UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 6
Own production own production in Kazakhstan

УИ-1.5Т-1200 Induction Furnace for Steel and Iron on 1,5 t

Availability and lead time — in the proposal as of the date of requestPrice on request
1 500 kg
Smelting weight, steel/iron
1 200 kW
Rated power of the thyristor frequency converter
1200 / 2400 V
Inductor voltage
gearbox or hydraulic drive
Tilting mechanism
  • Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
  • Melting of steel and cast iron — weight up to 1500 kg per cycle
  • 18 months warranty and efficiency up to 95 % own production

Description

УИ-1.5Т-1200 is a thyristor crucible furnace for open smelting of steel and cast iron. Nominal output is 1 500 kg in steel/cast, frequency converter power is 1200 kW, and typical operating frequency is 1 kHz. The model is considered for medium foundries with regular release.

mass of one melting — 1 500 kg in steel / iron

power part - 1200 kW; 380 or 660 V; 50 Hz - according to the agreed scheme

metal drain - gear or hydraulic

design scenario - an industrial site with a single issue of 1,5 t, where you need to coordinate the rate of melting with the transformer and pouring

Frequency converter, capacitor battery and water-cooled cables for УИ-1.5Т-1200 independently assemble in Kazakhstan; warranty — 18 months.

What is УИ-1.5Т-1200 furnace suitable for

The model on 1,5 t is suitable for areas with regular large fill, where 1 t is no longer enough, and two-ton output is excessive for ladle or molds. The project checks the loading equipment, the route of the liquid metal and the ability to take all the melting without prolonged exposure.

Technical specifications

ModelУИ-1.5Т-1200
Nominal weight of one smelter for steel/iron, kg1 500
Rated power frequency converter, kW1 200
Lower specific flow referencefrom 550 kW·h/t for cast iron; from 620 kW·h/t for steel
Voltage and frequency of the supply network380 or 660 V; 50 Hz is for execution
Calculated current and accepted stock to estimate the supply line380 V: current ≈ 1 961 A, 10 % ≈ 2 157 A; 660 V: current ≈ 1 129 A, 10 % ≈ 1 242 A
Estimated total copper cross-section reference point per phase up to 30 mУИ-1.5Т-1200; frequency converter 1 200 kW; network 380 or 660 V; 50 Hz - execution: 380 V and 660 V: no numerical cross-section reference is published; cables or busbars are calculated for the selected execution
Water-cooled current supply internal HF-circuitNot a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. Reference reference for 660 V / 2400 circuit In: frequency converter - capacitor battery: 2 cable by 220 mm²; capacitor battery - melting unit: 2 cable by 450 mm². Finally - according to the calculation and specification
Inductor voltage, B1200 / 2400
Operating frequency, kHzstandard 1; other - by calculation and agreement
Smelting materialssteel, cast iron
The body of the melting unitsteel welded; magnetic conductors - according to performance
Tilting mechanismgearbox or hydraulic drive
Configuration of the complexBase: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option
Revolving Cooling Systemcalculated and indicated by a separate position
Warranty18 months

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

For УИ-1.5Т-1200, value from 550 kW·h/t for cast iron; from 620 kW·h/t for steel is the lower engineering benchmark for prepared furnace charge and sustainable cycle, not warranty. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.

Engineering sense of the model УИ-1.5Т-1200

УИ-1.5Т-1200 and УИ-2Т-1200 use the same frequency converter, but different bath weight. The 1,5 t variant is chosen for smaller output and higher power specificity; the actual cycle advantage is confirmed by calculation.

Below in the line is УИ-1Т-800 (1 000 kg, 800 kW), above is УИ-2Т-1200 (2 000 kg, 1200 kW). The comparison is made by the mass of a single issue, full stroke, available power and the cost of infrastructure.

The nominal value of 1 500 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.

As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.

Power supply and cooling

Frequency converter 1200 kW is powered by network 380 or 660 V, 50 Hz; execution and connection scheme are consistent with the project. The typical operating frequency is 1 kHz, the voltage of the circuit of the inductor is 1200 or 2400 in execution. Power input, transformer, switching, and network quality are checked before a connection task is released. The rated power relative to the rated garden is 800 kW/t; this is a comparative rather than a guaranteed performance measure. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet УИ-1.5Т-1200 at the length of the track not exceeding 30 m: 380 V: Calculating current ≈ 1 961 Ah, with a supply. 10 % ≈ 2 157 A; 660 V: Calculating current ≈ 1 129 Ah, with a supply. 10 % ≈ 1 242 A; 380 V and 660 V: The numerical section orientation shall not be published; cables or tyre lines shall be calculated for the selected performance Calculation methodology: P /1,732 × U × 0,93), then stock 10 % by current; for the referenced total copper the calculated density is not more than 3 A/mm². Ratio 0,93 - Prefeasibility; actual IAQ and coefficient power frequency converter It is necessary to confirm its documentation. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. Two options are shown in the card; one agreed entry is actually applied. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.

For the УИ-1.5Т-1200 power project, short circuit currents, a power supply category, a transform transformer circuit, and an acceptable level of harmonics are needed. The total attached load of the site further includes cooling, hydraulics, drawing and mechanization.

Metallurgical constraints

Acid lining is not suitable for every slag regime; alloyed and special steels may require a basic or neutral system. The decision is made by the metallurgist on the composition of metal and slag.

Work with a reduced garden on the УИ-1.5Т-1200 is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.

Lining and consumables

For УИ-1.5Т-1200 liner can not be selected only by the model designation or the weight of the seat. For cast iron, an acidic quartzite dry mass or neutral aluminosilicate alternative is often considered; for carbon and low-alloy steel, a neutral high-glue spinel-forming one. High-alloy grades and basic slag may require a magnesia system.

UralInduktor can pick up and put the kit under the agreed steel/cast iron mode: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.

Supply scope and boundaries

The final composition of the УИ-1.5Т-1200 is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

calculate the full cycle of УИ-1.5Т-1200: loading, melting, delivery of the composition, release and preparation;

check the network 380 or 660 V; 50 Hz - according to the agreed scheme and power reserve, taking into account auxiliary systems;

assign for УИ-1.5Т-1200 a reverse cooling scheme, flow control and emergency stock;

agree for УИ-1.5Т-1200 crucible or lining, loading method, ladle and local hood;

fix the discharge performance: gear or hydraulic;

Manufacturing, commissioning and service

The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.

Thyristor installations are in production at all times; the serial execution of УИ-1.5Т-1200 starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.

Information to include in your request

To specify УИ-1.5Т-1200, provide the steel and cast iron grades, melt mass of 1 500 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.