Industrial closed cooling tower УИГ-40Т (200 000 kcal/h)
- Delivery: within Kazakhstan — 1-3 dayin Kazakhstan 3–10 days
- Possible departure of the engineer to your facility
- Warranty of 18 months on equipment of our own production
Description
УИГ-40Т is a closed dual-circuit cooling tower and the base option for preliminary selection for an induction furnace with a capacity of 500 kg and a power of 400 kW. This combination was used in a completed УИГ-40Т project with a 500 kg, 400 kW furnace. For a new site, the model must be verified against the heat release of all water-cooled units, the required temperature schedule and the design summer mode.
УИГ-40Т in 500 kg furnace cooling system
Stopping cooling or exceeding the allowed temperature can trigger the protection of the smelter. Therefore, the calculation is based on the maximum long-term load, and not on the average value per shift. In addition to the inductor, the balance includes a converter, a capacitor battery and water-cooled currents.
The secondary applications of УИГ-40Т are the group of water-cooled compressors, central hydraulic station, presses, oil coolers, production line or capacitor circuit of the refrigeration machine. In each case, the model is confirmed by the actual heat entering the water, and not by the total electrical power of the equipment actuators.
Specifications of УИГ-40Т
| Model | УИГ-40Т |
|---|---|
| Nominal cooling capacity | 200 000 kcal/h |
| Thermal power, kW (equivalent) | 232,6 |
| Power consumption: standard mode / maximum for the calculation of the feed input | 10,7 / 16,2 kW |
| Dimensions of the heat exchange unit (LWH) | 2480×1160×2120 mm |
| Mass of heat exchange unit without coolant and water irrigation system | 700 kg |
| Pump and control unit dimensions (LWH) | 1500×750×1800 mm |
| Mass of pump unit and control without coolant and water irrigation system | 250 kg |
| Indicative closed loop volume | 450 l; specified by performance |
| The volume of the irrigation system tank | 1150 l |
| Supply of one circulating pump | 25 m³/h |
| Circuit Pump Scheme | 1 working + 1 backup; manual switching on a regular basis, automation — by technical specification |
| Irrigation Pump Feed | 16 m³/h |
| Passport Fan Group | 1 pcs. × 18 700–27 000 m³/h |
| Electric motor power of one main pump | 5,5 kW |
| Power of electric motor of irrigation pump | 2,2 kW |
| Power of electric motor of one fan | 3 kW |
| Heat exchanger connection | G3 |
| Attachment of irrigation system | G½ |
| Main Pump Pressure Tube | G3 |
| Power supply | 380 V, 3 phase, N and PE; 50 Hz |
| Working hours | Continual |
| Ambient temperature for standard design | From +5 up to +30 °C |
| Housing material | Galvanized steel, powder coating |
| Material of heat exchanger and wetted parts of own manufacture | Stainless Steel AISI 304 |
| Nominal service life in compliance with operational documentation | 10 years |
| Guarantee of own production equipment | 18 months; terms by contract and specification |
| Manufacturing | UralInduktor, Astana, Kazakhstan |
УИГ-40Т is preliminarily selected by the induction furnace power and confirmed by the total heat release of all liquid-cooled units. The value of 200 000 kcal/h is a characteristic of the size and has been confirmed by operation at existing melting sites. The operating mode of a specific site is checked against flow rate, temperatures, coolant composition, load schedule and installation conditions.
Electric power УИГ-40Т: 10,7 kW in normal mode and 16,2 kW as much as possible for preliminary calculation of the feed input. The standard value includes one circulation pump, irrigation pump and fan group. The maximum takes into account the short-term joint inclusion of the working and backup pumps at the initial filling and removal of air; cables, switching and protection are finally selected according to the electrical scheme of a particular execution.
In the standard scheme, one circulation pump works, the second is in reserve. Switching is performed by the operator with the translation of the corresponding shut-off valves. Automatic reserve input with sensors, executive fittings and locks is available according to the specifications.
УИГ-40Т is applied in a confirmed production bundle with 500 kg/400 kW induction furnace after checking the specific mode. The sum of the areas in terms of two blocks is 4,00 m² without passages and communications; blocks can be spread taking into account tracks and maintenance.
