Three levels of verification
1. At the plant: inspection of assembled equipment, protection, cooling and ordered inductor with a part or analogue; photo and video as agreed.
2. In Kazakhstan: re-check completeness and operability with full connection, but without workload.
3. On the customer’s site: trial cycles with details, regime adjustment, training and signing of acts.
What is fixed when commissioning
- correctness of connection, direction of movement and blocking;
- operation of the generator, inductor and cooling system;
- trial mode on customer details;
- actions on start, stop and diagnostics transmitted to the operator;
- the fact of performance of work and training in signed acts.
The volume and cost of departure are determined by the contract. Start-up is not included in the base price automatically.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.