UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes

Example of a design. We check the layout of the selected model against the ladle drawing.

Gas stand for ladles of 20-22 t

from 30 days · made to orderPrice on request
20-22 т
Ladle capacity
1100 °C
Heating temperature
100-150 м³/ч
Gas consumption
Vertical
Configuration
  • Made-to-order supply — from 30 days
  • Selection based on the ladle drawing, lining and heating mode
  • 12-month warranty on the burner and the electrical part

Main characteristics

Ladle capacity20-22 т
ConfigurationVertical
Heating temperature per specification1100 °C
Natural gas consumption per specification100-150 м³/ч
Fan power7,5 kW
Lifting mechanism power4 kW
Power supply380 V, 50 Hz

Data for preliminary selection. Operating parameters and the scope of supply are fixed in the order specification.

The fan and lifting powers are specified separately. For connection, the gas supply parameters and the total electrical load of the selected set are needed.

Complete set

  • Metal structure, lid and lifting mechanism
  • Bro2000 burner and fan per specification
  • Control cabinet, measuring instruments and shut-off valves

Specify the spare parts, connections and documentation in your request.

What is needed for selection

Provide the internal dimensions of the ladle, the mouth dimensions, and the lining material and thickness. State the task — drying a new lining or preheating — and the available energy sources.

Drying a new lining and heating the ladle before use require different regimes. The temperature, holding times and heating rate are agreed with the refractory manufacturer and the plant's process engineer. The catalog temperature is not a universal drying regime.

Delivery set and service

The stand is supplied to order from 30 days, with a ready-made soft lining of the lid. Documents — a technical passport and an operating manual. The electrical diagram is not included in the standard set.

Warranty — 12 months on the burner and the electrical part. Lining and heating elements are consumables excluded from warranty coverage. Rules for the start of the warranty period.

Installation, commissioning and staff training are available. We supply spare parts after the warranty expires as well; items in stock are shipped on the next business day after payment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB