a manufacturer of controllers, contactors, sensors or protection devices, the components are checked for compliance with the project. The degree of protection of electrical performance is specified according to the agreed configuration.
Factory testing, commissioning and further service
УИГ-120Т collectors are pressed for tightness at 10 atm, assembled cooling tower before shipment - at 6 atm. After installation, UralInduktor specialists can carry out commissioning work together with the customer's personnel and put the system into operation. Basic spare parts are supplied for maintenance. If equipment is added to the circuit, the heat and hydraulic calculation is first repeated, then the necessary modernization is determined. These values refer to factory tests for leakproofness and are not working pressure; the permissible pressure is set according to the passport of a specific execution and project documentation.
Arrangement of large УИГ-120Т
For УИГ-120Т, we design not a separate heat exchange unit, but a workable circuit of the site with a furnace near 2000 kg: we check the thermal balance, flow and pressure, the most unfavorable branch, the quality of the coolant, the reservation algorithm, the emergency signals and the place of service.
After the conclusion of the contract at the request of the customer, we place УИГ-120Т free of charge on the provided workshop plan, specify the service areas and parameters of the applicable communications. We also provide recommended sketches of the foundation and site preparation tasks. According to the agreed volume, we can perform survey, construction work, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system; the boundaries of the work are fixed in the specification.
Production readiness and service УИГ-120Т
УИГ-10Т-УИГ-120Т is produced serially, and a part of the size is usually stored in a warehouse. The actual availability, completeness and duration are confirmed in the proposal at the date of the request. The warranty for own-made equipment is 18 months. Diagnostics, contour audit, repair, upgrading and supply of components are available. Gross Metal Engineering also provides diagnostics, repairs and upgrading of cooling systems for domestic and foreign producers. On the basis of the audit, the applicant receives a written technical opinion; the service can be ordered separately and the work performed is guaranteed under the contract.
Calculate pumping mode УИГ-120Т
We will check the source data for free, perform a preliminary selection of УИГ-120Т and prepare a commercial offer - from 1 working day. The cost is calculated individually according to the configuration and scope of work; the duration of the offer, the payment schedule and the procedure for fixing the cost are fixed in the contract.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.