UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 5
Own production own production in Kazakhstan

Industrial closed cooling tower УИГ-10Т (50 000 kcal/h)

Availability and lead time — in the proposal as of the date of requestPrice on request
50 000 kcal/h
Cooling ability
5,5 / 7,7 kW
Power consumption
1875×1030×2120 mm
Dimensions of the DYSHYV block
400 kg
Heat Exchange Unit Mass
  • Delivery: within Kazakhstan — 1-3 dayin Kazakhstan 3–10 days
  • Possible departure of the engineer to your facility
  • Warranty of 18 months on equipment of our own production

Description

УИГ-10Т is a two-circuit cooling tower for heat removal from a small induction melting or heating unit. For 50–100 kg furnaces and up to 100 kW capacity, the model is used as a basic pre-selection option. The correspondence of a particular furnace is confirmed by calculation: the same power source does not mean the same load on the cooling system.

Check the applicability of УИГ-10Т →

Which equipment is suitable for УИГ-10Т

When calculating the cooling of the induction furnace, heat is taken into account, which is transmitted to the water by the inductor, converter, capacitor battery and water-cooled currents. It is important not only the total load, but also the duration of the melting, the permissible water temperature, flow and mode of operation in the hottest period.

УИГ-10Т is designed for a separate technological consumer or a small production site. In addition to the induction unit, it can be a hydro station, an oil station, a water-cooled spindle, a test bench, a compressor, a vacuum pump or a power converter. Such applications are additional: the main decision on the suitability of the model is made by thermal and hydraulic calculation of a specific circuit.

Specifications of УИГ-10Т

ModelУИГ-10Т
Nominal cooling capacity50 000 kcal/h
Thermal power, kW (equivalent)58,2
Power consumption: standard mode / maximum for the calculation of the feed input5,5 / 7,7 kW
Dimensions of the heat exchange unit (LWH)1875×1030×2120 mm
Mass of heat exchange unit without coolant and water irrigation system400 kg
Pump and control unit dimensions (LWH)1300×750×1800 mm
Mass of pump unit and control without coolant and water irrigation system200 kg
Indicative closed loop volume330 l; specified by performance
The volume of the irrigation system tank750 l
Supply of one circulating pump12,5 m³/⁠h
Circuit Pump Scheme1 working + 1 backup; manual switching on a regular basis, automation — by technical specification
Irrigation Pump Feed10 m³/⁠h
Passport Fan Group1 pcs. × 14 500–18 000 m³/⁠h
Electric motor power of one main pump2,2 kW
Power of electric motor of irrigation pump2,2 kW
Power of electric motor of one fan1,1 kW
Heat exchanger connectionG2
Attachment of irrigation systemG½
Main Pump Pressure TubeG2
Power supply380 V, 3 phase, N and PE; 50 Hz
Working hoursContinual
Ambient temperature for standard designFrom +5 up to +30 °C
Housing materialGalvanized steel, powder coating
Material of heat exchanger and wetted parts of own manufactureStainless Steel AISI 304
Nominal service life in compliance with operational documentation10 years
Guarantee of own production equipment18 months; terms by contract and specification
ManufacturingUralInduktor, Astana, Kazakhstan

УИГ-10Т is preliminarily selected by the induction furnace power and confirmed by the total heat release of all liquid-cooled units. The value of 50 000 kcal/h is a characteristic of the size and has been confirmed by operation at existing melting sites. The operating mode of a specific site is checked against flow rate, temperatures, coolant composition, load schedule and installation conditions.

Electric power УИГ-10Т: 5,5 kW in normal mode and 7,7 kW as much as possible for preliminary calculation of the feed input. The standard value includes one circulation pump, irrigation pump and fan group. The maximum takes into account the short-term joint inclusion of the working and backup pumps at the initial filling and removal of air; cables, switching and protection are finally selected according to the electrical scheme of a particular execution.

In the standard scheme, one circulation pump works, the second is in reserve. Switching is performed by the operator with the translation of the corresponding shut-off valves. Automatic reserve input with sensors, executive fittings and locks is available according to the specifications.

The compact two-block layout of the УИГ-10Т is convenient for the existing small section: the sum of the overall areas of the heat exchange and pump-control units is 2,91 m². This is the area of the blocks themselves without service passages, ducts, pipelines and installation zones; the final placement is checked according to the plan of the room.

