Shot blasting machine for cleaning rolled steel УИД-2500/1000
- Selection of the size for your profile and tonnage 1 Working Day
- Departure of the engineer for measurements to your site, turnkey site project
- Warranty of 18 months on equipment of our own production
Description
УИД-2500/1000 is focused on a very wide, but low flow: sheet, panels and frames up to 2 200 mm width at a height up to 800 mm. The layout helps to handle a large flat nomenclature without unnecessarily increasing the vertical volume of the chamber.
Working size of the product 2 200 × 800 mm by section; product length — by design
Chamber 2 500 × 1 000 mm; roller conveyor up to 1 000 kg/m
8 working turbines with 11–15 kW motors
29 800 m³/h Performance Dust Collector
18 months warranty and on-site launch
Technical specifications
| Maximum part cross-section (W H), mm | 2 200 × 800 |
|---|---|
| Input and output roller conveyor length, mm | by project; typical execution of one side — 12 000 |
| Window size shot blasting chamber (W H), mm | 2 500 × 1 000 |
| Number of turbines, | 8 |
| Preliminary lower limit of total installed power, kW | not less than 118 kW; exact value - by configuration* |
| Maximum linear mass of the part, kg/m | 1 000 |
| Feed speed, m/min | 0,5 – 2,0 |
| Throughput dust trap, m³/h | 29 800 (30 kW) |
| Voltage/Frequency | 380 V / 50 Hz |
| Working hours | automatic; manual operations - for adjustment |
| Management system | PLC — standard; touch screen — complete |
* The table shows the provisional lower limit of the total installed capacity. The exact total power includes turbines, dust extraction, elevator, screw conveyor, roller conveyor and all auxiliary drives and is fixed in the electrical circuit of the agreed configuration. The basic dust collector is a sleeve cloth, with pulse regeneration; 0,55–0,60 MPa workshop air is required, a separate compressor is not included. exploit-proof execution is calculated separately.
For the УИД-2500/1000 line, the steel shot working mixture is selected together with the roller conveyor speed and the number of turbines. The abrasive is supplied separately; a sample on a typical profile shows the cleaning of edges and shelves, and the need for magnetic separation or vibration transport is determined by waste.
Why choose УИД-2500/1000
Catalogue part limit - 2 200 × 800 mm by section; product length - according to the project, pass window - 2 500 × 1 000 mm. The equipment is suitable for sheet blanks, flat panels, low frames and welded sections. The main criterion is a stable stacking of the nomenclature in height 800 mm.
The length of the input and output roller conveyors is set by the project; the typical version for one side is 12 000 mm. A part can be longer if its cross-section and linear mass fit within the model parameters and the support scheme ensures stable movement without tipping over or running off the rollers.
If products rise to 1 000 mm and require a linear load of 1 500 kg/m, УИД-2500/1200. applies With the height of 1 200 mm and the need for ten turbines, УИД-2500/1400. is considered Checking neighboring options allows you to choose a suitable working area for a real stream.
sheet width up to 2 200 mm
flat welded panels
Long-length low frames
Roller conveyor for large-format sheet
The permissible linear mass is 1 000 kg/m. For a wide sheet, the deflection, the number of supports and the position of the edges on the rollers are separately checked. The supply and transfer parts shall provide a smooth passage without lateral care, especially with variable thickness of the workpieces.
Transport is designed together with the logistics of the workshop. You can change the length of the sections, drive, height and cargo characteristics, add pairing with the drive or the next operation. The free zone on both sides of the chamber is taken into account even before the approval of the layout.
1 000 kg/m on the basic roller conveyor
Large sheet deflection check
linking transport sections to the route of the part
The working cycle of eight turbines
The surface is treated 8 turbines with a capacity of 11–15 kW each. The sheet passes the chamber at a speed of 0,5–2,0 m/min, and the overlapping streams of steel shot affect the open sides. The turbine design retains the same consumables for both engine variants.
The average flight speed of shot is 80 m/s. For class Sa 2½ or Sa 3, engineers shall determine the fraction, flow and time by reference or corrosion. The test sheet shows a uniform width and helps to capture the speed of the wigang.
cleaning of rolling scale by sheet width
preparation of panels for anti-corrosion coating
Repeated mode for serial flow
Air flow rate and installed capacity
Dust collector has 29 800 m³/h performance and 30 kW engine. It removes dust from the chamber; the flow calculation takes into account eight turbines, the volume of the work area and the processing mode. After installation, the dust extraction is checked in the working cycle and adjusted when commissioning.
