UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
1 / 5
Own production own production in Kazakhstan

Shot blasting machine for cleaning rolled steel УИД-1900/1200

Availability and lead time — in the proposal as of the date of requestPrice on request
8 pcs.
Number of blasting wheels
1 900 × 1 200 mm
Chamber Window
1 600 × 1 000 mm
Section of detail, max.
1 000
Linear mass, max.
  • Selection of the size for your profile and tonnage 1 Working Day
  • Departure of the engineer for measurements to your site, turnkey site project
  • Warranty of 18 months on equipment of our own production

Description

УИД-1900/1200 is intended for rolled products 1 600 mm wide, up to 1 000 mm high and with a linear mass up to 1 000 kg/m. This model suits heavier, larger profiles that do not fit the lower configuration of the 1900 series.

Working detail 1 600 × 1 000 mm by section; product length — by design

Chamber Pass 1 900 × 1 200 mm

Roller conveyor is designed for 1 000 kg/m

8 turbines and dust extraction 21 500 m³/h

18 months warranty with possibility to agree longer term

Technical specifications

Maximum part cross-section (W H), mm1 600 × 1 000
Input and output roller conveyor length, mmby project; typical execution of one side — 12 000
Window size shot blasting chamber (W H), mm1 900 × 1 200
Number of turbines,8
Preliminary lower limit of total installed power, kWnot less than 110 kW; exact value - by configuration*
Maximum linear mass of the part, kg/m1 000
Feed speed, m/min0,5 – 2,0
Throughput dust trap, m³/h21 500 (22 kW)
Voltage/Frequency380 V / 50 Hz
Working hoursautomatic; manual operations - for adjustment
Management systemPLC — standard; touch screen — complete

* The table shows the provisional lower limit of the total installed capacity. The exact total power includes turbines, dust extraction, elevator, screw conveyor, roller conveyor and all auxiliary drives and is fixed in the electrical circuit of the agreed configuration. The basic dust collector is a sleeve cloth, with pulse regeneration; 0,55–0,60 MPa workshop air is required, a separate compressor is not included. exploit-proof execution is calculated separately.

For the УИД-1900/1200 line, the steel shot working mixture is selected together with the roller conveyor speed and the number of turbines. The abrasive is supplied separately; a sample on a typical profile shows the cleaning of edges and shelves, and the need for magnetic separation or vibration transport is determined by waste.

Why choose УИД-1900/1200

The size of the product is limited to 1 600 × 1 000 mm by section; the length of the product is according to the project, the shot blasting chamber window is 1 900 × 1 200 mm. This size includes beams, a wide profile, frames and welded structures with a pronounced height. The inspection shall be carried out according to the drawing in the position of use, including the projections and the supporting positions.

The length of the input and output roller conveyors is set by the project; the typical version for one side is 12 000 mm. A part can be longer if its cross-section and linear mass fit within the model parameters and the support scheme ensures stable movement without tipping over or running off the rollers.

From УИД-1900/1000 this version differs in the height of the part 1 000 instead of 800 mm and the linear load 1 000 instead of 800 kg/m. If these two reserves are really needed by the main nomenclature, the higher line provides a steady passage without moving to a 2 000 mm-wide chamber.

beams with developed cross-sectional height

Wide heavy profile

Welded constructions in current production

Distribution of 1 000 kg/m on rollers

Weight up to 1 000 kg per linear meter is allowed. To calculate the transporter, this number is not enough: the total length, center of gravity and the actual number of rollers under the product at each phase of the passage are taken into account. Especially carefully considered are short heavy parts and frames with rare support points.

If necessary, change the diameter and pitch of the rollers, drive sections, the length of the entrance and exit. The load-bearing capacity can also be improved according to the requirements of the customer. The project is linked to a crane feed, storage, or a neighboring technology line.

Checking point loads

steady passage of the center of gravity through the chamber

transport according to the individual plan of the site

Technological mode of cleaning

Eight turbines are equipped with 11 or 15 kW engines and use a common range of consumable parts. Roller conveyor moves at 0,5–2,0 m/min speed. The position of the working wheels is chosen so that the streams of steel shot affect the available high profile planes.