How a closed two-circuit circuit works

The heat carrier of the induction unit moves inside the closed technological circuit and passes through the cooling tower heat exchanger. Outside, the heat exchange surface is cooled by air flow, and in the prescribed mode - by water of the external irrigation circuit. These liquids do not mix, so the water circulating through the water-cooled kiln nodes does not come in contact with the air and irrigation water.

The УИГ-10Т heat exchanger and wetted parts are made of AISI 304 stainless steel. The body is made of galvanized steel with powder coating. Connections, pumping group, sensors, fittings and execution of the cabinet are consistent with the hydraulic scheme of the object.

Preliminary and final selection - what is the difference

УИГ-10Т can be preliminarily considered for 50–100 kg furnace power up to 100 kW. Such a choice allows you to determine the approximate size and start the layout of the system, but is not the final guarantee of the required temperature regime.

The final selection is made for the actual operating conditions. The engineer checks the maximum heat dissipation, supply and return water temperatures, flow rate, pressure, pipeline resistance, site climate and necessary reserve. If the load is close to the УИГ-10Т limit or the maximum mode is maintained for a long time, the neighboring model or individual execution is included in the calculation.

What to send for calculation

For engineering selection, you need:

  • passport of the induction furnace, converter and other cooled units;
  • Nominal and most severe emissions, if specified by the manufacturer;
  • the required water temperature before the consumer and the permissible temperature after it;
  • flow rate, operating pressure and composition of the coolant;
  • scheme of the route with diameters, lengths and height differences;
  • number of shifts, duration of maximum load, city and place of installation of cooling tower;
  • requirements for the backup pump, signaling and signal exchange with the ICS TP, if they are provided by the project.

If the passport heat dissipation is unknown, it can be clarified by the power balance or by the measured flow and temperature difference. The pressure of the pumping group is determined taking into account the pressure losses in the most unfavorable branch.

Pressing, commissioning and service

УИГ-10Т collectors are checked for pressurization at 10 atm pressure. Before shipment, the assembled system is pressurized at 6 atm. For the site, the winter mode, the composition of the coolant, the requirements for connection and the placement of equipment are separately agreed. These values refer to factory tests for leakproofness and are not working pressure; the permissible pressure is set according to the passport of a specific execution and project documentation.

UralInduktor’s own team performs commissioning and commissioning of the system in Kazakhstan and CIS countries. For maintenance, pumps, fans, nozzles, filters, valves, seals, RTI and automation modules are supplied; the presence of the position is confirmed by the actual configuration of the installation.

Accommodation УИГ-10Т on a small plot

For УИГ-10Т, we design not a separate heat exchange unit, but a workable circuit of a compact melting area with a 50–100 kg furnace: check the thermal balance, flow and pressure, the most unfavorable branch, the quality of the coolant, the reservation algorithm, the emergency signals and the place of service.

After the conclusion of the contract at the request of the customer, we place УИГ-10Т free of charge on the provided workshop plan, specify the service areas and parameters of the applicable communications. We also provide recommended sketches of the foundation and site preparation tasks. According to the agreed volume, we can perform survey, construction work, installation of pipelines and electrical connections, installation of equipment, commissioning, training and commissioning of the system; the boundaries of the work are fixed in the specification.

Availability, warranty and service of УИГ-10Т

УИГ-10Т-УИГ-120Т is produced serially, and a part of the size is usually stored in a warehouse. The actual availability, completeness and duration are confirmed in the proposal at the date of the request. The warranty for own-made equipment is 18 months. Diagnostics, contour audit, repair, upgrading and supply of components are available. Gross Metal Engineering also provides diagnostics, repairs and upgrading of cooling systems for domestic and foreign producers. On the basis of the audit, the applicant receives a written technical opinion; the service can be ordered separately and the work performed is guaranteed under the contract.

Check the applicability of УИГ-10Т

Send your oven passport, existing cooling scheme and installation city. The technical proposal will determine the appropriate size, the calculated thermal mode, the flow and pressure of the pumping group, the composition of the delivery, the necessary modifications, the requirements for connection, the production period and the individually calculated cost. If the initial data show that the УИГ-10Т will not provide the required mode or has excess power, a different model of the series will be offered.

Get calculation УИГ-10Т →

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.