Induction furnace УИ-2Т-1600 for steel and cast iron, 2 t
- Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
- Melting of steel and cast iron — weight up to 2000 kg per cycle
- 18 months warranty and efficiency up to 95 % own production
Description
УИ-2Т-1600 is a thyristor crucible furnace for open melting of steel and cast iron. The rated capacity is 2 000 kg for steel/cast iron, the TFC power is 1200 kW, and the typical operating frequency is 0,5 kHz. The model is considered for medium-sized foundry shops with regular output.
mass of one melting — 2 000 kg in steel / iron
power section — 1600 kW; determined by the project; frequency 50 Hz
metal drain - hydraulic
design scenario - industrial melting of steel and cast iron in batches according to 2 t; reserve melting unit can be ordered separately
We assemble the TFC, capacitor bank, and water-cooled cables for the УИ-2Т-1600 ourselves in Kazakhstan; warranty — 18 months.
What the УИ-2Т-1600 furnace is suitable for
The two-ton furnace is intended for production facilities for which tapping of up to 2 t per melt is important and which are ready to provide the corresponding charging, ladle, and electrical infrastructure. The standard power of 1 600 kW can be changed per the technical specification if the calculation requires a different cycle time.Technical specifications
| Model | УИ-2Т-1600 |
|---|---|
| Nominal weight of one smelter for steel/iron, kg | 2 000 |
| Rated power frequency converter, kW | 1 600 |
| Lower specific flow reference | from 550 kW·h/t for cast iron; from 620 kW·h/t for steel |
| Power supply and frequency | voltage is defined by the project; 50 Hz |
| Calculated current and accepted stock to estimate the supply line | is determined after the choice of the design voltage and the power input scheme; in the subsequent calculation, the 10 % current reserve is applied |
| Estimated total copper cross-section reference point per phase up to 30 m | УИ-2Т-1600; TFC 1 600 kW; network voltage determined by the project; 50 Hz: per the project; the numerical cross-section is not published until the voltage is approved |
| Water-cooled current supply internal HF-circuit | Not a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. The number, cross-section and length are determined by calculation and specification; for small and medium capacities, the standard is the execution of a 2 cable on each of the two connections, for large complexes the number of parallel cables increases |
| Inductor circuit voltage | defined by the project |
| Operating frequency, kHz | standard 0,5; other - by calculation and agreement |
| Smelting materials | steel, cast iron |
| The body of the melting unit | Steel Welded With Magnetic Wires |
| Tilting mechanism | Hydraulic |
| Configuration of the complex | Base: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option |
| Revolving Cooling System | calculated and indicated by a separate position |
| Warranty | 18 months |
The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.
For УИ-2Т-1200, value from 550 kW·h/t for cast iron; from 620 kW·h/t for steel is the lower engineering benchmark for prepared furnace charge and sustainable cycle, not warranty. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.
Engineering rationale of the УИ-2Т-1600 model
At the same power as the УИ-1.5Т-1600, the two-ton version prioritizes the mass of a single melt rather than specific power. Possible options, including 1 600 kW, are assigned only after checking the network, the full cycle, and the cooling.
Below it in the line is the УИ-1.5Т-1600 (1 500 kg, 1600 kW), above it — the УИ-3Т-2400 (3 000 kg, 2400 kW). The comparison is made by the mass of a single tap, the full cycle time, the available power, and the infrastructure cost.
The nominal value of 2 000 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.
As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.
Power supply and cooling
For a 1600 kW TFC, the supply voltage and the inductor circuit voltage are determined by the project; the supply frequency is 50 Hz, and the typical operating frequency is 0,5 kHz. The power input, transformer, switching, and network quality are checked before the connection specification is issued. The calculated specific power relative to the rated capacity is 600 kW/t; this is a comparative, not a guaranteed, productivity indicator. A different operating frequency is possible by agreement after an engineering calculation of the converter, oscillating circuit, inductor, crucible, and stirring mode.
The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.
For a preliminary assessment of the supply line from the customer's distribution device or secondary wrapping of the transformer to the inlet of УИ-2Т-1200 at a track length not exceeding 30 m: determined after selection of the design voltage and power input diagram; 10 per cent current reserve; for the project; the numerical section before approval of voltage shall not be published. Calculation methodology: P / (1,732 × U × 0,93), then stock 10 per cent by current; for the referenced total copper a calculated density of not more than 3 A/mm² is accepted. The 0,93 coefficient is the pre-estimation assumption; the actual RAC and power coefficient frequency converter need to be documented. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. The stress of this modification is determined by the project. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.
For the power design of the УИ-2Т-1600, the short-circuit currents, the power supply category, the converter transformer diagram, and the permissible harmonic level are required. The total connected load of the site additionally includes cooling, hydraulics, fume extraction, and mechanization.
Metallurgical constraints
Electrodynamic mixing equalizes the temperature of the bath, but the order of entry of ferroalloys, acidification and aging are specified by the melting card. The oven does not compensate for wet or contaminated furnace charge.
Operation with a reduced capacity on the УИ-2Т-1600 is permitted only after checking the bath level, electrical matching, and stirring mode. An arbitrary underloaded state is not accepted as normal operation.
Lining and consumables
For the УИ-2Т-1600, the lining cannot be chosen solely by the model designation or the capacity. For cast iron, an acidic quartzite dry ramming mix or a neutral aluminosilicate alternative is often considered; for carbon and low-alloy steel — a neutral high-alumina spinel-forming mix. High-alloy grades and basic slag may require a magnesia system.
UralInduktor can pick up and put the kit under the agreed steel/cast iron mode: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.
Supply scope and boundaries
The final configuration of the УИ-2Т-1600 is fixed by the specification. The basic operating scheme of the thyristor system: TFC — capacitor bank — one connected melting unit. The basic supply includes one melting unit. For small and medium power ratings, four water-cooled cables of the internal high-frequency circuit are typically used: two between the TFC and the bank and two between the bank and the melting unit. In high-power and multi-pulse systems, their number, cross-section, and length are determined by calculation. A second melting unit is offered as a recommended spare and a separate option. Simultaneous operation of two units from one TFC is not provided for; switching is performed with the voltage removed according to the established procedure. The mains input up to the TFC is a separate three-phase line L1, L2, L3 with PE and is not part of the water-cooled connections. Cooling, transformer, fume extraction, foundation, installation, and commissioning are listed in separate lines.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
check the network is defined by the project; frequency 50 Hz and power reserve taking into account auxiliary systems;
specify a recirculating cooling circuit, flow monitoring, and an emergency reserve for the УИ-2Т-1600;
agree on the crucible or lining, the loading method, the ladle, and local fume extraction for the УИ-2Т-1600;
fix the discharge: hydraulic;
define the scope of the PLC, archiving, energy metering, and exchange with the process control system for the УИ-2Т-1600;
Manufacturing, commissioning and service
The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.
Thyristor installations are in production at all times; the serial execution of УИ-2Т-1200 starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.
Information to include in your request
To specify УИ-2Т-1200, provide the steel and cast iron grades, melt mass of 2 000 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.
