UralInduktor · metallurgical equipment manufacturing and supply
We will call back within 10 minutes
Shot blasting equipment

Drum Shot Blasting Machine for Serial Cleaning Parts

Drum shot blasting machine LEDs are used where parts can be treated with a scatter. Fasteners, castings, forgings and forgings move in the work area and consistently fall under the stream of steel shot. There are ten serial installations in the line: from a compact machine with a load to 50 kg to equipment with a metal tape designed for a batch to 3500 kg. We produce them in Kazakhstan, check them on steel shot and real products, then launch them at the customer's enterprise.

We will call back within 10 minutes

Quick estimate and consultation

An engineer will select a model for your metal and send a cost estimate.

s 2014
12 years
Metallurgy and Foundry
across Kazakhstan and CIS
340+
implementations at customer sites
response time
1 day
to a quotation with a calculation
warranty
18 months
for own production equipment
Catalogue

Model range

10 models of own production - from 0,3 to 14 t/h performance. Choose a model in terms of power and tonnage.

serial downloads — from 50 to 3500 kg per cycle

permissible weight of one product — from 5 to 360 kg by model

perforated tape, steel drum or metal tape

normal batch processing time 7–15 minutes

warranty 18 months; installation and commissioning in Kazakhstan and CIS

Technical specifications

УИД-320

Installation power, kW7
Normal processing time, min7–15
Ventilation, m³/h1 400
Max. chamber loading, kg50
Spray cleaningYes

УИД-322

Installation power, kW6,4
Normal processing time, min7–15
Ventilation, m³/h1 600
Max. chamber loading, kg80
Spray cleaningYes

УИД-324

Installation power, kW10,85
Normal processing time, min7–15
Ventilation, m³/h2 000
Max. chamber loading, kg100
Spray cleaningYes

УИД-326

Installation power, kW13,25
Normal processing time, min7–15
Ventilation, m³/h2 500
Max. chamber loading, kg200
Spray cleaningYes

УИД-3110

Installation power, kW9,7
Normal processing time, min7–15
Ventilation, m³/h800
Max. chamber loading, kg300
Spray cleaningYes

УИД-3113

Installation power, kW14,5
Normal processing time, min7–15
Ventilation, m³/h2 000
Max. chamber loading, kg600
Spray cleaningYes

УИД-3210

Installation power, kW28,45
Normal processing time, min7–15
Ventilation, m³/h4 200
Max. chamber loading, kg600
Spray cleaningYes

УИД-3220

Installation power, kW46
Normal processing time, min7–15
Ventilation, m³/h5 600
Max. chamber loading, kg1 000
Spray cleaningYes

УИД-15

Installation power, kW50
Normal processing time, min7–15
Ventilation, m³/h7 500
Max. chamber loading, kg1 500
Spray cleaningYes

УИД-28

Installation power, kW65
Normal processing time, min7–15
Ventilation, m³/h10 500
Max. chamber loading, kg3 500
Spray cleaningYes

When cleaning with a scattering fit the details

The drum circuit gets rid of the piecewise canopy. The working body moves the batch, and the open surfaces are cleaned with steel shot at each new position of the product. Such a process is convenient for the repeated nomenclature of foundry, blacksmith, thermal and mechanical production. At the same time, it is necessary to check whether the parts withstand mutual contact: a thin wall, an accurate thread, a fragile edge or a decorative surface may require another method of placement.

Selection begins with the mass and size of not only the entire portion, but also one product. The technologist then looks at the shape, the material, the initial contamination, the degree of preparation required, and the number of parts per shift. This information is more important than the formal stock in kilograms: too dense load is less mixed, and heavy elements create an increased impact load.

Compact machines УИД-320, УИД-322 and УИД-324

For small parties, three similar positions are provided. The usual duration of the shot blasting treatment is 7–15 minutes; the full clock additionally includes loading and unloading the batch.

In these performances, the party moves on a perforated tape. The difference between the neighboring models is not necessary for the formal division of the catalog: it allows you to correlate the size of the working portion with the real flow of the site. If tens of kilograms of material accumulate slowly, a compact chamber can be more practical than a large, idle between cycles.

Steel working body: УИД-326, УИД-3110 and УИД-3113

When selecting, it is not the abstract hourly performance that is important, but the behavior of a particular casting in the steel working body.

The horizontally positioned steel drum rotates the batch with a gear motor. Such a performance is considered for a more massive range, capable of carrying rolling without clogging and mutual damage.

УИД-3210 and УИД-3220

The party is moved by a perforated tracked tape, the working chamber is protected by manganese armor.

Both units are selected for steady serial flow. The exposure time itself usually lies in the 7–15 minutes range, but the release per hour includes more loading, unloading, and preparatory operations. To calculate the line, these intervals are added, and then check whether the previous section has time to form the next batch.

Metal tape for heavy parts

УИД-15 and УИД-28 are designed for heavy parts.

Metal tape is designed for the load from heavy castings and forgings, but the geometry is still analyzed by the designer. The contact area, stability during movement, the possibility of uniform surface opening and unloading conditions are checked. When the task goes beyond the serial series shown, we design a more powerful or special execution.

Cleaning and Dust Extraction Mode

The average flight speed of shot is 80 m/s. Sa 2½ or Sa 3 under ISO 8501-1 shall be confirmed by a component or sample taking into account the reference surface, the fraction and type shot, dosing, processing time and the availability of the surface for the torch.

