УИ-10Т-3500М induction furnace for copper, brass and bronze on 10 t
- Shipment in Kazakhstan — 3–10 days, installation supervision — at the customer's site
- Melting of copper, brass and bronze - mass up to 10000 kg per cycle
- 18 months warranty and efficiency up to 95 % own production
Description
УИ-10Т-3500М is a thyristor crucible furnace for open-smelting copper, brass, and bronze. The nominal size is 10 000 kg in copper, the frequency converter is 3500 kW, and the typical operating frequency is 0,5 kHz. The model is considered for large metallurgical and foundry industries.
mass of one melting — 10 000 kg by copper
Power part 3500 kW; 660/50 V/Hz
metal drain - hydraulic
design scenario - a large section of copper alloys with a 10 t garden, mechanized loading and release
Frequency converter, capacitor battery and water-cooled cables for УИ-10Т-3500М independently assemble in Kazakhstan; warranty — 18 months.
What is УИ-10Т-3500М furnace suitable for
УИ-10Т-3500М is designed for an individual project with a single issue up to 10 t of copper or an agreed copper alloy. The configuration is determined by the ladles, the number of filling lines, the composition of the furnace charge, gas removal and the allowable time between the readiness of the melt and release.
Technical specifications
| Model | УИ-10Т-3500М |
|---|---|
| Nominal weight of one copper smelter, kg | 10 000 |
| Rated power frequency converter, kW | 3 500 |
| Lower specific flow reference | from 300 kW·h/t for copper and bronze; for brass - according to the mode |
| Network voltage and frequency, V/Hz | 660 / 50 |
| Calculated current and accepted stock to estimate the supply line | calculated current ≈ 3 293 A at 660 V; with stock 10 % ≈ 3 622 A |
| Estimated total copper cross-section reference point per phase up to 30 m | УИ-10Т-3500М; frequency converter 3 500 kW; network 660 / 50: the numerical reference of the total copper section is not published: the number of cables, the cross section of each vein or bus line determines the designer of the customer according to the actual scheme |
| Water-cooled current supply internal HF-circuit | Not a 380/660 V network supply cable. These are separate flexible water-cooled currents between the frequency converter, the capacitor battery and the melting point. The number, cross-section and length are determined by calculation and specification; for small and medium capacities, the standard is the execution of a 2 cable on each of the two connections, for large complexes the number of parallel cables increases |
| Inductor voltage, B | 2400 |
| Operating frequency, kHz | standard 0,5; other - by calculation and agreement |
| Smelting materials | copper, brass, bronze |
| The body of the melting unit | Steel Welded With Magnetic Wires |
| Tilting mechanism | Hydraulic |
| Configuration of the complex | Base: frequency converter + capacitor battery + 1 melting unit; for small and medium capacities, typically 4 water-cooled internal HF cable (2 + 2); second melting unit - recommended reserve and separate option |
| Revolving Cooling System | calculated and indicated by a separate position |
| Warranty | 18 months |
The design is constantly improving, so the actual mass and dimensions of the equipment are reported on request for the selected execution.
For copper and bronze, the lower engineering benchmark is from 300 kW·h/t with a prepared furnace charge and a steady cycle. For brass, the flow rate is calculated separately, taking into account the composition of the alloy, the release temperature and the permissible losses of zinc. This is not a guaranteed value: the actual consumption depends on the start, condition of the furnace charge, overheating, exposure and organization of work.
Engineering sense of the model УИ-10Т-3500М
This is not a scaled copy of a steel ten-ton furnace: 3 500 kW requires separate electromagnetic and thermal coordination for high-conductive metal. The number of nodes, reservation and infrastructure are assigned by the project.
The nearest smaller model is the УИ-5Т-2500М: 5 000 kg and 2500 kW. The older version is chosen according to the production program, and not for the sake of a formal stock of capacity.
The nominal value of 10 000 kg is the mass of one calculated melting at the project geometry lining, and not release per hour. Performance is obtained from full stroke; it includes cold or hot start, loading, melting, slag, analysis, composition adjustment, overheating, draining and preparation of the next melting.
As the lining wears out naturally, the useful volume of the working cavity increases, so the actual mass of one melting can become higher than the nominal; in some cases, the gain relative to the nominal reaches 30 %. This does not mean allowed overload and is not a criterion of acceptable wear: the working load is determined by the actual condition and safe thickness of the lining, metal density, bath level and stock to the board.
Power supply and cooling
Power input, transformer, switching, and network quality are checked before a connection task is released. frequency converter 3500 kW is powered by 660 / 50 V/Hz; standard operating frequency is 0,5 kHz, voltage circuit inductor is 2400 V. The rated power relative to the rated garden is 350 kW/t; this is a comparative rather than a guaranteed performance measure. A different operating frequency is possible by agreement after the engineering calculation of the converter, oscillatory circuit, inductor, crucible and mixing mode.
The working pressure of cooling thyristor complex is 0,2 MPa (about 2 bar). The required flow rate, heat sink and control points are specified for the agreed execution; this is the working pressure, not the pressure of the pressurization.
