UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 5
Own production own production in Kazakhstan

Shot blasting machine for cleaning rolled steel УИД-2300/1200

Availability and lead time — in the proposal as of the date of requestPrice on request
8 pcs.
Number of blasting wheels
2 300 × 1 200 mm
Chamber Window
2 000 × 1 000 mm
Section of detail, max.
1 000
Linear mass, max.
  • Selection of the size for your profile and tonnage 1 Working Day
  • Departure of the engineer for measurements to your site, turnkey site project
  • Warranty of 18 months on equipment of our own production

Description

УИД-2300/1200 handles two-meter wide sheets, frames and long welded sections up to 1 000 mm. When designing, special attention is paid to the stable supply of a large product and the placement of extended roller conveyor in the workshop.

Permissible dimensions 2 000 × 1 000 mm by section; product length — by design

2 300 × 1 200 mm

Maximum 1 000 kg/m on transport system

8 turbines by 11–15 kW; metal feed by 0,5–2,0 m/min

Warranty 18 months, installation works in Kazakhstan and CIS

Technical specifications

Maximum part cross-section (W H), mm2 000 × 1 000
Input and output roller conveyor length, mmby project; typical execution of one side — 12 000
Window size shot blasting chamber (W H), mm2 300 × 1 200
Number of turbines,8
Preliminary lower limit of total installed power, kWnot less than 110 kW; exact value - by configuration*
Maximum linear mass of the part, kg/m1 000
Feed speed, m/min0,5 – 2,0
Throughput dust trap, m³/h21 500 (22 kW)
Voltage/Frequency380 V / 50 Hz
Working hoursautomatic; manual operations - for adjustment
Management systemPLC — standard; touch screen — complete

* The table shows the provisional lower limit of the total installed capacity. The exact total power includes turbines, dust extraction, elevator, screw conveyor, roller conveyor and all auxiliary drives and is fixed in the electrical circuit of the agreed configuration. The basic dust collector is a sleeve cloth, with pulse regeneration; 0,55–0,60 MPa workshop air is required, a separate compressor is not included. exploit-proof execution is calculated separately.

For the УИД-2300/1200 line, the steel shot working mixture is selected together with the roller conveyor speed and the number of turbines. The abrasive is supplied separately; a sample on a typical profile shows the cleaning of edges and shelves, and the need for magnetic separation or vibration transport is determined by waste.

Why choose УИД-2300/1200

The line takes the product up to 2 000 × 1 000 mm by cross section; the length of the product is according to the project through the 2 300 × 1 200 mm chamber. Typical tasks are cleaning a wide sheet, frames, beam assemblies and flat metal structures. The gauge is checked in the transport position, since the rib, flange or mounting loop can become the highest point.

If the design retains the width of 2 000 mm but rises to 1 200 mm, УИД-2300/1400. applies For a flow width of no more than 1 600 mm it is necessary to compare the task with УИД-1900/1200. The comparison is based on the repetitive details and the actual load of the shift.

Wide sheet blanks

Welded frames and flat sections

long beams

Linear mass and long transport

The load on the roller conveyor is limited to 1 000 kg/m. For a 12-meter part, the total mass and its distribution are calculated, especially when one end has already entered the chamber, and the second remains on the feeding section. The reference points shall be free from rocking and lateral displacement.

The length of the transport part is selected along the route of the product. With a shortage of area, breaks, cumulative positions and pairing with the crane are worked out. Rollers, frames and drives can be reinforced by design calculation, if the nomenclature requires more load capacity.

calculation of transient loads at the inlet

roller conveyor under 1 000 kg/m in base version

adaptation of logistics to the workshop plan

Eight turbines for a wide product

The chamber is served by 8 turbines according to 11–15 kW. They operate under adjustable feeding 0,5–2,0 m/min and guide the abrasive to available surfaces from different sides. The turbine consumption elements are the same for the 11 and 15 kW engine variants.

