UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes

Example of a design. We check the layout of the selected model against the ladle drawing.

Lifting and tilting gas stand for up to 10 t

from 30 days · made to orderPrice on request
10 t
Ladle capacity
700-1000 °C
Heating temperature
  • Made-to-order supply — from 30 days
  • Selection based on the ladle drawing, lining and heating mode
  • 12-month warranty on the burner and the electrical part

Main characteristics

Maximum ladle capacity per description10 t
LiftingHydraulic
Rotate180°
FuelNatural or liquefied gas, depending on the version
Heating range per specification700-1000 °C
Main fan power5,5 kW
ManagementManual and automatic

Data for preliminary selection. Operating parameters and the scope of supply are fixed in the order specification.

Gas consumption and working pressure are determined during selection. Check the free swivel zone of the lid and both its positions: working and retracted.

Complete set

  • Supporting steel structure, lid and hydraulic cylinder
  • Burner, gas line and air supply
  • Control cabinet with temperature measurement and interlocks

Specify the spare parts, connections and documentation in your request.

What is needed for selection

Provide the internal dimensions of the ladle, the mouth dimensions, and the lining material and thickness. State the task — drying a new lining or preheating — and the available energy sources.

Drying a new lining and heating the ladle before use require different regimes. The temperature, holding times and heating rate are agreed with the refractory manufacturer and the plant's process engineer. The catalog temperature is not a universal drying regime.

Delivery set and service

The stand is supplied to order from 30 days, with a ready-made soft lining of the lid. Documents — a technical passport and an operating manual. The electrical diagram is not included in the standard set.

Warranty — 12 months on the burner and the electrical part. Lining and heating elements are consumables excluded from warranty coverage. Rules for the start of the warranty period.

Installation, commissioning and staff training are available. We supply spare parts after the warranty expires as well; items in stock are shipped on the next business day after payment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB