Selection conditions
For a section with a prepared gas supply. The materials present natural and liquefied gas; the specific gas composition, pressure and consumption are checked for the selected version.
- Vertical units with a lid and a burner.
- Hydraulic lifting-and-swivel version up to 10 t.
- A separate layout for a 10 t stopper ladle.
Drying a new lining and heating the ladle before use require different regimes. The temperature, holding times and heating rate are agreed with the refractory manufacturer and the plant's process engineer. The catalog temperature is not a universal drying regime.
Supply, documents and maintenance
Stands are supplied to order with a lead time from 30 days, with a ready-made soft lid lining. The kit includes a passport and an operating manual, without an electrical diagram. Installation, commissioning and training can be ordered separately.
Warranty for the burner and the electrical part of the stand — 12 months. Lining and heating elements are consumables and are not covered by the warranty.