The average flight speed of shot is 80 m/s. In order to obtain Sa 2½ or Sa 3, they set the length of time in the operating zone and select the abrasive on the reference surface. The control details are checked for areas near ribs and welds and then maintain working settings.

cleaning of the scale on the sheet

treatment of welds and adjacent planes

preparation before ground and painting

Dust collector operation and power consumption

Dust collector is designed for 21 500 m³/h with 22 kW power. It removes dust from the chamber; the required performance takes into account eight turbines, the volume of the work area and the processing mode. When entering, specialists check the air mode on the moving parts and perform adjustment.

The confirmed amount of turbine power and dust extraction is 110–142 kW. The total installed power includes, in addition to them, drive rollers, elevator, screw conveyor and other mechanisms. The single total value is calculated after agreement on the entire line scheme.

Manufacturing and assembly are carried out by UralInduktor at its own site. The equipment is adapted to local conditions, the available power supply, and the specified installation location. Depending on the project, the conveying system, protection, and control configuration are modified. The PLC for УИД-2300/1200 is included in the standard configuration; the touchscreen is specified in the УИД-2300/1200 specification.

21 500 m³/h dust air removal

22 kW engine dust collector

calculation of the total load with each drive

Checking with steel shot, installation and commissioning

Before shipment, the equipment works for several hours on parts and steel shot. Control covers roller drive, turbines, dispensers, abrasive return, dust extraction, locking and automatic control. Before shipment, all equipment passes on the territory of the supplier a comprehensive health check under load. Individual crushes inside the body after the run are allowed. By prior agreement, the customer's representative may be present during the inspection in person or observe it by video link; the program and acceptance criteria are determined for a specific order.

Installation supervision is available for the site with the customer's staff or the work of its own team. Departure is possible in Kazakhstan and the CIS. After assembly, commissioning, speed selection under the real surface and practical training of operators with the act are carried out.

working run to the finish color

selection of the format of installation works

setting up the current cleaning at the facility

What can be assigned to one engineering team

Shot blasting machine for cleaning rolled steel УИД-2300/1200 is considered as part of the entire site, and not as an isolated machine. For the roller conveyor line, we connect the working section of the chamber with the speed of transportation, the number of turbines, the length of the input and output roller conveyor and the carrying capacity per meter. The performance of the elevator and separator on steel shot is not given out for the release of processed rolled steel.

For the УИД-2300/1200 line, the layout links the chamber to the entry and exit roller conveyor, the rolled steel route, the foundation and the elevator and filter service location. After the contract, we issue the recommended construction sketches and, upon request, we place a free line on the workshop plan with loads and communications. With a consistently smaller range, compare УИД-2300/1200 with УИД-1900/1200; when working size or load is exceeded, check УИД-2300/1400. Departure for checking marks and cargo traffic is possible under separately agreed conditions.

Warranty and service after commissioning

Warranty for УИД-2300/1200 — 18 months. For the equipment of this design, we diagnose turbines, roller transport, elevator, screw conveyor, separator, filter and automation; if the mode is not achieved, we also check steel shot, loading and technological cycle. As a result of the audit, we issue a written opinion; subsequent repair by Gross Metal Engineering LLP is not required. Initial remote diagnostics and a guarantee for the work performed are provided on agreed contractual terms.

Guarantee service, improvements and financing

УИД-2300/1200 provides a guarantee of 18 months; a longer period is discussed separately. For maintenance, turbine consumables, protective armor and curtains, elements of transport and return systems, filters and parts of electrical equipment are supplied.

The line can be developed together with the production of the customer: strengthen the roller conveyor, change the length of the sections, count the turbines, dust removal or program. The composition of the subject of financing is fixed in the approved specification.

18 months warranty plus consistent extension

support for consumable nodes

Preliminary engineering selection of УИД-2300/1200 and the commercial offer are carried out free of charge - from 1 working day after receiving sufficient initial data; the cost and terms of payment are fixed in the individual offer and contract. The public price on the site is not posted.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.