Dust collector removes dust from the chamber and abrasive return circuit. Air consumption is selected taking into account the number of turbines, the size of the working area and the technological load. The engineer checks and adjusts the operation mode during commissioning at the facility. dust collector drum series - sleeve cloth, with pulsed cleaning. The air for the drum series is taken from the workshop network, the pressure is 0,55–0,60 MPa. For the drum series, a separate compressor is not supplied. The explosion protection of the drum series is ordered by a separate certified equipment.

Abrasive is not included in the basic supply of the drum series; steel shot for the drum series is selected by questionnaire or sample. For the drum series, 0,5–1,2 mm is usually chosen, by agreement - 0,3–3,2 mm. Abrasive delivery from a proven manufacturer is available for the drum series. The separator of the drum series is air; magnetic and vibration - additional positions on the composition of contaminants.

Manufacturing, inspection and commissioning

The crane and drum shot blasting machine are in continuous production. On our own site we manufacture chambers, frames and transport units, develop electrical circuits and assemble control cabinets. Before painting, each installation works for several hours with steel shot and parts for processing; check the mechanics, abrasive rotation, blocking and dust removal. Before shipment, all equipment passes on the territory of the supplier a comprehensive health check under load. By prior agreement, the customer's representative may be present during the inspection in person or connect via video link; the composition of the tests is determined by the program of a particular delivery.

The delivery is accompanied throughout Kazakhstan and the CIS. Installation supervision or complete installation by our visiting team is possible, then commissioning and commissioning of equipment. Operators are trained on the spot, the result is drawn up by act. Further we provide spare parts, consumable elements, repair and modernization under the new nomenclature.

What can be assigned to one engineering team

When choosing a drum shot blasting machine, the initial data is associated with the design of the entire site. For the drum area, we check not only one-time loading, but also the resistance of the parts to overfilling, the method of supplying the packaging, the time of loading and unloading. The performance of the shift is considered on a full cycle, not on the mass of one batch and not on the duration of the shot blasting machine separately.

For the drum section after the contract, we issue the recommended sketches of the base and, upon request, we place a chamber, loading containers and dust extraction on the workshop plan for free. If the original plan is not enough, on-site measurements on individual terms are possible. We preliminarily check the mass of the party for free, the tolerance of oversleeping and replacement release; we prepare a commercial offer from 1 working day.

Warranty and service after commissioning

Warranty for new drum equipment 18 months. We diagnose and modernize the drum and hoisting shot blasting machine of domestic and foreign manufacturers: we check the working body, turbine, separation, dust extraction and the resistance of parts to overfilling. Based on the results, we issue a written opinion with the reasons for deviations, urgent and planned work and a list of components. An audit can be ordered separately; repair from Gross Metal Engineering LLP is not required. The initial assessment on photos and videos, as well as a guarantee for the work performed are provided on the terms fixed in the contract.

Questions about choosing a drum shot blasting machine

Is it possible to count the output by the mass of one load?

Oh, no. By 7–15 minutes of normal exposure are added loading, unloading and preparation of the next batch; the release is considered on a full cycle and replaceable program.

What parts can not be cleaned without testing?

Parts prone to adhesion, jamming, chipping or deformation are first evaluated by the technologist. Sometimes you need a smaller batch, metal tape or other type of installation.

How to choose a steel shot faction?

According to the material, the original surface, the required roughness and durability of the part. The basic range of 0,5–1,2 mm does not replace the sample; 0,3–3,2 mm is agreed separately.

Guarantee, price and transaction documents

The cost is indicated on request after approval of the equipment.

The proposal requires drawings or photographs of parts, extreme dimensions and weight, batch size, replacement program, description of pollution and the desired result. In addition, specify the available power, place of installation, gate and lifting means of the workshop. According to these data, we will compare the serial versions, determine the refinements and consolidate the program of acceptance tests.

Free preliminary selection

Send the size and weight of the parts, the weight of the batch and photos of the surface - we will pick up the drum set for free and prepare a commercial offer from 1 working day.

The cost of the drum set depends on the load, tape, turbine and dust extraction; it is fixed in an individual offer, without a quickly outdated public price.

Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB
Why us

Why customers choose UralInduktor

A manufacturer with a complete engineering cycle: equipment selection, commissioning and service within one company.

Who it is for
  • Metallurgical enterprises
  • Foundries
  • Mechanical engineering
  • Aluminium production
  • Secondary metallurgy
  • Repair and mechanical workshops
  • Metal heat treatment and melting
01

Manufacturer in key product areas

We manufacture induction melting furnaces and heaters, shot blasting equipment, cooling systems and steel casting ladles, taking responsibility as the manufacturer.

02

Complete engineering cycle

Selection, design, delivery, installation, commissioning, training and service within one company.

03

Broad product portfolio

We address most metallurgical and foundry production requirements, from an individual furnace to a turnkey production area.

04

Practical technical experience

Operating since 2014. Completed projects of varying complexity and engineers with practical commissioning experience.

05

Fast supply of stock items

Some equipment is available from stock, reducing lead times for urgent requirements.

06

Warranty and support

18-month warranty on our own manufactured equipment. Ongoing post-warranty maintenance, spare parts and service.

In touch with you

Let's discuss your task

  • Main contact number+7 (775) 853-40-95Sales department and engineering centre
  • Emailstasgross.ru@gmail.comResponse during the working day
  • Main office addressAstana, Saryarka district, Radisson hotel, office 4
  • Office hoursMon–Fri, 9:00–18:00GMT+5 (Astana)
Comparison of proposals

We'll compare commercial proposals
and offer our own option.

Send us another company's proposal — we will compare the equipment list, configuration and cost.