UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 4
Own production own production in Kazakhstan

УИ-3Т-1500А Induction Furnace for Aluminum and Silamine on 3 t

Availability and lead time — in the proposal as of the date of requestPrice on request
3 000 kg
Smelting weight, aluminum
1 500 kW
Rated power of the thyristor frequency converter
2400 V
Inductor voltage
Hydraulic
Tilting mechanism
  • Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
  • Melting of aluminum and aluminum alloys weight up to 3000 kg per cycle
  • 18 months warranty and efficiency up to 95 % own production

Description

УИ-3Т-1500А is a thyristor crucible furnace for open smelting of aluminum. The nominal rating is 3 000 kg in aluminum, the frequency converter is 1500 kW, and the typical operating frequency is 0,2 kHz. The model is considered for large-scale foundry production.

weight of one smelter 3 000 kg for aluminum

Power part 1500 kW; 660/50 V/Hz

metal drain - hydraulic

design scenario - a large aluminum section with a 3 t garden, loading mechanization and throttle control

Frequency converter, capacitor battery and water-cooled cables for УИ-3Т-1500А independently assemble in Kazakhstan; warranty — 18 months.

What is УИ-3Т-1500А furnace suitable for

The three-ton version is designed for a large-scale aluminum section with mechanized loading, processing and pouring. The mass of one melt must correspond to the actual consumption of the molding lines so that the metal does not expect release in the bath.

Technical specifications

ModelУИ-3Т-1500А
Nominal weight of one aluminum smelter, kg3 000
Rated power frequency converter, kW1 500
Lower specific flow referencefrom 500 kW·h/t for aluminum and silumina
Network voltage and frequency, V/Hz660 / 50
Calculated current and accepted stock to estimate the supply linecalculated current ≈ 1 411 A at 660 V; with stock 10 % ≈ 1 553 A
Estimated total copper cross-section reference point per phase up to 30 mУИ-3Т-1500А; frequency converter 1 500 kW; network 660 / 50: the numerical reference of the total copper section is not published: the number of cables, the cross section of each vein or bus line determines the designer of the customer according to the actual scheme
Water-cooled current supply internal HF-circuitNot a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. The number, cross-section and length are determined by calculation and specification; for small and medium capacities, the standard is the execution of a 2 cable on each of the two connections, for large complexes the number of parallel cables increases
Inductor voltage, B2400
Operating frequency, kHzstandard 0,2; other - by calculation and agreement
Smelting materialsaluminum and aluminum alloys
The body of the melting unitSteel Welded With Magnetic Wires
Tilting mechanismHydraulic
Configuration of the complexBase: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option
Revolving Cooling Systemcalculated and indicated by a separate position
Warranty18 months

The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.

For УИ-3Т-1500А, the value from 500 kW·h/t for aluminum and silumin is the lower engineering benchmark for a prepared furnace charge and a sustainable cycle, not a guarantee. Actual consumption depends on cold or hot start, humidity, largeness and density of the furnace charge, overheating, exposure and organization of the operator.

Engineering sense of the model УИ-3Т-1500А

Despite the coincidence of 3 t/1 500 kW with copper УИ-3Т-1500М, the aluminum version has a different operating frequency 0,2 kHz and is designed for a different metallurgical mode. Therefore, combining the performance by one mass and power is technically incorrect: frequency, inductor and mode are selected by metal.

The nearest smaller model is the УИ-2.5Т-1200А: 2 500 kg and 1200 kW. The older version is chosen according to the production program, and not for the sake of a formal stock of capacity.

The nominal value of 3 000 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.

As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.

Power supply and cooling

Frequency converter 1500 kW is powered by 660 / 50 V/Hz; standard operating frequency is 0,2 kHz, voltage circuit inductor is 2400 V. Power input, transformer, switching, and network quality are checked before a connection task is released. The rated power relative to the rated garden is 500 kW/t; this is a comparative rather than a guaranteed performance measure. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.

The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.

For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet УИ-3Т-1500А at the length of the track not exceeding 30 : Ceiling current ≈ 1 411 And at the 660 V; with reserve 10 % ≈ 1 553 A; the numerical reference point of the aggregate copper section is not published: the number of cables, the section of each housing or tyre line determines the designer of the customer according to the actual pattern. Calculation methodology: P /1,732 × U × 0,93), then stock 10 % by current; for the referenced total copper the calculated density is not more than 3 A/mm². Ratio 0,93 - Prefeasibility; actual IAQ and coefficient power frequency converter It is necessary to confirm its documentation. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.

For the УИ-3Т-1500А power project, short circuit currents, a power supply category, a transform transformer circuit, and an acceptable level of harmonics are needed. The total attached load of the site further includes cooling, hydraulics, drawing and mechanization.

Metallurgical constraints

Stitching and thin-walled scrap occupy a large volume and are quickly oxidized. For them, the packaging, the order of the undercoating and possible metal losses are checked.

Work with a reduced garden on the УИ-3Т-1500А is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.

Lining and consumables

For УИ-3Т-1500А liner can not be selected only by the model designation or the weight of the seat. For aluminum alloys, a high clay-earth dry mass with an anti-wetting additive is considered. The composition is specified by the alloy brand, fluxes, temperature, aging and cleaning method.

UralInduktor can pick up and put the kit under the agreed mode of aluminum: working mass, coil protection, separation layer, top and toe materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.

Supply scope and boundaries

The final composition of the УИ-3Т-1500А is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.

After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.

assign for УИ-3Т-1500А a reverse cooling scheme, flow control and emergency stock;

agree for УИ-3Т-1500А crucible or lining, loading method, ladle and local hood;

fix the discharge: hydraulic;

determine for УИ-3Т-1500А the amount of PLC, archiving, energy metering and exchange with ICS;

confirm the metal and the actual mass of issue for УИ-3Т-1500А;

Manufacturing, commissioning and service

The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.

Thyristor installations are in production at all times; the serial execution of УИ-3Т-1500А starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.

Information to include in your request

To specify УИ-3Т-1500А, provide the aluminium grades, melt mass of 3 000 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.