At the approximate abrasive speed of 80 m/s, the total purity is determined by the time and correct selection of shot. For Sa 2½ or Sa 3, the surface state, fraction, flow and delivery of the product are consistent. Control treatment helps to adjust the mode without excessive wear of armor and metal.

scale after rolling or welding production

Corrosion before restoration

roughness for a specific coating system

Dust removal and electric load

The 21 500 m³/h has a 22 kW engine. The air flow rate is selected relative to the chamber, eight turbines and the feed mode. When commissioning, dust removal is checked through the fences and parts passage places, then the equipment is configured as a single system.

The power of the turbines together with the dust extraction is 110–142 kW. The full set value is supplemented by roller drives, screw conveyor, elevator and other consumers. The exact amount is indicated according to the approved configuration in order to correctly determine the cable line and protection.

UralInduktor's own site handles assembly, the electrical part, and factory testing. The design is adapted to the climate, shift pattern, and servicing at the customer's facility; the dust collector location and access to the units are agreed according to the layout.

Dust Removal Performance 21 500 m³/h

110–142 kW

total amount with roller conveyor and abrasive return

Factory test and installation scheme

Before shipment, the installation is tested for several hours using steel shot and parts. Before shipment, all equipment passes on the territory of the supplier a comprehensive health check under load. After checking in hard-to-reach places, individual fractions are sometimes retained. PLC for УИД-1900/1200 is included as standard; touch screen specified in the specification УИД-1900/1200. By prior agreement, the customer's representative may be present during the inspection in person or observe it by video link; the program and acceptance criteria are determined for a specific order.

At the customer’s site, two formats are possible: installation management by UralInduktor specialists or the full volume of its own field team. The work is carried out throughout Kazakhstan and the CIS. The start is completed by setting up on products and training operators, which is also issued by the act.

several hours of operation before painting the installation

installation supervision or our own installation crew

Commissioning with control detail

What can be assigned to one engineering team

Shot blasting machine for cleaning rolled steel УИД-1900/1200 is considered as part of the entire site, and not as an isolated machine. For the roller conveyor line, we connect the working section of the chamber with the speed of transportation, the number of turbines, the length of the input and output roller conveyor and the carrying capacity per meter. The performance of the elevator and separator on steel shot is not given out for the release of processed rolled steel.

For the УИД-1900/1200 line, the layout links the chamber to the entry and exit roller conveyor, the rolled steel route, the foundation and the elevator and filter service location. After the contract, we issue the recommended construction sketches and, upon request, we place a free line on the workshop plan with loads and communications. With a consistently smaller range, compare УИД-1900/1200 with УИД-1900/1000; when working size or load is exceeded, check УИД-2300/1200. Departure for checking marks and cargo traffic is possible under separately agreed conditions.

Warranty and service after commissioning

Warranty for УИД-1900/1200 — 18 months. For the equipment of this design, we diagnose turbines, roller transport, elevator, screw conveyor, separator, filter and automation; if the mode is not achieved, we also check steel shot, loading and technological cycle. As a result of the audit, we issue a written opinion; subsequent repair by Gross Metal Engineering LLP is not required. Initial remote diagnostics and a guarantee for the work performed are provided on agreed contractual terms.

Warranty and further operation

The warranty period is 18 months, with the opportunity to discuss extended coverage. The service range includes turbine parts, chamber armor, curtains, elevator ladles and tape, screw conveyor parts, rollers, actuators, filters and control components.

If the mass, profile or production clock changes, the line can be upgraded. The calculation affects the transport part, protection, turbine engines, dust extraction flow rate and the software algorithm.

18-month warranty

spare parts for routine and restoration work

recalculation of the line for new products Preliminary engineering selection of УИД-1900/1200 and the commercial offer are performed free of charge - from 1 working day after receiving sufficient initial data; the cost and terms of payment are fixed in the individual offer and contract. The public price on the site is not posted.

Request a competitive quotation

Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.

UralInduktor · since 2014

Solutions for your production tasks

A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.

Not sure where to start? Let's discuss your task.

Discuss your task
Benefits

In-house production. Control at every stage.

We select the components, assemble and test the equipment. We adapt the solutions to your production task.

Extended warranty
18
months
on equipment

Quality control

We check the components, assembly and units before the equipment is shipped.

Under your task

We adapt the equipment to the work area, operating mode, metal and productivity.

Service support

Diagnostics, selection of spare parts and repair work.

Our own facilities

Production, warehouse and service to support your equipment.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.