УИ-2.5Т-1200А Induction Furnace for Aluminum and Silamine on 2,5 t
- Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
- Melting of aluminum and aluminum alloys weight up to 2500 kg per cycle
- 18 months warranty and efficiency up to 95 % own production
Description
УИ-2.5Т-1200А is a thyristor crucible furnace for open smelting of aluminum. The nominal rating is 2 500 kg in aluminum, the frequency converter is 1200 kW, and the typical operating frequency is 0,5 kHz. The model is considered for large-scale foundry production.
weight of one smelter 2 500 kg for aluminum
Power part 1200 kW; 660/50 V/Hz
metal drain - hydraulic
design scenario - a large aluminum section with a 2,5 t garden, loading mechanization and throttle control
Frequency converter, capacitor battery and water-cooled cables for УИ-2.5Т-1200А independently assemble in Kazakhstan; warranty — 18 months.
What is УИ-2.5Т-1200А furnace suitable for
The model on the 2,5 t is suitable for a section that requires an intermediate yield between two and three tons without crushing the batch into additional smelters. Before ordering, check the crane, ladle, loading machine and melt treatment equipment.
Technical specifications
| Model | УИ-2.5Т-1200А |
|---|---|
| Nominal weight of one aluminum smelter, kg | 2 500 |
| Rated power frequency converter, kW | 1 200 |
| Lower specific flow reference | from 500 kW·h/t for aluminum and silumina |
| Network voltage and frequency, V/Hz | 660 / 50 |
| Calculated current and accepted stock to estimate the supply line | calculated current ≈ 1 129 A at 660 V; with stock 10 % ≈ 1 242 A |
| Estimated total copper cross-section reference point per phase up to 30 m | УИ-2.5Т-1200А; frequency converter 1 200 kW; network 660 / 50: the numerical reference of the total copper section is not published: the number of cables, the cross section of each vein or bus line determines the designer of the customer according to the actual scheme |
| Water-cooled current supply internal HF-circuit | Not a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. Reference reference: frequency converter - capacitor battery: 2 cable by 220 mm²; capacitor battery - melting unit: 2 cable by 450 mm². Finally - according to the calculation and specification |
| Inductor voltage, B | 2400 |
| Operating frequency, kHz | standard 0,5; other - by calculation and agreement |
| Smelting materials | aluminum and aluminum alloys |
| The body of the melting unit | Steel Welded With Magnetic Wires |
| Tilting mechanism | Hydraulic |
| Configuration of the complex | Base: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option |
| Revolving Cooling System | calculated and indicated by a separate position |
| Warranty | 18 months |
The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.
For УИ-2.5Т-1200А, the value from 500 kW·h/t for aluminum and silumin is the lower engineering benchmark for a prepared furnace charge and a sustainable cycle, not a guarantee. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.
Engineering sense of the model УИ-2.5Т-1200А
УИ-2.5Т-1200А has a separate combination of mass and power, which is not in two- and three-ton cards. Its purpose is to get exactly into the technological batch; the installation "with a margin" can increase endurance, throttle and loss.
Below in the line is УИ-2Т-900А (2 000 kg, 900 kW), above is УИ-3Т-1500А (3 000 kg, 1500 kW). The comparison is made by the mass of a single issue, full stroke, available power and the cost of infrastructure.
The nominal value of 2 500 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.
As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.
Power supply and cooling
The rated power relative to the rated garden is 480 kW/t; this is a comparative rather than a guaranteed performance measure. frequency converter 1200 kW is powered by 660 / 50 V/Hz; standard operating frequency is 0,5 kHz, voltage circuit inductor is 2400 V. Power input, transformer, switching, and network quality are checked before a connection task is released. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.
The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.
For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet УИ-2.5Т-1200А at the length of the track not exceeding 30 : Ceiling current ≈ 1 129 And at the 660 V; with reserve 10 % ≈ 1 242 A; the numerical reference point of the aggregate copper section is not published: the number of cables, the section of each housing or tyre line determines the designer of the customer according to the actual pattern. Calculation methodology: P /1,732 × U × 0,93), then stock 10 % by current; for the referenced total copper the calculated density is not more than 3 A/mm². Ratio 0,93 - Prefeasibility; actual IAQ and coefficient power frequency converter It is necessary to confirm its documentation. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.
For the УИ-2.5Т-1200А power project, short circuit currents, a power supply category, a transform transformer circuit, and an acceptable level of harmonics are needed. The total attached load of the site further includes cooling, hydraulics, drawing and mechanization.
Metallurgical constraints
Oxide film can not be intensively mixed into the bath. Temperature, fluctuation, degassing and modification are prescribed according to the brand of the alloy and the casting requirements.
Work with a reduced garden on the УИ-2.5Т-1200А is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.
Lining and consumables
For УИ-2.5Т-1200А liner can not be selected only by the model designation or the weight of the seat. For aluminum alloys, a high clay-earth dry mass with an anti-wetting additive is considered. The composition is specified by the alloy brand, fluxes, temperature, aging and cleaning method.
UralInduktor can pick up and put the kit under the agreed mode of aluminum: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.
Supply scope and boundaries
The final composition of the УИ-2.5Т-1200А is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
check the network 660 / 50 V/Hz and power reserve taking into account auxiliary systems;
assign for УИ-2.5Т-1200А a reverse cooling scheme, flow control and emergency stock;
agree for УИ-2.5Т-1200А crucible or lining, loading method, ladle and local hood;
fix the discharge: hydraulic;
determine for УИ-2.5Т-1200А the amount of PLC, archiving, energy metering and exchange with ICS;
Manufacturing, commissioning and service
The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.
Thyristor installations are in production at all times; the serial execution of УИ-2.5Т-1200А starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.
Information to include in your request
To specify УИ-2.5Т-1200А, provide the aluminium grades, melt mass of 2 500 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.