
Pulse Transformer Board
Separate node marking and number of channels on request
The board of pulse transformers transmits control impulses to thyristors as part of the control system provided by the circuit. Its execution should correspond to the number of channels, electrical parameters and the connection of a specific converter.
Impulse boards: 1 position in the catalog. Execution and completeness are specified during selection.
1 position

Separate node marking and number of channels on request


The main control board sets the moments of the control pulses. Pulse transformers transmit them in the control electrode circuit and provide galvanic isolation between the respective circuits. In some designs, both nodes are placed on a shared board.
| What to Compare | What to send for verification |
|---|---|
| Designation and version | Board marking, revision number, designations on transformers. |
| Control channels | Number, purpose, connection with thyristors according to the scheme. |
| Electrical parameters | Power supply, input and output pulse parameters, polarity. |
| Connection | Pictures of connectors, marking of wires, pining. |
| Mechanics | Sizes of board, mounting points, available place. |
Matching the size and number of transformers does not guarantee the same conversion rates, pinning and insulation parameters. A fee with another audit may require a different connection scheme. These differences need to be identified before supply is agreed.
For the output pulse, the amplitude of the current of the control electrode, duration, buildup time and polarity are checked. These parameters must correspond to the thyristor and the mode of its inclusion. The nominal current of the power chain is indicated separately.
For the initial application, use the available photos and diagrams. The removal of the fee and electrical checks are performed by the maintenance personnel on the documentation of the equipment.
The proposal indicates whether the fee is collected or a separate agreed element. The presence of cables, connectors and fasteners is clearly fixed. The plan for checking the converter after replacement is determined by its documentation and the agreed scope of technical work.
This is one of the signs, but you also need electrical parameters, channel circuitry and pining.
In the nomenclature of the site MPU-2FK is allocated as a control board. For a specific cabinet, the role of the board should be checked with the scheme.
Photo of both sides, marking of connectors and transformers, the converter model and the available connection scheme.
Compatibility depends on the requirements of thyristors and the scheme of formation of impulses. When selecting, compare the electrical parameters and the scheme of channels.
Send photos, converter designation and node schematic. Specify the required amount and the desired period. The execution of the fee and the delivery set are agreed before the order.
The board of pulse transformers transmits control impulses to thyristors as part of the control system provided by the circuit. Its execution should correspond to the number of channels, electrical parameters and the connection of a specific converter.
Send label, photo details and sizes. For details on the drawing, attach a sketch.