What happens to the heat in the two-circuit cooling tower
The liquid from the furnace moves along a sealed technological circuit and gives heat through the wall of the heat exchanger. On the other hand, heat is released by air and, when it is provided by the regime, water of the external irrigation circuit. The water of irrigation and the heater of the induction unit do not mix.
The УИГ-40Т heat exchanger is infused at UralInduktor. Radiator, collectors, fittings, adapters and other wettable elements are made of stainless steel AISI 304. Connection design can be adapted to the existing route; pumps, filters, valves, sensors, and automation are matched to an agreed operating point.
Pre-binding and final engineering solution
Pre-selection answers the question of what size should be considered first. For the 500 kg and 400 kW furnace, this option is УИГ-40Т. At this stage, you can evaluate the accommodation, food, indicative equipment and budget.
The final selection answers another question: whether a specific installation will provide acceptable temperatures at the maximum load on this site. For this, heat, flow and pressure are calculated, the most unfavorable branch, summer climate, winter operation and the required reserve are estimated. As a result, УИГ-40Т is confirmed, its execution changes or a neighboring model is selected. This is especially important if several consumers are connected to one circuit or expansion is planned.
Five groups of input data for calculation
To prepare a reasonable proposal, you must send:
- The passport of the furnace, converter and other water-cooled units, as well as well-known heat dissipation.
- Required temperatures before and after the consumer, flow rate, working pressure and composition of the coolant.
- Outline: lengths and diameters of pipes, fittings, height differences and the distance of the most unfavorable branch.
- Duration of melting, number of shifts, simultaneity of equipment operation and maximum continuous mode.
- City, place of installation УИГ-40Т, winter conditions, reservation requirements and ICS TP signals.
If the furnace manufacturer has not indicated the heat load, it is determined by the power balance or by the measured flow and temperature difference. Passports are enough for the initial assessment, but the final calculation requires the parameters of the system and the site.
Checks before shipment, commissioning and further service
УИГ-40Т collectors are pressurized to tightness at 10 atm. After assembly is completed, the installation is pressurized at 6 atm. Before delivery, completeness is checked, and the project fixes the delivery boundaries, connection requirements and agreed components. These values refer to factory tests for leakproofness and are not working pressure; the permissible pressure is set according to the passport of a specific execution and project documentation.
The UralInduktor brigade carries out commissioning and commissioning of equipment at facilities in Kazakhstan and CIS countries. Pumps, fans, nozzles, filters, seals and automation modules are available for further maintenance. When connecting an additional consumer, the heat load and hydraulic losses are checked again first, and only then the upgrade option is determined.
Furnace circuit 500 kg and УИГ-40Т
For УИГ-40Т, we design not a separate heat exchange unit, but a workable line circuit with a 500 kg furnace and a 400 kW converter: check the thermal balance, flow and pressure, the most unfavorable branch, the quality of the coolant, the reservation algorithm, the emergency signals and the place of service.
After the conclusion of the contract at the request of the customer, we place УИГ-40Т free of charge on the provided workshop plan, specify the service areas and parameters of the applicable communications. We also provide recommended sketches of the foundation and site preparation tasks. According to the agreed volume, we can perform survey, construction work, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system; the boundaries of the work are fixed in the specification.
Production, warranty and support of УИГ-40Т
УИГ-10Т-УИГ-120Т is produced serially, and a part of the size is usually stored in a warehouse. The actual availability, completeness and duration are confirmed in the proposal at the date of the request. The warranty for own-made equipment is 18 months. Diagnostics, contour audit, repair, upgrading and supply of components are available. Gross Metal Engineering also provides diagnostics, repairs and upgrading of cooling systems for domestic and foreign producers. On the basis of the audit, the applicant receives a written technical opinion; the service can be ordered separately and the work performed is guaranteed under the contract.
Check mode УИГ-40Т
Send technical passports, binding scheme and information about the operating mode of the furnace. The commercial proposal will reflect the confirmed model of the cooling tower, the calculated temperature regime, the flow and pressure of the pumping group, equipment, installation requirements, production time and cost. If the calculation shows that a different stock or other execution is required for the furnace, this will be indicated before ordering the equipment.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.
