UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes

Pulse transformer boards for thyristor transducers

The board of pulse transformers transmits control impulses to thyristors as part of the control system provided by the circuit. Its execution should correspond to the number of channels, electrical parameters and the connection of a specific converter.

Section Positions

1 position

Impulse boards: 1 position in the catalog. Execution and completeness are specified during selection.

1 position

Background

Impulse board and main control board

The main control board sets the moments of the control pulses. Pulse transformers transmit them in the control electrode circuit and provide galvanic isolation between the respective circuits. In some designs, both nodes are placed on a shared board.

What to CompareWhat to send for verification
Designation and versionBoard marking, revision number, designations on transformers.
Control channelsNumber, purpose, connection with thyristors according to the scheme.
Electrical parametersPower supply, input and output pulse parameters, polarity.
ConnectionPictures of connectors, marking of wires, pining.
MechanicsSizes of board, mounting points, available place.

Why an outwardly similar fee may not suit

Matching the size and number of transformers does not guarantee the same conversion rates, pinning and insulation parameters. A fee with another audit may require a different connection scheme. These differences need to be identified before supply is agreed.

For the output pulse, the amplitude of the current of the control electrode, duration, buildup time and polarity are checked. These parameters must correspond to the thyristor and the mode of its inclusion. The nominal current of the power chain is indicated separately.

If the labeling fee is not read

  • Take a general picture of the installed node and readable photos of both sides of the removed fee, if they are already available from the maintenance staff.
  • Add large pictures of connectors and transformers.
  • Specify the model of the converter, the known version of the scheme and the place of payment in the cabinet.
  • Attach the documents to the adjacent control board and thyristors, if they are known.

For the initial application, use the available photos and diagrams. The removal of the fee and electrical checks are performed by the maintenance personnel on the documentation of the equipment.

Completeness and verification after replacement

The proposal indicates whether the fee is collected or a separate agreed element. The presence of cables, connectors and fasteners is clearly fixed. The plan for checking the converter after replacement is determined by its documentation and the agreed scope of technical work.

Questions and answers

Can I choose the number of transformers?

This is one of the signs, but you also need electrical parameters, channel circuitry and pining.

MPU-2FK is a pulse board?

In the nomenclature of the site MPU-2FK is allocated as a control board. For a specific cabinet, the role of the board should be checked with the scheme.

What to send for selection without a passport?

Photo of both sides, marking of connectors and transformers, the converter model and the available connection scheme.

Is the fee universal for all thyristors?

Compatibility depends on the requirements of thyristors and the scheme of formation of impulses. When selecting, compare the electrical parameters and the scheme of channels.

Pick up the impulse fee

Send photos, converter designation and node schematic. Specify the required amount and the desired period. The execution of the fee and the delivery set are agreed before the order.

Selection: impulse boards

The board of pulse transformers transmits control impulses to thyristors as part of the control system provided by the circuit. Its execution should correspond to the number of channels, electrical parameters and the connection of a specific converter.

Help with selection

Send label, photo details and sizes. For details on the drawing, attach a sketch.

Request for selection

Confirm price and configuration

Specify the spare part, model of furnace or converter and quantity. You can attach a photo or drawing.