COMPLETED PROJECT

Supply and start-up of the УИ-1Т-800 induction melting furnace in Pavlodar

Melting area with the УИГ-80Т cooling tower and a lining mix selected for nickel silver

800 kWFurnace power
1000 kgDesign loading
УИГ-80ТCooling station
Main project photo

Task

Organize a melting area for remelting nickel silver and select a furnace, cooling system and lining mix.

Solution

«UralInduktor» specialists selected the УИ-1Т-800 induction melting furnace and the УИГ-80Т cooling tower for cooling the melting equipment. In addition, a lining material was selected to suit the customer's task.

Services performed

Design, manufacture and supply of equipment; commissioning; selection of lining mix and staff training.

Result

The melting complex was put into operation. A nickel silver remelting area with an induction furnace and a cooling station was set up at the enterprise in Pavlodar.

Scope of supply and specifications

Equipment / parameterSpecifications and purpose
Induction melting furnace УИ-1Т-800Power 800 kW; loading up to 1000 kg
Dual-circuit cooling tower УИГ-80ТCooling of melting equipment
Lining mixSelection for melting nickel silver

Letter of appreciation

Enlarged image
Selection and estimate

Get an equipment selection or a project calculation — fill in the form

An engineer will contact you, clarify the task and suggest a solution for your production process.

  • Equipment selection for your metal, operating mode and output
  • Cost, lead time and delivery arrangements
  • Response within one working day

Equipment selection and estimate request

Technical specification or equipment passport PDF, DOC, XLS, JPG or PNG, up to 10 MB