Turbines together with dust removal give confirmed 118–150 kW. To the total installed power is added the elevator, screw conveyor, all drive rollers and auxiliary consumers. The final figure is determined by the complete electrical scheme of the agreed equipment.
Assembly, the electrical cabinet, and testing are carried out by UralInduktor at its own site. The design is adapted to the customer's production conditions, and the layout of the units is chosen with servicing of the wide roller conveyor in mind. The PLC for УИД-2500/1000 is included in the standard configuration; the touchscreen is specified in the УИД-2500/1000 specification.
29 800 m³/h dust removal performance
30 kW Dust Extraction Engine
118–150 kW sum turbine and dust extraction parts
Control before shipment and entering into the stream
Before finishing coloring, several hours of work with steel shot and suitable details are carried out. The factory team evaluates roller conveyor, turbines, abrasive circulation, dust removal, automation and protection. Before shipment, all equipment passes on the territory of the supplier a comprehensive health check under load. By prior agreement, the customer's representative may be present during the inspection in person or observe it by video link; the program and acceptance criteria are determined for a specific order.
On site, installation supervision or full installation by our own crew is provided. Our specialists work in Kazakhstan and the CIS, start up the mechanisms, and adjust the feed on the customer's material. Training of the shift crew concludes with a signed certificate.
factory work on real details
installation support throughout the supply area
start-up with sheet quality check
What can be assigned to one engineering team
Shot blasting machine for cleaning rolled steel УИД-2500/1000 is considered as part of the entire site, and not as an isolated machine. For the roller conveyor line, we connect the working section of the chamber with the speed of transportation, the number of turbines, the length of the input and output roller conveyor and the carrying capacity per meter. The performance of the elevator and separator on steel shot is not given out for the release of processed rolled steel.
For the УИД-2500/1000 line, the layout links the chamber to the entry and exit roller conveyor, the rolled steel route, the foundation and the elevator and filter service location. After the contract, we issue the recommended construction sketches and, upon request, we place a free line on the workshop plan with loads and communications. With a consistently smaller range, compare УИД-2500/1000 with УИД-2300/1400; when working size or load is exceeded, check УИД-2500/1200. Departure for checking marks and cargo traffic is possible under separately agreed conditions.
Warranty and service after commissioning
Warranty for УИД-2500/1000 — 18 months. For the equipment of this design, we diagnose turbines, roller transport, elevator, screw conveyor, separator, filter and automation; if the mode is not achieved, we also check steel shot, loading and technological cycle. As a result of the audit, we issue a written opinion; subsequent repair by Gross Metal Engineering LLP is not required. Initial remote diagnostics and a guarantee for the work performed are provided on agreed contractual terms.
Guarantees and upgrades
The warranty is 18 months; extended period is discussed depending on the operating conditions. Turbine elements, chamber armor, curtains and seals, steel shot return units, rollers, filters and control components are available for repair.
When another sheet format appears, you can change the transport, working protection, turbine engines, dust extraction and line algorithm. A larger catalog is also being designed.
18 months warranty period
Availability of expendable items for maintenance
The preliminary engineering selection of УИД-2500/1000 and the commercial offer are carried out free of charge - from 1 working day after receiving sufficient initial data; the cost and terms of payment are fixed in the individual offer and contract. The public price on the site is not posted.
Request a competitive quotation
Send another supplier's quotation for a comparison based on our manufacturing and stock capabilities.
Solutions for your production tasks
A full cycle of work with equipment for foundry, metallurgical and machine-building enterprises.
- 01Equipment selectionTailored to your process task
- 02Production area upgradeUpdating existing equipment
- 03Production start-upA new line of production
- 04Production supportStable operation of existing equipment
- 05Service and spare partsMaintenance and supply of components
Not sure where to start? Let's discuss your task.
Discuss your taskIn-house production. Control at every stage.
We select the components, assemble and test the equipment. We adapt the solutions to your production task.
Quality control
We check the components, assembly and units before the equipment is shipped.
Under your task
We adapt the equipment to the work area, operating mode, metal and productivity.
Service support
Diagnostics, selection of spare parts and repair work.
Our own facilities
Production, warehouse and service to support your equipment.
Get an equipment selection or a project calculation — fill in the form
An engineer will contact you, clarify the task and suggest a solution for your production process.
- Equipment selection for your metal, operating mode and output
- Cost, lead time and delivery arrangements
- Response within one working day
Let's discuss your task
- Main contact number+7 (775) 853-40-95
- Main office addressAstana, Saryarka district, Radisson hotel, office 4
- Office hoursMon–Fri, 9:00–18:00
We'll compare commercial proposals
and offer our own option.
Send us another company's proposal — we will compare the equipment list, configuration and cost.