For a preliminary assessment of the supply line from the customer ' s distribution device or secondary wrapping of the transformer to the inlet УИ-10Т-3500М at the length of the track not exceeding 30 : Ceiling current ≈ 3 293 And at the 660 V; with reserve 10 % ≈ 3 622 A; the numerical reference point of the aggregate copper section is not published: the number of cables, the section of each housing or tyre line determines the designer of the customer according to the actual pattern. Calculation methodology: P /1,732 × U × 0,93), then stock 10 % by current; for the referenced total copper the calculated density is not more than 3 A/mm². Ratio 0,93 - Prefeasibility; actual IAQ and coefficient power frequency converter It is necessary to confirm its documentation. It's not a finished stamp or cable diagram. The actual number of parallel cables and the nominal section of each housing selects the designer for the permissible current of a particular cable, temperature and manner of laying, grouping, harmonics, voltage drop, protection and short circuit current; the final section may be increased. PE and auxiliary consumers are calculated separately. The mass of the smelting itself does not determine the section of the supply line.
For the УИ-10Т-3500М power project, short circuit currents, a power supply category, a transform transformer circuit, and an acceptable level of harmonics are needed. The total attached load of the site further includes cooling, hydraulics, drawing and mechanization.
Metallurgical constraints
The release temperature is assigned by the alloy brand and method of bottling. Unreasonable exposure increases oxidation, energy consumption and, for zinc-containing alloys, component loss.
Work with a reduced garden on the УИ-10Т-3500М is allowed only after checking the bath level, electrical coordination and mixing mode. Arbitrary unloaded state is not accepted as regular.
Lining and consumables
For УИ-10Т-3500М liner can not be selected only by the model designation or the weight of the seat. For pure copper and tin bronzes, a silicate or high-clay/mullet working mass is considered; for some copper processes, a high-clay system with silicon carbide is possible after compatibility testing. For copper-nickel and copper-iron alloys, a high-soil spinel system is preliminarily considered. For brass, the choice is specified by the content of zinc, fluxes, temperature and aging; local extract is required for vapors and aerosols of zinc.
UralInduktor can pick up and put the kit under the agreed mode of copper/brass/bronze: working mass, coil protection, separation layer, top and sock materials, repair mix, pattern and reserve. Make, quantity, seal, drying and sintering - according to the calculation and instructions of the manufacturer. Increasing the load as the lining wears out to 30 % is not the purpose of the work or the criterion of safe thickness.
Supply scope and boundaries
The final composition of the УИ-10Т-3500М is fixed by the specification. Basic working diagram of the thyristor complex: frequency converter - capacitor battery - one connected melting point. The basic supply includes one smelting unit. For small and medium capacities, four water-cooled cables of the internal high-frequency circuit are typically used: two between the frequency converter and the battery and two between the battery and the melting point. In powerful and multi-pulse complexes, their number, cross-section and length are determined by calculation. The second melting point is offered as a recommended reserve and a separate option. Simultaneous operation of two nodes from one frequency converter is not provided; switching is performed when the voltage is removed according to the established regulations. Network input to frequency converter is a separate three-phase line L1, L2, L3 with PE and is not included in water-cooled connections. Cooling, transformer, hood, foundation, installation and commissioning are listed in separate lines.
After the conclusion of the contract, we provide a passport of agreed execution and a task for the foundation and construction training. The final set of passports and operational documentation is transmitted with the equipment. The task of preparing the site does not replace the working construction documentation: its development is included in the contract separately.
agree for УИ-10Т-3500М crucible or lining, loading method, ladle and local hood;
fix the discharge: hydraulic;
determine for УИ-10Т-3500М the amount of PLC, archiving, energy metering and exchange with ICS;
confirm the metal and the actual mass of issue for УИ-10Т-3500М;
calculate the full cycle of УИ-10Т-3500М: loading, melting, delivery of the composition, release and preparation;
Manufacturing, commissioning and service
The Gross Metal Engineering TROP itself collects thyristor frequency converters (frequency converter), capacitor batteries and water-cooled cables in Kazakhstan. Each cooled component shall be separately leak tested at 6 atm; the entire contour shall be checked after assembly at the same pressure. Prior to shipment, the complex is checked under load at power of 30 %; the customer may participate in person or via video link on the agreed programme.
Thyristor installations are in production at all times; the serial execution of УИ-10Т-3500М starts with 30 calendar days. The exact period depends on the performance and composition of the delivery and is stipulated in the contract. Furnace up to 1,5 t is often supported in availability or production program. Cooling tower УИГ is calculated and specified by a separate entry. The "Gross Metal Engineering" company carries out a chief installation, complete installation, commissioning, process swimmers and training; the guarantee is 18 months.
Information to include in your request
To specify УИ-10Т-3500М, provide the copper, brass and bronze grades, melt mass of 10 000 kg or the required deviation from it, output per shift, charge composition, tapping temperature, available mains supply and power, workshop layout, cooling and automation requirements.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.
